—°F Boise, ID
◈ Cross-Vertical Intelligence · Treasure Valley · Boise Standard

Procurement Public Spending ↔ relates to ↔ Energy Utilities

23 Wikipedia bridge articles confirmed in both vertical ledgers. 256 deterministic cross-vertical edges. 6,536 external source links harvested. Every edge provenance-stamped. Every claim auditable.

23 QID Bridge Articles
256 Cross Edges
6,536 External Sources
292 Wikipedia Articles
24 🌲 Evergreen
192 🌿 Branch
HIGH SIGNAL · refinery-treasurevalley-v1.0.0
◈ Machine-Readable Schema
Deterministic Cross-Vertical Summary
PASS 2 · ZERO LLM
Entities Compared
Procurement Public Spending
× Energy Utilities
QID Bridge Articles
23
confirmed Wikipedia overlap
Total Cross Edges
256
External Sources Harvested
6,536
from Wikipedia external links
Geography
Treasure Valley, Ada County, Canyon County, Idaho, United States
Gate Tier
high
Haiku FAQ generated
Strongest Edge
Infrastructure
score: 1.0000  ·  type: exact_title_cross  ·  40 shared tokens
QID Bridge Titles (20)
InfrastructureWastewater treatmentApprenticeshipPublic worksBoise State UniversityPublic utilityCollege of Western IdahoTreasure ValleyIdaho PowerNampa, IdahoMergers and acquisitionsSanitary sewerPrivate equityCivil engineeringWater supplyBoise, IdahoAda County, IdahoCaldwell, IdahoMunicipal solid wasteKuna, Idaho
Shared Semantics (20 tokens)
idahoboisepublicpopulationcapitaladainfrastructureprivatesystemswaterroadssupplywastemunicipalbusinesscollegecanyonmilesdevelopmentdifferent
Pipeline
refinery-treasurevalley-v1.0.0
Generated
2026-07-17 22:52:32 UTC
Content Hash
f2c7fc279e6fff67
◈ Wikipedia Bridge Articles
QID Overlap — Confirmed in Both Vertical Ledgers
23 BRIDGES
Infrastructure
Q121359 EXACT TITLE 1.000
QID OVERLAP: Q121359 in procurement_public_spending (tier:evergreen) and energy_utilities (tier:evergreen). | SHARED TOKENS (40): "agencies", "change", "cultural", "development", "different", "distinct", "economic", "economy", "educational", "emergency", "environment", "environmental", "facilities", "firms", "goal", "industrial", "infrastructure", "institutions", "law", "maintain".... | EXACT TITLE in procurement_public_spending: "Infrastructure". | EXACT TITLE in energy_utilities: "Infrastructure".
agencieschangeculturaldevelopmentdifferentdistincteconomiceconomyeducationalemergencyenvironmentenvironmentalfacilitiesfirmsgoalindustrialinfrastructureinstitutionslawmaintainmanagementnetworksofficialparksphysicalpolicyprivateprogramspublicroads+10
at maintain the economic, health, social, environmental, and cultural standards of a place. This includes educational programs, official statistics, parks and recreational facilities, law enforcement agencies, and emergency services. Classifications A 1987 US National Research Council panel adopted the term "public works infrastructure", referring to: "... both specific functional modes – highways, streets, roads, and bridges; mass transit; airports and airways; water supply and water resources; wastewater management; solid-waste treatment and disposal; electric power generation and transmission; telecommunications; and hazardous waste management – and the combined system these modal elements comprise.
Transport infrastructure – vehicles, road, rail, cable and financing of transport Aviation infrastructure – air traffic control technology in aviation Rail transport – trackage, signals, electrification of rails Road transport – roads, bridges, tunnels Critical infrastructure – assets required to sustain human life Energy infrastructure – transmission and storage of fossil fuels and renewable sources Information and communication infrastructure – systems of information storage and distribution Public capital – government-owned assets Public works – municipal infrastructure, maintenance functions and agencies Municipal solid waste – generation, collection, management of trash/garbage Sustainable urban infrastructure – technology, architecture, policy for sustainable living Water supply network – the distribution and maintenance of water supply Wastewater infrastructure – disposal and treatment of wastewater Infrastructure-based development
Civil defense planners and developmental economists generally refer to both hard and soft infrastructure, including public services such as schools and hospitals, emergency services such as police and fire fighting, and basic services in the economic sector. The notion of infrastructure-based development combining long-term infrastructure investments by government agencies at central and regional levels with public private partnerships has proven popular among economists in Asia (notably Singapore and China), mainland Europe, and Latin America. Military Military infrastructure is the buildings and permanent installations necessary for the support of military forces, whether they are stationed in bases, being deployed or engaged in operations.
Wastewater treatment
Q20127660 EXACT TITLE 1.000
QID OVERLAP: Q20127660 in procurement_public_spending (tier:evergreen) and energy_utilities (tier:evergreen). | SHARED TOKENS (17): "agricultural", "another", "environment", "facility", "industrial", "municipal", "process", "processes", "purpose", "resulting", "separation", "treatment", "type", "uses", "waste", "wastewater", "water". | EXACT TITLE in procurement_public_spending: "Wastewater treatment". | EXACT TITLE in energy_utilities: "Wastewater treatment".
agriculturalanotherenvironmentfacilityindustrialmunicipalprocessprocessespurposeresultingseparationtreatmenttypeuseswastewastewaterwater
age treatment plant. In the latter case the industry typically performs on-site pretreatment of the waste, before it is sent to the municipal plant. Other types of wastewater treatment plants include agricultural wastewater treatment and leachate treatment plants. The term "wastewater treatment" is often used to mean "sewage treatment". Common processes in wastewater treatment include phase separation, such as sedimentation, various biological and chemical processes, such as oxidation, and polishing. The main by-product from wastewater treatment plants is a type of sludge that is usually treated in the same or another wastewater treatment plant. Biogas can be another by-product if the process uses anaerobic treatment. Treated wastewater can be reused as reclaimed water. The main purpose of wastewater treatment is for the treated wastewater to be able to be disposed or reused safely.
Types of treatment plants Wastewater treatment plants may be distinguished by the type of wastewater to be treated. There are numerous processes that can be used to treat wastewater depending on the type and extent of contamination. The treatment steps include physical, chemical and biological treatment processes. Types of wastewater treatment plants include: Sewage treatment plants Industrial wastewater treatment plants Agricultural wastewater treatment plants Leachate treatment plants Sewage treatment plants Industrial wastewater treatment plants Agricultural wastewater treatment plants Leachate treatment plants Leachate treatment plants are used to treat leachate from landfills.
mentation, various biological and chemical processes, such as oxidation, and polishing. The main by-product from wastewater treatment plants is a type of sludge that is usually treated in the same or another wastewater treatment plant. Biogas can be another by-product if the process uses anaerobic treatment. Treated wastewater can be reused as reclaimed water. The main purpose of wastewater treatment is for the treated wastewater to be able to be disposed or reused safely.
Apprenticeship
Q20773771 EXACT TITLE 1.000
QID OVERLAP: Q20773771 in procurement_public_spending (tier:branch) and energy_utilities (tier:evergreen). | SHARED TOKENS (16): "cases", "certification", "competence", "complete", "field", "formal", "labor", "license", "outside", "potential", "professional", "reach", "regulated", "system", "training", "working". | EXACT TITLE in energy_utilities: "Apprenticeship".
casescertificationcompetencecompletefieldformallaborlicenseoutsidepotentialprofessionalreachregulatedsystemtrainingworking
nge for their continued labor for an agreed period after they have achieved measurable competencies. Apprenticeship lengths vary significantly across sectors, professions, roles and cultures. In some cases, people who successfully complete an apprenticeship can reach the "journeyman" or professional certification level of competence. In other cases, they can be offered a permanent job at the company that provided the placement.
ross sectors, professions, roles and cultures. In some cases, people who successfully complete an apprenticeship can reach the "journeyman" or professional certification level of competence. In other cases, they can be offered a permanent job at the company that provided the placement.
Expansion into services, agriculture, and mining sectors Cost-sharing between the industry and government Formalization of informal apprenticeships Alignment with the National Vocational Qualifications Framework (Pakistan NVQF) Increased female participation Financial incentives for industries exceeding apprentice requirements Joint assessment and certification by the industry, Chamber of Commerce, and government Switzerland In Switzerland, after the end of compulsory schooling, two thirds of young people follow a vocational training. Ninety percent of them are in the dual education system. Switzerland has an apprenticeship similarly to Germany and Austria. The educational system is ternar, which is basically dual education system with mandatory practical courses.
Public works
Q627364 EXACT TITLE 1.000
QID OVERLAP: Q627364 in procurement_public_spending (tier:evergreen) and energy_utilities (tier:evergreen). | SHARED TOKENS (29): "assets", "broader", "buildings", "capital", "category", "construction", "directly", "drinking", "economic", "employment", "environmental", "facilities", "financed", "hospitals", "infrastructure", "municipal", "parks", "physical", "private", "projects".... | EXACT TITLE in procurement_public_spending: "Public works". | EXACT TITLE in energy_utilities: "Public works".
assetsbroaderbuildingscapitalcategoryconstructiondirectlydrinkingeconomicemploymentenvironmentalfacilitiesfinancedhospitalsinfrastructuremunicipalparksphysicalprivateprojectspublicroadssafetyschoolssupplytreatmentuseswaterworks
and treatment), public spaces (beaches, parks, and public squares), transport infrastructure (airports, bridges, canals, pipelines, ports, railroads, and roads) and other, usually long-term, physical assets and facilities. Though often interchangeable with public capital and public infrastructure, public works does not necessarily carry an economic component, thereby being a broader term. Construction may be undertaken either by directly employed labour or by a private operator. Public works has been encouraged since antiquity.
y long-term, physical assets and facilities. Though often interchangeable with public capital and public infrastructure, public works does not necessarily carry an economic component, thereby being a broader term. Construction may be undertaken either by directly employed labour or by a private operator. Public works has been encouraged since antiquity.
eater community. They include environmental protection (drinking water protection, preservation and restoration of forests and wetlands, soil erosion reduction, wildlife habitat preservation), public buildings (hospitals, municipal buildings, and schools), public services (dams, electrical grid, sewage treatment, and water supply and treatment), public spaces (beaches, parks, and public squares), transport infrastructure (airports, bridges, canals, pipelines, ports, railroads, and roads) and other, usually long-term, physical assets and facilities. Though often interchangeable with public capital and public infrastructure, public works does not necessarily carry an economic component, thereby being a broader term. Construction may be undertaken either by directly employed labour or by a private operator. Public works has been encouraged since antiquity.
Boise State University
Q891082 EXACT TITLE 1.000
QID OVERLAP: Q891082 in procurement_public_spending (tier:evergreen) and energy_utilities (tier:evergreen). | SHARED TOKENS (21): "activity", "among", "boise", "business", "college", "compete", "division", "education", "engineering", "idaho", "independent", "institution", "million", "program", "programs", "public", "reported", "research", "school", "university".... | EXACT TITLE in procurement_public_spending: "Boise State University". | EXACT TITLE in energy_utilities: "Boise State University".
activityamongboisebusinesscollegecompetedivisioneducationengineeringidahoindependentinstitutionmillionprogramprogramspublicreportedresearchschooluniversitywest
, Arts & Sciences, and Education; MPA program in the School of Public Service; and the MPH program in the College of Health Sciences. It is classified among "R2: Doctoral Universities – High research activity".
The university also has an honors college. Within the College of Arts and Sciences is the School of the Environment, approved by the Idaho State Board of Education in 2022 and established in 2023. Boise State's fall enrollment in 2016 was 23,886 students, and approximately 76 percent of these students were Idaho residents. More than 90 percent of Boise State's first-year students come directly from high school. In the 2015–16 school year, Boise State awarded diplomas to 3,916 distinct graduates, including 18 doctorates, 10 education specialists, 670 master's and 2,998 bachelor's degrees. The university is classified among "R2: Doctoral Universities – High research spending and doctorate production".
Boise State University (BSU) is a public research university in Boise, Idaho, United States. Founded in 1932 by the Episcopal Church, it became an independent junior college in 1934 and has been awarding baccalaureate and master's degrees since 1965. It became a public institution in 1969. Boise State offers more than 100 graduate programs, including a variety of MBA programs and the MAcc program in the College of Business and Economics; master's and PhD programs in the Colleges of Engineering, Arts & Sciences, and Education; MPA program in the School of Public Service; and the MPH program in the College of Health Sciences. It is classified among "R2: Doctoral Universities – High research activity".
Public utility
Q1951366 EXACT TITLE 1.000
QID OVERLAP: Q1951366 in procurement_public_spending (tier:branch) and energy_utilities (tier:evergreen). | SHARED TOKENS (28): "cannot", "compete", "competing", "control", "costs", "different", "entity", "federal", "infrastructure", "institution", "large", "local", "maintains", "market", "multiple", "operates", "point", "produce", "public", "represents".... | EXACT TITLE in energy_utilities: "Public utility".
cannotcompetecompetingcontrolcostsdifferententityfederalinfrastructureinstitutionlargelocalmaintainsmarketmultipleoperatespointproducepublicrepresentssubjectsupplysystemstransportationutilitiesutilitywastewater
y, or natural gas pipelines, have natural monopoly characteristics. A monopoly can occur when it finds the best way to minimize its costs through economies of scale to the point where other companies cannot compete with it. If the infrastructure already exists in a given area, minimal benefit is gained through competing. In other words, these industries are characterized by economies of scale in production. Though it can be mentioned that these natural monopolies are handled or watched by a public utilities commission, or an institution that represents the government. There are many different types of public utilities. Some, especially large companies, offer multiple products, such as electricity and natural gas. Other companies specialize in a specific product, such as water. Modern public utilities may also be partially (or completely) sourced from clean and renewable energy in order to produce sustainable electricity. Of these, wind turbines and solar panels are those used most frequently. Whether broadband internet access should be a public utility is a question that was being discussed with the rise of internet usage. This is a question that was being asked due to the telephone service being considered a public utility. Since arguably broadband internet access has taken over telephone service, perhaps it should be a public utility. The Federal Communications Commission (FCC) in the United States in 2015 made its stance on this issue clear.
Monopoly vs. competition Public utilities were historically regarded as natural monopolies because the infrastructure required to produce and deliver a product such as electricity or water is very expensive to build and maintain. Once assets such as power plants or transmission lines are in place, the cost of adding another customer is small, and duplication of facilities would be wasteful. As a result, utilities were either government monopolies, or if investor-owned, regulated by a public utilities commission. In the electric utility industry, the monopoly approach began to change in the 1990s. In 1996, the Federal Energy Regulatory Commission (FERC) issued its Order No. 888, which mandated that electric utilities open access to their transmission systems to enhance competition and "functionally unbundle" their transmission service from their other operations. The order also promoted the role of an independent system operator to manage power flow on the electric grid. Later, FERC Order No. 889 established an electronic information system called OASIS (open access same-time information system) which would give new users of transmission lines access to the same information available to the owner of the network. The result of these and other regulatory rulings was the eventual restructuring of the traditional monopoly-regulated regime to one in which all bulk power sellers could compete. A further step in industry restructuring, "customer choice", followed in some 19 states, giving retail electric customers the option to be served by non-utility retail power marketers. Ownership structure Public utilities can be privately owned or publicly owned. Publicly owned utilities include cooperative and municipal utilities. Municipal utilities may actually include territories outside of city limits or may not even serve the entire city. Cooperative utilities are owned by the customers they serve. They are usually found in rural areas. Publicly owned utilities are non-profit.
lly just utility) is an organization that maintains the infrastructure for a public service (often also providing a service using that infrastructure). Public utilities are subject to forms of public control and regulation ranging from local community-based groups to statewide government monopolies. Public utilities are meant to supply goods and services that are considered essential; water, gas, electricity, telephone, waste disposal, and other communication systems represent much of the public utility market. The transmission lines used in the transportation of electricity, or natural gas pipelines, have natural monopoly characteristics. A monopoly can occur when it finds the best way to minimize its costs through economies of scale to the point where other companies cannot compete with it. If the infrastructure already exists in a given area, minimal benefit is gained through competing. In other words, these industries are characterized by economies of scale in production. Though it can be mentioned that these natural monopolies are handled or watched by a public utilities commission, or an institution that represents the government. There are many different types of public utilities. Some, especially large companies, offer multiple products, such as electricity and natural gas. Other companies specialize in a specific product, such as water. Modern public utilities may also be partially (or completely) sourced from clean and renewable energy in order to produce sustainable electricity. Of these, wind turbines and solar panels are those used most frequently. Whether broadband internet access should be a public utility is a question that was being discussed with the rise of internet usage. This is a question that was being asked due to the telephone service being considered a public utility. Since arguably broadband internet access has taken over telephone service, perhaps it should be a public utility. The Federal Communications Commission (FCC) in the United States in 2015 made its stance on this issue clear.
College of Western Idaho
Q5146875 EXACT TITLE 1.000
QID OVERLAP: Q5146875 in procurement_public_spending (tier:evergreen) and energy_utilities (tier:evergreen). | SHARED TOKENS (28): "ada", "board", "boise", "canyon", "classes", "college", "counties", "cwi", "development", "education", "governed", "idaho", "large", "nampa", "population", "programs", "public", "reported", "residents", "southwest".... | EXACT TITLE in procurement_public_spending: "College of Western Idaho". | EXACT TITLE in energy_utilities: "College of Western Idaho".
adaboardboisecanyonclassescollegecountiescwidevelopmenteducationgovernedidaholargenampapopulationprogramspublicreportedresidentssouthweststudentstechnicalthroughouttransfertreasurevalleywesternworkforce
ommunity colleges along with the College of Eastern Idaho, College of Southern Idaho and North Idaho College, in Idaho and is governed by a five-member board of trustees elected at large by voters in Ada and Canyon counties. CWI offers over 120 programs in the areas of Academic Transfer, Dual Credit, Career and Technical Education, Workforce Development, and Adult Education. In fall of 2023, CWI served 21,359 credit students and 14,951 noncredit students. CWI reported the gender of their students to be 55% female and 45% male.
CWI served 21,359 credit students and 14,951 noncredit students. CWI reported the gender of their students to be 55% female and 45% male. Idaho residents comprised 98% of CWI's student population and Ada County residents were 49%, while 28% were Canyon County residents. History Prior to the creation of CWI, Boise was one of the largest metropolitan statistical areas in the United States without a community college. CWI was created on May 22, 2007, when voters of Canyon and Ada counties passed a measure to allow the formation of the new community college district. In June 2007, the Albertson Foundation announced it was donating $10 million to help found the college. In July 2007, the Idaho State Board of Education selected an initial five-member board of trustees. The following month Boise State University faculty member Dennis Griffin was named to a two-year term as the college's first president and CWI began offering academic classes on January 20, 2009, with an enrollment of over 1,100 students. In the summer of 2009 the professional-technical programs from Boise State University's Selland College of Applied Technology transitioned to CWI. By the fall 2009 semester, CWI enrollment had expanded to over 3,600 students. In January 2010, CWI applied for accreditation from the Northwest Commission on Colleges and Universities (NWCCU). NWCCU granted candidacy status at the associate degree level in 2012 and initial accreditation in 2016. President Griffin retired in August 2009 and was succeeded by Bert Glandon. After serving as president for 12 years, Glandon retired from CWI on May 15, 2021. The college's board of trustees named Denise Aberle-Cannata the interim president. CWI Board of Trustees extended an offer to Gordon Jones on Dec. 9, 2021 to be the next president at College of Western Idaho. Gordon Jones accepted the position of President at CWI and began his tenure as the third president in CWI's history on Jan.
History Prior to the creation of CWI, Boise was one of the largest metropolitan statistical areas in the United States without a community college. CWI was created on May 22, 2007, when voters of Canyon and Ada counties passed a measure to allow the formation of the new community college district. In June 2007, the Albertson Foundation announced it was donating $10 million to help found the college. In July 2007, the Idaho State Board of Education selected an initial five-member board of trustees. The following month Boise State University faculty member Dennis Griffin was named to a two-year term as the college's first president and CWI began offering academic classes on January 20, 2009, with an enrollment of over 1,100 students. In the summer of 2009 the professional-technical programs from Boise State University's Selland College of Applied Technology transitioned to CWI. By the fall 2009 semester, CWI enrollment had expanded to over 3,600 students. In January 2010, CWI applied for accreditation from the Northwest Commission on Colleges and Universities (NWCCU). NWCCU granted candidacy status at the associate degree level in 2012 and initial accreditation in 2016. President Griffin retired in August 2009 and was succeeded by Bert Glandon. After serving as president for 12 years, Glandon retired from CWI on May 15, 2021. The college's board of trustees named Denise Aberle-Cannata the interim president. CWI Board of Trustees extended an offer to Gordon Jones on Dec. 9, 2021 to be the next president at College of Western Idaho. Gordon Jones accepted the position of President at CWI and began his tenure as the third president in CWI's history on Jan.
Treasure Valley
Q7836726 EXACT TITLE 0.940
QID OVERLAP: Q7836726 in procurement_public_spending (tier:evergreen) and energy_utilities (tier:evergreen). | SHARED TOKENS (12): "agricultural", "association", "boise", "idaho", "land", "local", "region", "resources", "rural", "treasure", "valley", "western". | EXACT TITLE in procurement_public_spending: "Treasure Valley". | EXACT TITLE in energy_utilities: "Treasure Valley".
agriculturalassociationboiseidaholandlocalregionresourcesruraltreasurevalleywestern
, coined the name "Treasure Valley" in 1959 to reflect the treasure chest of resources and opportunities that the region offered. The valley has a very diverse terrain, from sage flatlands, to mesas, agricultural areas, and urbanized areas. As the Boise Metropolitan Area grows, more and more undeveloped and agricultural land is being urbanized. History Settling the region The tribes that roamed the area, specifically, were the Northern Paiute and Shoshone. In 1834, Thomas McKay built the original Fort Boise, in the area near present-day Parma, which was run for a time by Francois Payette. It later was moved because of flooding troubles and was abandoned in 1854. The Oregon Trail runs through the Treasure Valley. The valley was settled for the most part by ranchers and farmers, initially to supply the gold and silver mining communities in the higher elevations nearby: Idaho City in the Boise Basin and Silver City in the Owyhees. A new Fort Boise was constructed by the U.S. Army in 1863 in present-day Boise, from which the city grew.
ern Oregon to Boise, and is the most populated area in Idaho. Historically, the valley had been known as the Lower Snake River Valley or the Boise River Valley. Pete Olesen, president of the valley's association of local Chambers of Commerce, coined the name "Treasure Valley" in 1959 to reflect the treasure chest of resources and opportunities that the region offered. The valley has a very diverse terrain, from sage flatlands, to mesas, agricultural areas, and urbanized areas.
The Treasure Valley is a valley in the western United States, primarily in southwestern Idaho, where the Payette, Boise, Weiser, Malheur, and Owyhee rivers drain into the Snake River. It includes all the lowland areas from Vale in rural eastern Oregon to Boise, and is the most populated area in Idaho. Historically, the valley had been known as the Lower Snake River Valley or the Boise River Valley. Pete Olesen, president of the valley's association of local Chambers of Commerce, coined the name "Treasure Valley" in 1959 to reflect the treasure chest of resources and opportunities that the region offered. The valley has a very diverse terrain, from sage flatlands, to mesas, agricultural areas, and urbanized areas.
I
Q3147780 EXACT TITLE 0.880
QID OVERLAP: Q3147780 in procurement_public_spending (tier:evergreen) and energy_utilities (tier:evergreen). | SHARED TOKENS (9): "around", "business", "distribution", "generally", "idaho", "operates", "power", "regulated", "utility". | EXACT TITLE in procurement_public_spending: "Idaho Power". | EXACT TITLE in energy_utilities: "Idaho Power".
aroundbusinessdistributiongenerallyidahooperatespowerregulatedutility
mission and distribution of electricity in eastern Oregon and southern Idaho. It is a subsidiary of IDACORP, Inc. The company's 24,000-square-mile (62,000 km2) service area generally follows the area around the Snake River and its tributaries. Idaho Power owns and operates 17 hydroelectric dams and three natural gas power plants.
ricity sold by IPC was 36.8% hydroelectric, 15.4% natural gas, 13.0% coal, 9.8% wind, 5.4% solar, and, 2.3% geothermal, biomass & other, and 17.3% purchased from other generation companies. History Idaho Power Company originally filed for incorporation in Maine on May 6, 1915. It was reincorporated in Idaho as a subsidiary of IDACORP, Inc on October 1, 1998. This was followed by the purchase of the assets of five small southern Idaho power companies: Idaho-Oregon Light & Power; Great Shoshone and Twin Falls Water Power; Idaho Railway, Light & Power; Idaho Power & Light; and Southern Idaho Water Power Company. In 2018 Idaho Power sponsored the annual "Drive Electric Week" car show event at the state capitol. At the show people can learn about electric vehicles. Interest in electric vehicles has increased because of changing gas prices, improvements in battery technology, concerns for the environment and federal tax incentives for buying electric vehicles. To respond to customer interest, Idaho Power added tools to its website to guide customers investigating purchasing an electric vehicle. In 2019, Idaho Power set a goal to provide 100-percent clean energy by 2045. In addition to its hydropower facilities, which typically meet almost half its customers’ energy demands, Idaho Power plans additional investments in wind, solar and other clean sources. Clean energy resources are becoming more affordable, which could help Idaho Power accomplish its goal while keeping prices fair. Grid upgrades and battery-storage technology should help maintain Idaho Power's impressive reliability while moving the company closer to its goal. Continued energy efficiency efforts will help. Clean energy initiatives are not new to Idaho Power. In 2009, the company adopted a resolution to reduce carbon emissions. Idaho Power has reduced its carbon emissions intensity — measured in pounds of carbon dioxide (CO2) per megawatt-hour — by almost 50 percent since 2005.
3% geothermal, biomass & other, and 17.3% purchased from other generation companies. History Idaho Power Company originally filed for incorporation in Maine on May 6, 1915. It was reincorporated in Idaho as a subsidiary of IDACORP, Inc on October 1, 1998. This was followed by the purchase of the assets of five small southern Idaho power companies: Idaho-Oregon Light & Power; Great Shoshone and Twin Falls Water Power; Idaho Railway, Light & Power; Idaho Power & Light; and Southern Idaho Water Power Company. In 2018 Idaho Power sponsored the annual "Drive Electric Week" car show event at the state capitol. At the show people can learn about electric vehicles. Interest in electric vehicles has increased because of changing gas prices, improvements in battery technology, concerns for the environment and federal tax incentives for buying electric vehicles. To respond to customer interest, Idaho Power added tools to its website to guide customers investigating purchasing an electric vehicle. In 2019, Idaho Power set a goal to provide 100-percent clean energy by 2045. In addition to its hydropower facilities, which typically meet almost half its customers’ energy demands, Idaho Power plans additional investments in wind, solar and other clean sources. Clean energy resources are becoming more affordable, which could help Idaho Power accomplish its goal while keeping prices fair. Grid upgrades and battery-storage technology should help maintain Idaho Power's impressive reliability while moving the company closer to its goal. Continued energy efficiency efforts will help. Clean energy initiatives are not new to Idaho Power. In 2009, the company adopted a resolution to reduce carbon emissions. Idaho Power has reduced its carbon emissions intensity — measured in pounds of carbon dioxide (CO2) per megawatt-hour — by almost 50 percent since 2005.
Nampa, Idaho
Q622633 QID OVERLAP 0.800
QID OVERLAP: Q622633 in procurement_public_spending (tier:branch) and energy_utilities (tier:branch). | SHARED TOKENS (15): "according", "boise", "canyon", "college", "home", "idaho", "meaning", "meridian", "miles", "nampa", "population", "principal", "university", "west", "western".
accordingboisecanyoncollegehomeidahomeaningmeridianmilesnampapopulationprincipaluniversitywestwestern
state 84, and 6 miles (9.7 km) west of Meridian. It is the second principal city of the Boise metropolitan area. The name "Nampa" may have come from a Shoshoni word meaning 'moccasin' or 'footprint'. According to toponymist William O. Bright, the name comes from the Shoshoni word /nampai/, meaning "foot".
W. J. McClelland, c.1901–1903 Frank H. Sutherland, c.1903–1904 H. A. Partridge, c.1904–1905, 1907–1908, 1913–1914 Rudolphus W. Purdum, c.1905–1906 E. H. Dewey, c.1909–1911 T. E. Munhall, c.1915–1917 Robert A. Davis, c.1917–1919 H. H. Keim, c.1919–1920 J. Fremont Bow, 1921–1923 Eugene Emerson, c.1923–1925 George Meffan, 1925–1929 Eustace Smallwood, c.1929–1930 E. W. Rising, c.1933–1935 George I. Van Name, 1935–1937 R. Lewis Ord, 1937–1939 Ben H. Waigand, 1939–1943 A. E. Lindsey, c.1943–1945 Sevren G. Honstead, 1945–1947 Peter Johnson, 1947–1951 Preston Capell, c.1951–1957 Thomas Leupp, 1957–1961 Ernest Starr, 1961–1981 Winston K.
pa ( ) is the most populous city in Canyon County, Idaho, United States. The population was 100,200 at the 2020 census. It is Idaho's third-most populous city. Nampa is about 20 miles (32 km) west of Boise along Interstate 84, and 6 miles (9.7 km) west of Meridian. It is the second principal city of the Boise metropolitan area. The name "Nampa" may have come from a Shoshoni word meaning 'moccasin' or 'footprint'. According to toponymist William O. Bright, the name comes from the Shoshoni word /nampai/, meaning "foot".
Mergers and acquisitions
Q731112 QID OVERLAP 0.800
QID OVERLAP: Q731112 in procurement_public_spending (tier:branch) and energy_utilities (tier:branch). | SHARED TOKENS (40): "acquisition", "acquisitions", "act", "activity", "another", "assets", "business", "capital", "central", "competitive", "consolidation", "control", "create", "department", "described", "direct", "entities", "entity", "federal", "governed"....
acquisitionacquisitionsactactivityanotherassetsbusinesscapitalcentralcompetitiveconsolidationcontrolcreatedepartmentdescribeddirectentitiesentityfederalgovernedlawlegalmanagementmarketoperatingoperationsownershippotentialprocessesproposed+10
In business, mergers and acquisitions (M&A) are transactions where the ownership of a company, business organization, or one of their operating units is transferred to or consolidated with another entity. They may happen through direct absorption, a merger, a tender offer or a hostile takeover. As a central aspect of corporate strategy and strategic management, M&A activity enables companies to expand, diversify, restructure, or realign their competitive position. In legal terms, a merger is the consolidation of two entities into a single legal entity, whereas an acquisition occurs when one entity takes ownership of another entity's share capital, equity interests or assets. Both typically result in assets, liabilities, and operations being combined under unified control, and a transaction described as a merger may economically resemble an acquisition, and vice versa. M&A transactions are governed by corporate law and are typically subject to regulatory review, particularly under competition (antitrust) law. Many countries require notification and review of proposed mergers to allow the government to assess their potential effects on market competition. In the United States, for example, the Clayton Act prohibits any merger or acquisition that may "substantially lessen competition" or "tend to create a monopoly", and the Hart–Scott–Rodino Act requires providing advance notice to the U.S.
tivity enables companies to expand, diversify, restructure, or realign their competitive position. In legal terms, a merger is the consolidation of two entities into a single legal entity, whereas an acquisition occurs when one entity takes ownership of another entity's share capital, equity interests or assets. Both typically result in assets, liabilities, and operations being combined under unified control, and a transaction described as a merger may economically resemble an acquisition, and vice versa. M&A transactions are governed by corporate law and are typically subject to regulatory review, particularly under competition (antitrust) law. Many countries require notification and review of proposed mergers to allow the government to assess their potential effects on market competition. In the United States, for example, the Clayton Act prohibits any merger or acquisition that may "substantially lessen competition" or "tend to create a monopoly", and the Hart–Scott–Rodino Act requires providing advance notice to the U.S.
al, equity interests or assets. Both typically result in assets, liabilities, and operations being combined under unified control, and a transaction described as a merger may economically resemble an acquisition, and vice versa. M&A transactions are governed by corporate law and are typically subject to regulatory review, particularly under competition (antitrust) law. Many countries require notification and review of proposed mergers to allow the government to assess their potential effects on market competition. In the United States, for example, the Clayton Act prohibits any merger or acquisition that may "substantially lessen competition" or "tend to create a monopoly", and the Hart–Scott–Rodino Act requires providing advance notice to the U.S.
Sanitary sewer
Q1805497 QID OVERLAP 0.800
QID OVERLAP: Q1805497 in procurement_public_spending (tier:branch) and energy_utilities (tier:branch). | SHARED TOKENS (17): "advantage", "buildings", "commercial", "directly", "industrial", "infrastructure", "pipe", "separate", "serving", "sewer", "smaller", "system", "systems", "treatment", "type", "urban", "wastewater".
advantagebuildingscommercialdirectlyindustrialinfrastructurepipeseparateservingsewersmallersystemsystemstreatmenttypeurbanwastewater
itary sewers serving industrial areas may also carry industrial wastewater. In municipalities served by sanitary sewers, separate storm drains may convey surface runoff directly to surface waters. An advantage of sanitary sewer systems is that they avoid combined sewer overflows. Sanitary sewers are typically much smaller in diameter than combined sewers which also transport urban runoff. Backups of raw sewage can occur if excessive stormwater inflow or groundwater infiltration occurs due to leaking joints, defective pipes etc.
Purpose Sewage treatment is less effective when sanitary waste is diluted with stormwater, and combined sewer overflows occur when runoff from heavy rainfall or snowmelt exceeds the hydraulic capacity of sewage treatment plants. To overcome these disadvantages, some cities built separate sanitary sewers to collect only municipal wastewater and exclude stormwater runoff, which is collected in separate storm drains. The decision to build a combined sewer system or two separate systems is mainly based on the need for sewage treatment and the cost of providing treatment during heavy rain events.
Piping materials PVC is the dominant material for sanitary plumbing. Its wide use is owed to its chemical resistance and durability. It is however subject to cracking. The chief alternative to PVC is high-density polyethylene (HDPE), which is growing in use. One advantage to HDPE is that the welds are stronger than those used in PVC. Clay pipes are also viable owing to their chemical resilience. Maintenance Sanitary sewer overflow can occur due to blocked or broken sewer lines, infiltration of excessive stormwater or malfunction of pumps. In these cases untreated sewage is discharged from a sanitary sewer into the environment prior to reaching sewage treatment facilities. To avoid such overflows, maintenance is required. Blockage prevention campaigns or regulations (e.g., requiring the use of grease interceptors by some customers) may also be necessary. The maintenance requirements vary with the type of sanitary sewer. In general, all sewers deteriorate with age, but infiltration and inflow are problems unique to sanitary sewers, since both combined sewers and storm drains are sized to carry these contributions. Holding infiltration to acceptable levels requires a higher standard of maintenance than necessary for structural integrity considerations of combined sewers. A comprehensive construction inspection program is required to prevent inappropriate connection of cellar, yard, and roof drains to sanitary sewers. The probability of inappropriate connections is higher where combined sewers and sanitary sewers are found in close proximity, because construction personnel may not recognize the difference. Many older cities still use combined sewers while adjacent suburbs were built with separate sanitary sewers. For decades, when sanitary sewer pipes cracked or experienced other damage, the only option was an expensive excavation, removal and replacement of the damaged pipe, typically requiring street repavement afterwards. In the mid-1950s, a unit was invented where two units at each end with a special cement mixture in between was pulled from one manhole cover to the next, coating the pipe with the cement under high pressure, which then cured rapidly, sealing all cracks and breaks in the pipe. Today, a similar method using epoxy resin is used by some municipalities to re-line aging or damaged pipes, effectively creating a "pipe in a pipe".
P
Q476115 QID OVERLAP 0.800
QID OVERLAP: Q476115 in procurement_public_spending (tier:branch) and energy_utilities (tier:branch). | SHARED TOKENS (23): "active", "business", "capital", "category", "changes", "control", "described", "development", "finance", "financial", "firms", "funds", "limited", "management", "operational", "ownership", "private", "provide", "public", "rather"....
activebusinesscapitalcategorychangescontroldescribeddevelopmentfinancefinancialfirmsfundslimitedmanagementoperationalownershipprivateprovidepublicratherrolespecializedworking
Private equity (PE) is stock in a private company that does not offer stock to the general public. Instead, it is offered to specialized investment funds and limited partnerships that take an active role in managing and structuring the companies. In colloquial usage, "private equity" can refer to these investment firms rather than the companies in which they invest. Private-equity capital is invested into a target company either by an investment management company (private equity firm), a venture capital fund, or an angel investor; each category of investor has specific financial goals, management preferences, and investment strategies for profiting from their investments. Private equity can provide working capital to finance a target company's expansion, including the development of new products and services, operational restructuring, management changes, and shifts in ownership and control. As a financial product, a private-equity fund is private capital for financing a long-term investment strategy in an illiquid business enterprise.
Leveraged buyout (LBO) refers to a strategy of making equity investments as part of a transaction in which a company, business unit, or business asset is acquired from the current shareholders typically with the use of financial leverage. The companies involved in these transactions are typically mature and generate operating cash flows. Private-equity firms view target companies as either Platform companies, which have sufficient scale and a successful business model to act as a stand-alone entity, or as add-on / tuck-in / bolt-on acquisitions, which would include companies with insufficient scale or other deficits. Leveraged buyouts involve a financial sponsor agreeing to an acquisition without itself committing all the capital required for the acquisition. To do this, the financial sponsor will raise acquisition debt, which looks to the cash flows of the acquisition target to make interest and principal payments. Acquisition debt in an LBO is often non-recourse to the financial sponsor and has no claim on other investments managed by the financial sponsor. Therefore, an LBO transaction's financial structure is particularly attractive to a fund's limited partners, allowing them the benefits of leverage, but limiting the degree of recourse of that leverage. This kind of financing structure leverage benefits an LBO's financial sponsor in two ways: (1) the investor only needs to provide a fraction of the capital for the acquisition, and (2) the returns to the investor will be enhanced, as long as the return on assets exceeds the cost of the debt. As a percentage of the purchase price for a leverage buyout target, the amount of debt used to finance a transaction varies according to the financial condition and history of the acquisition target, market conditions, the willingness of lenders to extend credit (both to the LBO's financial sponsors and the company to be acquired) and the interest costs and the ability of the company to cover those costs. Historically the debt portion of a LBO will range from 60 to 90% of the purchase price.
"Distressed-to-Control" ("Loan-to-Own") investment whereby the investor buys debt securities in hope of acquiring ownership and control of the company's equity after financing the corporate restructuring of the target company; "Special Situations" ("Turnaround") investment wherein the investor buys debt securities and equity investments, to be used as rescue financing that will restore the profitability of the financially-weak target company. Moreover, the private-equity investment strategies of hedge funds also include actively trading the loans held and the bonds issued by the financially-weak target companies. Secondaries Secondary investments refer to investments made in existing private-equity assets. These transactions can involve the sale of private equity fund interests or portfolios of direct investments in privately held companies through the purchase of these investments from existing institutional investors. By its nature, the private-equity asset class is illiquid, intended to be a long-term investment for buy and hold investors. Secondary investments allow institutional investors, particularly those new to the asset class, to invest in private equity from older vintages than would otherwise be available to them. Secondaries also typically experience a different cash flow profile, diminishing the j-curve effect of investing in new private-equity funds. Often investments in secondaries are made through third-party fund vehicle, structured similar to a fund of funds although many large institutional investors have purchased private-equity fund interests through secondary transactions.
Civil engineering
Q77590 QID OVERLAP 0.800
QID OVERLAP: Q77590 in procurement_public_spending (tier:branch) and energy_utilities (tier:branch). | SHARED TOKENS (23): "agencies", "buildings", "civil", "construction", "departments", "design", "distinguish", "engineering", "environment", "firms", "infrastructure", "locally", "maintenance", "municipal", "national", "physical", "private", "professional", "public", "roads"....
agenciesbuildingscivilconstructiondepartmentsdesigndistinguishengineeringenvironmentfirmsinfrastructurelocallymaintenancemunicipalnationalphysicalprivateprofessionalpublicroadsstructuralsystemsworks
defined to distinguish non-military engineering from military engineering. Civil engineering can take place in the public sector from municipal public works departments through to national government agencies, and in the private sector from locally based firms to Fortune Global 500 companies. History As a discipline Civil engineering is the application of physical and scientific principles for solving the problems of society, and its history is intricately linked to advances in the understanding of physics and mathematics throughout history. Because civil engineering is a broad profession, including several specialized sub-disciplines, its history is linked to knowledge of structures, materials science, geography, geology, soils, hydrology, environmental science, mechanics, project management, and other fields. Throughout ancient and medieval history most architectural design and construction was carried out by artisans, such as stonemasons and carpenters, rising to the role of master builder. Knowledge was retained in craft guilds and seldom supplanted by advances. Structures, roads, and infrastructure that existed were repetitive, and increases in scale were incremental. One of the earliest examples of a scientific approach to physical and mathematical problems applicable to civil engineering is the work of Archimedes in the 3rd century BC, including Archimedes' principle, which underpins our understanding of buoyancy, and practical solutions such as Archimedes' screw.
nstruction, and maintenance of the physical and naturally built environment, including public works such as roads, bridges, canals, dams, airports, sewage systems, pipelines, structural components of buildings, and railways. Civil engineering is traditionally broken into a number of sub-disciplines. It is considered the second-oldest engineering discipline after military engineering, and it is defined to distinguish non-military engineering from military engineering.
Site development, also known as site planning, is focused on the planning and development potential of a site as well as addressing possible impacts from permitting issues and environmental challenges. Structural engineering Structural engineering is concerned with the structural design and structural analysis of buildings, bridges, towers, flyovers (overpasses), tunnels, off shore structures like oil and gas fields in the sea, aerostructure and other structures. This involves identifying the loads which act upon a structure and the forces and stresses which arise within that structure due to those loads, and then designing the structure to successfully support and resist those loads. The loads can be self weight of the structures, other dead load, live loads, moving (wheel) load, wind load, earthquake load, load from temperature change etc. The structural engineer must design structures to be safe for their users and to successfully fulfill the function they are designed for (to be serviceable). Due to the nature of some loading conditions, sub-disciplines within structural engineering have emerged, including wind engineering and earthquake engineering. Design considerations will include strength, stiffness, and stability of the structure when subjected to loads which may be static, such as furniture or self-weight, or dynamic, such as wind, seismic, crowd or vehicle loads, or transitory, such as temporary construction loads or impact.
Water supply
Q1061108 QID OVERLAP 0.800
QID OVERLAP: Q1061108 in procurement_public_spending (tier:branch) and energy_utilities (tier:branch). | SHARED TOKENS (25): "agriculture", "amount", "around", "capital", "commercial", "cost", "costs", "different", "drinking", "institutional", "large", "personnel", "policy", "public", "quality", "responsibility", "rural", "separate", "small", "supply"....
agricultureamountaroundcapitalcommercialcostcostsdifferentdrinkinginstitutionallargepersonnelpolicypublicqualityresponsibilityruralseparatesmallsupplysystemsystemsurbanutilitieswater
harge tariffs to recover part of their costs. Water supply is a separate topic from irrigation, the practice and systems of water supply on a larger scale, for a wider variety of purposes, primarily agriculture. Technical overview Water supply systems get water from a variety of locations after appropriate treatment, including groundwater (aquifers), surface water (lakes and rivers), and the sea through desalination. The water treatment steps include, in most cases, purification, disinfection through chlorination and sometimes fluoridation. Treated water then either flows by gravity or is pumped to reservoirs, which can be elevated such as water towers or on the ground (for indicators related to the efficiency of drinking water distribution see non-revenue water).
n and standardization. The cost of supplying water consists, to a very large extent, of fixed costs (capital costs and personnel costs) and only to a small extent of variable costs that depend on the amount of water consumed (mainly energy and chemicals).
Financial aspects Costs and financing The cost of supplying water consists, to a very large extent, of fixed costs (capital costs and personnel costs) and only to a small extent of variable costs that depend on the amount of water consumed (mainly energy and chemicals). The full cost of supplying water in urban areas in developed countries is about US$1–2 per cubic meter depending on local costs and local water consumption levels. The cost of sanitation (sewerage and wastewater treatment) is another US$1–2 per cubic meter. These costs are somewhat lower in developing countries. Throughout the world, only part of these costs is usually billed to consumers, the remainder being financed through direct or indirect subsidies from local, regional or national governments (see section on tariffs). Besides subsidies water supply investments are financed through internally generated revenues as well as through debt.
Boise, Idaho
Q35775 QID OVERLAP 0.780
QID OVERLAP: Q35775 in procurement_public_spending (tier:branch) and energy_utilities (tier:branch). | SHARED TOKENS (14): "ada", "annual", "boise", "capital", "counties", "home", "idaho", "locally", "major", "miles", "population", "technology", "treasure", "valley".
adaannualboisecapitalcountieshomeidaholocallymajormilespopulationtechnologytreasurevalley
Boise (locally also ) is the capital and most populous city in the U.S. state of Idaho. It is the county seat of Ada County. The population of the city was 235,685 at the 2020 census. The Boise metropolitan area, located in the Treasure Valley, includes five counties of Idaho with an estimated population of 846,000, the most populous metropolitan area in Idaho and 95th-most populous in the United States. Located on the Boise River in southwestern Idaho, it is 41 miles (66 km) east of the Oregon border and 110 miles (177 km) north of the Nevada border. Downtown Boise's elevation is 2,704 feet (824 m) above sea level. Boise is home to major employers in the technology, manufacturing, and service sectors, including companies such as Micron Technology and Hewlett-Packard.
an area in Idaho and 95th-most populous in the United States. Located on the Boise River in southwestern Idaho, it is 41 miles (66 km) east of the Oregon border and 110 miles (177 km) north of the Nevada border. Downtown Boise's elevation is 2,704 feet (824 m) above sea level. Boise is home to major employers in the technology, manufacturing, and service sectors, including companies such as Micron Technology and Hewlett-Packard.
...that the military should continue killing Indians 'until the last Indian in the Territories was either on his reservation or enriched the sagebrush with his decaying carcass.' ...if the Indians refused to move there, 'they will be killed or put on the reservation by force, and certainly shot if they don't stay there.' Furthermore, the editor continues, 'The idea that the Indians have any right to the soil is ridiculous. ...They have no more rights to the soil of the Territories of the United States than wolves or coyotes...' This would be our plan of establishing friendship upon an eternal basis with our Indians: Let all the hostile bands of Idaho Territory be called in (they will not be caught in any other manner) to attend a grand treaty; plenty of blankets and nice little trinkets distributed among them; plenty of grub on hand; have a real jolly time with them; then just before the big feast put strychnine in their meat and poison to death the last mother's son of them. At the same time, native warriors around the valley, under the leadership of Howluck also known as "Bigfoot" among white settlers, among others, waged an escalating and intensified guerrilla campaign of harassment of passerby caravans along the Oregon Trail. The United States Army also escalated and intensified "punitive expeditions" against formations of warriors and against civilian communities as well. This marked the start of the "unofficial" Snake War in 1866. This war lasted until 1868, and is statistically the deadliest of the Indian Wars in the West in terms of casualties. In the end, 1,762 men were counted as the casualties of this war from both sides. In 1868, Fort Hall Indian Reservation was established in Southeastern Idaho, about 220 miles upstream, according to the terms of Fort Bridger Treaty. The Boise Valley Shoshone and Bannock Tribes were not party to this treaty. Nevertheless, in April 1869, the United States Military embarked on a campaign of "Removal, rounding up of natives in the region including in and around Boise, and expelling them with cavalry escort to Fort Hall Indian Reservation. This period is known among the Shoshone and Bannock people as Idaho's Trail of Tears. Some of the natives managed to escape, and they ran to either Duck Valley or Fort McDermitt in Nevada. Incorporation and growth Boise's early growth was significantly driven by its role in supplying the nearby gold towns that sprung up in the 1860s northeast and then southwest of the town. Miners sometimes wintered in Boise and a number of early prominent businessmen were miners who settled in town in the years after the gold rush waned. By 1864 substantial agricultural production was underway on easily irrigated lands near the river and three canal companies had been incorporated. Early transportation improvements were largely a result of toll road franchises awarded by the territorial legislature starting in the 1860s. These first ran from Fort Boise to the mining centers in the Boise Basin and east to Rocky Bar and to Rattlesnake Station where they connected to the Oregon Trail. Territorial census records from a special 1864 enumeration list the population of Boise as 1,658, and an act of December 12, 1864, was the first attempt by the Idaho Territorial Legislature to incorporate the city. This was rejected by voters the following March. Two more unsuccessful attempts were made to organize a city administration by election before the 1866 version of the city charter was approved by voters on January 6, 1868. The growing number of homes and businesses, for which owners wanted proper legal title, may have contributed to the eventual success of incorporation. All of these rejected efforts to incorporate the city came after Boise had been controversially made the state capital in 1864 over strong opposition from northern Idaho interests. This decision reflected the rapid shift of population growth from north to south after the discovery of gold in southern Idaho. By 1868 Boise had over 400 permanent buildings with a wide range of commercial services. 1868 also marked the formal beginning of a long advocacy for railroad connections to other Idaho communities and, just as importantly, to other growing cities in the west such as Portland, Oregon. Competing railroad and western state government interests frustrated these efforts for many years. Designed by Alfred B. Mullett, the U.S. Assay Office at 210 Main Street was built in 1871 and today is a National Historic Landmark. It first began accepting gold and silver for purchase on March 2, 1872, largely eliminating the need to transport ore to the mint in San Francisco. A territorial penitentiary, now known as the Old Idaho State Penitentiary, opened the same month several miles east of town. Mining continued to be important to Boise's economic growth and periodic booms contributed to population growth as well, though production of gold and silver probably peaked in the 1860s. 1882's gold and silver production of $3,500,000 declined to $1,488,315 (including lead) by 1899. Boise began to earn its City of Trees nickname in this period with a popular focus on a range of tree planting projects. Thomas J. Davis planted several thousand fruit trees in 1864 and several other early businessmen either founded nurseries or orchards of their own. In the 1870s tree planting began in earnest in downtown Boise led by prominent hotels as well as businessmen and residents. In 1907 Davis donated 43 acres of his orchard property to the city for use as a park in the name of his wife Julia. Commercial agriculture continued to expand, but was slowed by the lack of reliable rail links to regional and national markets and by a lack of large scale irrigation projects, which themselves were often tied to hoped-for railroad projects for financing. A.D. Foote, a successful mining engineer, drew up plans to irrigate up to 500,000 acres immediately south of Boise in 1882, but progress was halting and smaller farms were the norm until after the turn of the century with most located near to the river bottom where soil was productive and irrigation more easily achieved. Fruit orchards proliferated and sugar beets, still an important agricultural industry in Idaho, began to be widely cultivated in the 1890s. Cattle and sheep farming became increasingly important as the century closed. With the exception of dairy, most livestock products were exported from Idaho, unlike other agricultural products which were still largely scaled to support local markets. The timber industry also increasingly thrived in the Boise market in the 1880s and 1890s. Large quantities of timber were exported from elsewhere in Idaho, but a growing Boise supported the expansion of Alexander Rossi's sawmill, first established in 1865. Prominent early Boisean William Ridenbaugh had inherited control of the canal now bearing his name from his uncle William Morris in 1878 and later partnered with Rossi to expand the sawmill capacity under the name Rossi and Ridenbaugh Lumber Company. Their materials supported bridge building and the rapid expansion of Boise in the 1890s. As with many early infrastructure ventures, electrification succeeded only after at least one false start. July 4, 1887, marked the start of electrical transmission from a plant located on the Bench. William Ridenbaugh provided expertise and manpower for the water supply and several months were spent rigging poles and lines from the Bench to the service area across the river. Additional electrical supplies allowed the building of an electric streetcar line in 1891. This ran without interruption until buses replaced the lines in 1927, tracking—and sometimes driving—the development of Boise and nearby communities. This system expanded over several decades, reaching into the North End, South Boise and across the river on Front St. A loop line, completed in 1912, ran as far as Caldwell and Nampa, providing transport throughout the valley. Three early trolley companies merged in 1912 to form the Idaho Traction Company with a depot at 7th and Bannock Streets downtown. Additional services and urban amenities arrived in the 1890s as Boise grew. Exploratory drilling for hot water was successful in 1890 and by the end of the decade many homes along Warm Springs avenue were being heated by this source. A natatorium was built in 1892 close to the source of the hot water near the Idaho State Penitentiary. Churches serving several denominations, a Jewish synagogue, a major hardware store and department store, a Masonic hall, the Columbia Theater, Saint Alphonsus' Hospital, a number of parochial and secular schools, a City Hall and a new Union Pacific passenger station, constructed when service was finally extended to downtown, were all built during the 1890s. Falk's Department Store sponsored a semi-professional baseball team representing Boise from at least 1892 and the city supported other organized sports as they became popular.
Ada County, Idaho
Q109820 QID OVERLAP 0.740
QID OVERLAP: Q109820 in procurement_public_spending (tier:evergreen) and energy_utilities (tier:branch). | SHARED TOKENS (12): "ada", "boise", "capital", "district", "home", "idaho", "jurisdiction", "largest", "local", "population", "private", "roads".
adaboisecapitaldistricthomeidahojurisdictionlargestlocalpopulationprivateroads
Ada County is located in the southwestern part of Idaho, United States. As of the 2020 census, the county had a population of 494,967, which by 2025 was estimated to have risen to 546,141. Ada County is by far the state's most populous county; it is home to 26.8% of the state's population. The county seat and largest city is Boise, which is also the state capital. Ada County is included in the Boise metropolitan area. The Ada County Highway District has jurisdiction over all the local county and city streets, except for private roads and state roads.
populous county; it is home to 26.8% of the state's population. The county seat and largest city is Boise, which is also the state capital. Ada County is included in the Boise metropolitan area. The Ada County Highway District has jurisdiction over all the local county and city streets, except for private roads and state roads.
ea. The Ada County Highway District has jurisdiction over all the local county and city streets, except for private roads and state roads. In the interior Pacific Northwest east of the Cascade Range, Ada County ranks second in population, behind Spokane County, Washington. History Ada County was created by the Idaho Territory legislature on December 22, 1864, partitioned from Boise County. It is named for Ada Riggs, the daughter of H. C. Riggs, a member of the legislature; he established the county and was a co-founder of Boise.
Caldwell, Idaho
Q849592 QID OVERLAP 0.700
QID OVERLAP: Q849592 in procurement_public_spending (tier:branch) and energy_utilities (tier:branch). | SHARED TOKENS (10): "approximately", "boise", "caldwell", "canyon", "college", "idaho", "locally", "miles", "population", "west".
approximatelyboisecaldwellcanyoncollegeidaholocallymilespopulationwest
city in Idaho. As of the 2020 census, Caldwell had a population of 59,996. Caldwell is considered part of the Boise metropolitan area, and is the location of the College of Idaho. The city is located approximately 24 miles (39 km) west of Boise, and approximately 17 miles (27 km) east of the Oregon border. History The present-day location of Caldwell is along a natural passageway to the Inland and Pacific Northwest. Native American tribes from the west coast, north Idaho and as far away as Colorado came to the banks of the Boise River for annual trading fairs, or rendezvous. European and some Hawaiian explorers and traders soon followed the paths left by Native Americans and hopeful emigrants later forged the Oregon Trail and followed those paths to seek a better life in the Oregon Territory. Pioneers of the Trail traveled along the Boise River to Canyon Hill and forded the river close to the Silver Bridge on Plymouth Street. During the Civil War, the discovery of gold in Idaho's mountains brought a variety of new settlers into the area. Many never made it to the mines but settled along the Boise River and run ferries, stage stations, and freighting businesses. These early entrepreneurs created small ranches and farms in the river valleys. Caldwell's inception occurred largely as a result of the construction of the Oregon Short Line Railroad, which connected Wyoming to Oregon through Idaho. Robert E. Strahorn came to the Boise River Valley in 1883 to select a route for the railroad. He rejected the grade into Boise City as too steep and chose a site 30 miles to the west. He drove a stake into an alkali flat of sagebrush and greasewood and the City of Caldwell was platted. Caldwell was named after one of Strahorn's business partners, Alexander Caldwell, a former senator from Kansas. When Caldwell was platted in August 1883, its founder, the Idaho and Oregon Land Improvement Company, started persuading settlers and businessmen to move to the area. Within four months, Caldwell had 600 residents living in 150 dwellings, 40 businesses, a school, a telephone exchange, and two newspapers. On January 15, 1890, the Board of Commissioners of Ada County issued a handwritten order incorporating the City of Caldwell. The College of Idaho was founded in Caldwell in 1891. In 1892, Canyon County was established from a portion of Ada County, and Caldwell was named the county seat. Irrigation canals and waterways were constructed throughout Canyon County, providing the foundation for an agricultural economy. The Oregon Short Line Railroad became part of the larger Union Pacific Railroad network and in 1906 the Caldwell freight and passenger depot was constructed. Caldwell experienced moderate growth as an agricultural processing, commercial retail and educational center during the 20th century. In 2009, the City of Caldwell completed a revitalization project to restore Indian Creek, which runs through downtown Caldwell, but had been used for sewage disposal by local industries and been covered over.
History The present-day location of Caldwell is along a natural passageway to the Inland and Pacific Northwest. Native American tribes from the west coast, north Idaho and as far away as Colorado came to the banks of the Boise River for annual trading fairs, or rendezvous. European and some Hawaiian explorers and traders soon followed the paths left by Native Americans and hopeful emigrants later forged the Oregon Trail and followed those paths to seek a better life in the Oregon Territory. Pioneers of the Trail traveled along the Boise River to Canyon Hill and forded the river close to the Silver Bridge on Plymouth Street. During the Civil War, the discovery of gold in Idaho's mountains brought a variety of new settlers into the area. Many never made it to the mines but settled along the Boise River and run ferries, stage stations, and freighting businesses. These early entrepreneurs created small ranches and farms in the river valleys. Caldwell's inception occurred largely as a result of the construction of the Oregon Short Line Railroad, which connected Wyoming to Oregon through Idaho. Robert E. Strahorn came to the Boise River Valley in 1883 to select a route for the railroad. He rejected the grade into Boise City as too steep and chose a site 30 miles to the west. He drove a stake into an alkali flat of sagebrush and greasewood and the City of Caldwell was platted. Caldwell was named after one of Strahorn's business partners, Alexander Caldwell, a former senator from Kansas. When Caldwell was platted in August 1883, its founder, the Idaho and Oregon Land Improvement Company, started persuading settlers and businessmen to move to the area. Within four months, Caldwell had 600 residents living in 150 dwellings, 40 businesses, a school, a telephone exchange, and two newspapers. On January 15, 1890, the Board of Commissioners of Ada County issued a handwritten order incorporating the City of Caldwell. The College of Idaho was founded in Caldwell in 1891. In 1892, Canyon County was established from a portion of Ada County, and Caldwell was named the county seat. Irrigation canals and waterways were constructed throughout Canyon County, providing the foundation for an agricultural economy. The Oregon Short Line Railroad became part of the larger Union Pacific Railroad network and in 1906 the Caldwell freight and passenger depot was constructed. Caldwell experienced moderate growth as an agricultural processing, commercial retail and educational center during the 20th century. In 2009, the City of Caldwell completed a revitalization project to restore Indian Creek, which runs through downtown Caldwell, but had been used for sewage disposal by local industries and been covered over.
location of the College of Idaho. The city is located approximately 24 miles (39 km) west of Boise, and approximately 17 miles (27 km) east of the Oregon border. History The present-day location of Caldwell is along a natural passageway to the Inland and Pacific Northwest. Native American tribes from the west coast, north Idaho and as far away as Colorado came to the banks of the Boise River for annual trading fairs, or rendezvous. European and some Hawaiian explorers and traders soon followed the paths left by Native Americans and hopeful emigrants later forged the Oregon Trail and followed those paths to seek a better life in the Oregon Territory. Pioneers of the Trail traveled along the Boise River to Canyon Hill and forded the river close to the Silver Bridge on Plymouth Street. During the Civil War, the discovery of gold in Idaho's mountains brought a variety of new settlers into the area. Many never made it to the mines but settled along the Boise River and run ferries, stage stations, and freighting businesses. These early entrepreneurs created small ranches and farms in the river valleys. Caldwell's inception occurred largely as a result of the construction of the Oregon Short Line Railroad, which connected Wyoming to Oregon through Idaho. Robert E. Strahorn came to the Boise River Valley in 1883 to select a route for the railroad. He rejected the grade into Boise City as too steep and chose a site 30 miles to the west. He drove a stake into an alkali flat of sagebrush and greasewood and the City of Caldwell was platted. Caldwell was named after one of Strahorn's business partners, Alexander Caldwell, a former senator from Kansas. When Caldwell was platted in August 1883, its founder, the Idaho and Oregon Land Improvement Company, started persuading settlers and businessmen to move to the area. Within four months, Caldwell had 600 residents living in 150 dwellings, 40 businesses, a school, a telephone exchange, and two newspapers. On January 15, 1890, the Board of Commissioners of Ada County issued a handwritten order incorporating the City of Caldwell. The College of Idaho was founded in Caldwell in 1891. In 1892, Canyon County was established from a portion of Ada County, and Caldwell was named the county seat. Irrigation canals and waterways were constructed throughout Canyon County, providing the foundation for an agricultural economy. The Oregon Short Line Railroad became part of the larger Union Pacific Railroad network and in 1906 the Caldwell freight and passenger depot was constructed. Caldwell experienced moderate growth as an agricultural processing, commercial retail and educational center during the 20th century. In 2009, the City of Caldwell completed a revitalization project to restore Indian Creek, which runs through downtown Caldwell, but had been used for sewage disposal by local industries and been covered over.
Municipal solid waste
Q18538 QID OVERLAP 0.680
QID OVERLAP: Q18538 in procurement_public_spending (tier:branch) and energy_utilities (tier:evergreen). | SHARED TOKENS (9): "code", "food", "municipal", "public", "role", "separately", "solid", "type", "waste".
codefoodmunicipalpublicroleseparatelysolidtypewaste
can also refer specifically to food waste, as in a garbage disposal; the two are sometimes collected separately. In the European Union, the semantic definition is 'mixed municipal waste,' given waste code 20 03 01 in the European Waste Catalog.
Composition The composition of municipal solid waste varies greatly from municipality to municipality, and it changes significantly with time. In municipalities which have a well-developed waste recycling system, the waste stream mainly consists of intractable wastes such as plastic film and non-recyclable packaging materials. At the start of the 20th century, the majority of domestic waste (53%) in the UK consisted of coal ash from open fires. In developed areas without significant recycling activity it predominantly includes food wastes, market wastes, yard wastes, plastic containers, and product packaging materials, and other miscellaneous solid wastes from residential, commercial, institutional, and industrial sources. Most definitions of municipal solid waste do not include industrial wastes, agricultural wastes, medical waste, radioactive waste or sewage sludge. Waste collection is performed by the municipality within a given area. The term "residual waste" relates to waste left from household sources containing materials that have not been separated out or sent for processing.
Biodegradable waste: food and kitchen waste, green waste, paper (most can be recycled, although some difficult to compost plant material may be excluded) Recyclable materials: paper, cardboard, glass, bottles, jars, tin cans, aluminum cans, aluminium foil, metals, certain plastics, textiles, clothing, tires, batteries, etc. Inert waste: construction and demolition waste, dirt, rocks, debris Electrical and electronic waste (WEEE) – ⁣electrical appliances, light bulbs, washing machines, TVs, computers, screens, mobile phones, alarm clocks, watches, etc. Composite wastes: waste clothing, Tetra Pack food and drink cartons, waste plastics such as toys and plastic garden furniture Hazardous waste including most paints, chemicals, tires, batteries, light bulbs, electrical appliances, fluorescent lamps, aerosol spray cans, and fertilizers Toxic waste including pesticides, herbicides, and fungicides Biomedical waste, expired pharmaceutical drugs, etc. For example, typical municipal solid waste in China is composed of 55.9% food residue, 8.5% paper, 11.2% plastics, 3.2% textiles, 2.9% wood waste, 0.8% rubber, and 18.4% non-combustibles.
Kuna, Idaho
Q1515177 QID OVERLAP 0.660
QID OVERLAP: Q1515177 in procurement_public_spending (tier:branch) and energy_utilities (tier:branch). | SHARED TOKENS (8): "ada", "additional", "boise", "idaho", "kuna", "nearly", "percent", "population".
adaadditionalboiseidahokunanearlypercentpopulation
Kuna ( KYOO-nə) is a city in Ada County, Idaho. It is part of the Boise metropolitan area. The population was 24,011 at the time of the 2020 census. Kuna is one of the fastest-growing areas in Idaho, having nearly tripled in population between 2000 and 2010 and a nearly additional 60 percent gain between 2010 and 2020.
History Kuna originated as a railroad stop with coach transport to Boise. It is popularly believed, as cited by the Kuna Chamber of Commerce, that the translation of the name "Kuna" means "the end of the trail", but Charles S. Walgamott cites the origin of the name as a Shoshone Indian word meaning "green leaf, good to smoke." The Western Heritage Historic Byway, designated as a national as well as a state scenic byway, travels around a number of historic sites in the area. Geography Kuna's business center is approximately 18 miles (29 km) southwest of downtown Boise, the state capital. According to the United States Census Bureau, the city has a total area of 18.18 square miles (47.09 km2), of which 18.08 square miles (46.83 km2) is land and 0.10 square miles (0.26 km2) is water. South of Kuna is the Kuna Caves, a lava tube. A small seasonal creek, Indian Creek, runs through the city. It is now used as an irrigation canal, filled by the New York Canal from the Boise River Diversion Dam.
Geography Kuna's business center is approximately 18 miles (29 km) southwest of downtown Boise, the state capital. According to the United States Census Bureau, the city has a total area of 18.18 square miles (47.09 km2), of which 18.08 square miles (46.83 km2) is land and 0.10 square miles (0.26 km2) is water. South of Kuna is the Kuna Caves, a lava tube. A small seasonal creek, Indian Creek, runs through the city. It is now used as an irrigation canal, filled by the New York Canal from the Boise River Diversion Dam. One of the few small floatable waterways in the region, Indian Creek is a favorite swimming spot for local residents. Demographics 2020 census As of the 2020 census, Kuna had a population of 24,011. The median age was 30.9 years. 31.8% of residents were under the age of 18 and 8.1% of residents were 65 years of age or older. For every 100 females there were 97.8 males, and for every 100 females age 18 and over there were 96.2 males age 18 and over. 97.1% of residents lived in urban areas, while 2.9% lived in rural areas. There were 7,736 households in Kuna, of which 48.2% had children under the age of 18 living in them. Of all households, 62.3% were married-couple households, 11.6% were households with a male householder and no spouse or partner present, and 17.4% were households with a female householder and no spouse or partner present. About 13.9% of all households were made up of individuals and 4.6% had someone living alone who was 65 years of age or older. There were 7,948 housing units, of which 2.7% were vacant. The homeowner vacancy rate was 0.8% and the rental vacancy rate was 5.9%. As of the 2020 census, the median income for a household in the city was $68,017. Families had a median income of $75,296 versus $91,364 for married-couple families and $33,512 for nonfamily households.
Canyon County, Idaho
Q486078 QID OVERLAP 0.660
QID OVERLAP: Q486078 in procurement_public_spending (tier:evergreen) and energy_utilities (tier:branch). | SHARED TOKENS (8): "boise", "caldwell", "canyon", "idaho", "largest", "making", "nampa", "population".
boisecaldwellcanyonidaholargestmakingnampapopulation
105, which by 2025 was estimated to have risen to 275,123, making it the second-most populous county in Idaho. The county seat is Caldwell, and its largest city is Nampa. Canyon County is part of the Boise metropolitan area. History Hudson's Bay Company established Fort Boise in 1834 near what is now Parma, but abandoned it in 1855. Emigrants traveled through Canyon County on the Oregon Trail. Discovery of gold in the Boise Basin in 1862 brought settlement to the region again. The lower Boise River was fully contained within Boise County from 1863 until the formation of Ada County in 1864. Settlement of the lower Boise River west of Boise City was limited prior to the completion of the Oregon Short Line Railroad. Middleton was the first European settlement of Canyon County, starting in 1863. The 1870 Census for Ada County listed 76 residents of the Boise Valley, excluding Boise City and the 1880 Census listed 44 residents at Middleton. The arrival of the railroad at Caldwell led to the establishment of a town there as of August 1883. Businessmen James A. McGee and Alexander Duffes filed the plat for nearby Nampa in 1886. Parma was settled around the same time, with the Old Fort Boise post office being moved to the town's location; it was incorporated in 1904. Ada County established precincts for each of the settlements with a combined 1890 Census population of 2,311. Significant settlement of Greenleaf and Notus started around 1904 with the two settlements listed as precincts at the 1910 census. Notus was incorporated in 1921 while Greenleaf was incorporated prior to 1980. Melba was incorporated in 1912 while Wilder was incorporated in 1919. The City of Star annexed a portion of territory in northeast Canyon County prior to 2007, becoming the county's ninth incorporated city. The majority of Star is located within Ada County. The Idaho Legislature created Canyon County from Ada County in an act approved March 7, 1891, effective at the November 26, 1892, election. Caldwell was established as the county seat. The county originally contained all of Canyon and Payette counties and part of Gem; Gem County formed in 1915 and Payette County in 1917.
History Hudson's Bay Company established Fort Boise in 1834 near what is now Parma, but abandoned it in 1855. Emigrants traveled through Canyon County on the Oregon Trail. Discovery of gold in the Boise Basin in 1862 brought settlement to the region again. The lower Boise River was fully contained within Boise County from 1863 until the formation of Ada County in 1864. Settlement of the lower Boise River west of Boise City was limited prior to the completion of the Oregon Short Line Railroad. Middleton was the first European settlement of Canyon County, starting in 1863. The 1870 Census for Ada County listed 76 residents of the Boise Valley, excluding Boise City and the 1880 Census listed 44 residents at Middleton. The arrival of the railroad at Caldwell led to the establishment of a town there as of August 1883. Businessmen James A. McGee and Alexander Duffes filed the plat for nearby Nampa in 1886. Parma was settled around the same time, with the Old Fort Boise post office being moved to the town's location; it was incorporated in 1904. Ada County established precincts for each of the settlements with a combined 1890 Census population of 2,311. Significant settlement of Greenleaf and Notus started around 1904 with the two settlements listed as precincts at the 1910 census. Notus was incorporated in 1921 while Greenleaf was incorporated prior to 1980. Melba was incorporated in 1912 while Wilder was incorporated in 1919. The City of Star annexed a portion of territory in northeast Canyon County prior to 2007, becoming the county's ninth incorporated city. The majority of Star is located within Ada County. The Idaho Legislature created Canyon County from Ada County in an act approved March 7, 1891, effective at the November 26, 1892, election. Caldwell was established as the county seat. The county originally contained all of Canyon and Payette counties and part of Gem; Gem County formed in 1915 and Payette County in 1917.
2000 census As of the 2000 census, there were 131,441 people, 45,018 households and 33,943 families living in the county. The population density was 223 people per square mile (86 people/km2). There were 47,965 housing units at an average density of 81 units per square mile (31 units/km2). The racial makeup of the county was 83.10% White, 0.32% Black or African American, 0.85% Native American, 0.80% Asian, 0.13% Pacific Islander, 12.17% from other races, and 2.62% from two or more races. Hispanic or Latino of any race were 18.61% of the population. 15.9% were of German, 12.7% English, 10.3% American and 7.6% Irish ancestry. There were 45,018 households, of which 39.80% had children under the age of 18 living with them, 60.70% were married couples living together, 10.10% had a female householder with no husband present, and 24.60% were non-families. 19.80% of all households were made up of individuals, and 8.40% had someone living alone who was 65 years of age or older. The average household size was 2.85 and the average family size was 3.28. 30.90% of the population were under the age of 18, 10.70% from 18 to 24, 28.30% from 25 to 44, 19.10% from 45 to 64, and 11.00% who were 65 years of age or older. The median age was 30 years. For every 100 females, there were 98.70 males. For every 100 females age 18 and over, there were 96.30 males. The median household income was $35,884 and the median family income was $40,377. Males had a median income of $29,418 compared with $22,044 for females. The per capita income for the county was $15,155. About 8.70% of families and 12.00% of the population were below the poverty line, including 14.50% of those under age 18 and 10.70% of those age 65 or over. Communities Cities Unincorporated communities Bowmont Huston Roswell Sunnyslope Walters Ferry, Idaho Politics Like the majority of Idaho, Canyon County is reliably Republican by comfortable margins. The last time a Democratic candidate carried the county was in 1936 by Franklin D. Roosevelt.
Meridian, Idaho
Q1085274 QID OVERLAP 0.660
QID OVERLAP: Q1085274 in procurement_public_spending (tier:branch) and energy_utilities (tier:branch). | SHARED TOKENS (8): "ada", "among", "boise", "capital", "idaho", "making", "meridian", "population".
adaamongboisecapitalidahomakingmeridianpopulation
Meridian is a city located in Ada County, Idaho, United States. The population was 117,635 at the 2020 census, making it the second most populous city in the county and Idaho, after Boise, the state capital.
Rail transportation (1908–28) Following the raising of $4,000 to lay the Interurban rail line from Onweiler (Meridian and Ustick Roads), the tracks were completed into the village center. Turning east on Broadway and ending at East Second, the last car would spend the night in Meridian before returning to Boise early the next morning with passengers and freight. The interurban Station and Generator building (west one-third of the old library at Meridian and Idaho Streets) was built in 1912, and the line continued on to Nampa via Meridian. The tracks down Broadway were not used after 1912. The Interurban Company entered into receivership and closed in 1928 after 20 years of providing continuous transportation to neighboring towns. It was Meridian's main connection to the area outside the local community. The Union Pacific Railroad spur opened in 1900 and is currently operated by the Boise Valley Railroad. Many industrial customers continue to ship forest, agricultural, and chemical products along this corridor. Creamery (1929–70) The city's official website describes the history of the Ada County Dairymen's cooperative creamery as follows:The lowest days of the Great Depression brightened for area dairymen when the Ada County Dairymen's cooperative creamery began operation in 1929. It provided milk checks to those who were members of the cooperative, enabling them to pay their taxes and provide food for their families. Other community members hauled milk to the creamery and were employed by the creamery, whose product was Challenge Butter. The creamery ran seven days a week for 40 years. Additions and improvements were made while the plant was in full operation. Later years saw the Wyeth Laboratories affiliate with the creamery to manufacture SMA baby formula.
Creamery (1929–70) The city's official website describes the history of the Ada County Dairymen's cooperative creamery as follows:The lowest days of the Great Depression brightened for area dairymen when the Ada County Dairymen's cooperative creamery began operation in 1929. It provided milk checks to those who were members of the cooperative, enabling them to pay their taxes and provide food for their families. Other community members hauled milk to the creamery and were employed by the creamery, whose product was Challenge Butter. The creamery ran seven days a week for 40 years. Additions and improvements were made while the plant was in full operation. Later years saw the Wyeth Laboratories affiliate with the creamery to manufacture SMA baby formula.
Eagle, Idaho
Q1516870 QID OVERLAP 0.620
QID OVERLAP: Q1516870 in procurement_public_spending (tier:branch) and energy_utilities (tier:branch). | SHARED TOKENS (6): "ada", "boise", "eagle", "idaho", "miles", "population".
adaboiseeagleidahomilespopulation
Eagle is a city in Ada County, Idaho, ten miles (16 km) northwest of downtown Boise. The population was 30,346 at the 2020 census. History 19th century Eagle Island in Idaho was settled in 1863 by Truman Coe Catlin, who later shifted from crop farming to dairy farming, starting the island's dairy tradition. He also pioneered irrigation in the area by constructing a wide irrigation ditch. The most notable early community developer was Thomas Hugh Aiken, a Canadian surveyor, who helped establish the Eagle community in the 1870s.
Parks and recreation The city features numerous parks, including Arboretum Park, Friendship Park, Heritage Park, Orval Krasen Park, Reid W. Merrill Sr. Community Park, and Stephen C. Guerber Park, among others. The Parks and Recreation department offers youth sports leagues, camps, special events (such as Eagle Fun Days), and maintains extensive trails. Nearby Eagle Island State Park provides a swimming beach, trails, disc golf, and winter sports. Education Most of Eagle is in the West Ada School District, with a small portion in the Boise School District.
20th century The Eagle Fish Hatchery, established in the late 1940s in Idaho, was originally part of a trout program until the 1980s. In 1991, it was restructured to support the conservation of Snake River sockeye salmon, an endangered species listed that year. The hatchery's mission shifted to preserving the species and its genetic diversity through the development of eight broodstocks derived from smolts, anadromous adults, and residual populations.
◈ Cross-Vertical Edge Ledger
All Additional Edges — Deterministic Matching
233 EDGES
◈ ADDITIONAL CROSS EDGES · NON-OVERLAP233 edges
🌲 EVERGREEN1 edges
0.630
adaapproximatelyboisecanyoncapacitychannelidahomilesmultiplesystemtreasurevalleywaterwestern
SHARED TOKENS (14): "ada", "approximately", "boise", "canyon", "capacity", "channel", "idaho", "miles", "multiple", "system", "treasure", "valley", "water", "western". | URL->B (1): https://www.usbr.gov/projects/index.php?id=338. | EXACT TITLE in energy_utilities: "New York Canal".
🌿 BRANCH192 edges
0.550
idahooperatedpowerprivatelyprovidepublicregulatesutilitiesutilitywater
SHARED TOKENS (10): "idaho", "operated", "power", "privately", "provide", "public", "regulates", "utilities", "utility", "water". | URL->B (1): https://puc.idaho.gov/. | EXACT TITLE in energy_utilities: "Idaho Public Utilities Commission".
0.510
Electrician ↗ Q165029 EXACT TITLE
buildingsdataequipmentexistinginfrastructureinstallationmaintenanceplatforms
SHARED TOKENS (8): "buildings", "data", "equipment", "existing", "infrastructure", "installation", "maintenance", "platforms". | URL->B (1): http://www.bls.gov/ooh/construction-and-extraction/electricians.htm. | EXACT TITLE in energy_utilities: "Electrician".
0.500
Well ↗ Q43483 EXACT TITLE
anotherbeneathclassesconstructioncontainscreatedevelopingenvironmentalexcavationleastmethodneedspipepointpotentialprovidereachrequireresourcesrural
SHARED TOKENS (25): "another", "beneath", "classes", "construction", "contains", "create", "developing", "environmental", "excavation", "least", "method", "needs", "pipe", "point", "potential", "provide", "reach", "require", "resources", "rural".... | EXACT TITLE in procurement_public_spending: "Well". | EXACT TITLE in energy_utilities: "Well".
0.500
Tariff ↗ EXACT TITLE
accordingamericanamongamountcostsdistributeddutieseconomiceconomyformgrowthinstrumentsintendedlocalmaterialsmeansnationalpolicypriceprovide
SHARED TOKENS (27): "according", "american", "among", "amount", "costs", "distributed", "duties", "economic", "economy", "form", "growth", "instruments", "intended", "local", "materials", "means", "national", "policy", "price", "provide".... | EXACT TITLE in energy_utilities: "Tariff".
0.500
activityamountbilliondependsdevelopingdirectlydrinkingenvironmentalfoodformmaintainmajorphysicalpreparationwaterwork
SHARED TOKENS (16): "activity", "amount", "billion", "depends", "developing", "directly", "drinking", "environmental", "food", "form", "maintain", "major", "physical", "preparation", "water", "work". | EXACT TITLE in procurement_public_spending: "Drinking water". | EXACT TITLE in energy_utilities: "Drinking water".
0.500
Idaho ↗ Q1221 EXACT TITLE
agriculturalagricultureapproximatelyaroundassociatedboisecapitalcontainsdistincteconomyidahoisolatedlaboratorylandlargestmilesmillionnationalofficialpopulation
SHARED TOKENS (28): "agricultural", "agriculture", "approximately", "around", "associated", "boise", "capital", "contains", "distinct", "economy", "idaho", "isolated", "laboratory", "land", "largest", "miles", "million", "national", "official", "population".... | EXACT TITLE in procurement_public_spending: "Idaho". | EXACT TITLE in energy_utilities: "Idaho".
0.500
Inventory ↗ Q815410 EXACT TITLE
americanbusinessbusinessescompletiondifferentfacilitygoalinformationmanagementmaterialsnetworkplannedprocessprojectsshapesupplysystemsystemswork
SHARED TOKENS (19): "american", "business", "businesses", "completion", "different", "facility", "goal", "information", "management", "materials", "network", "planned", "process", "projects", "shape", "supply", "system", "systems", "work". | EXACT TITLE in procurement_public_spending: "Inventory".
0.500
americanbillionbuildingconstructioncontractordevelopersinformationlaborlargelegallylicensingmanagementprojectprojectsrequirementsresponsiblesmallthroughoutvendorswork
SHARED TOKENS (20): "american", "billion", "building", "construction", "contractor", "developers", "information", "labor", "large", "legally", "licensing", "management", "project", "projects", "requirements", "responsible", "small", "throughout", "vendors", "work". | EXACT TITLE in procurement_public_spending: "General contractor".
0.500
accordingactualamonganalystsanotherapplycontroldatadecisionsdesigndevelopmentengineeringevaluatedevaluationevenfinancefinancialimprovementincreaseindustrial
SHARED TOKENS (45): "according", "actual", "among", "analysts", "another", "apply", "control", "data", "decisions", "design", "development", "engineering", "evaluated", "evaluation", "even", "finance", "financial", "improvement", "increase", "industrial".... | EXACT TITLE in procurement_public_spending: "Risk management".
0.500
amountcomplexconventionaldifferentdistributeddistributiondistrictenvironmentalincreasinglyintegrationmajormakesmeansmultiplenetworkoperatepowerreducerelationshipsrequire
SHARED TOKENS (27): "amount", "complex", "conventional", "different", "distributed", "distribution", "district", "environmental", "increasingly", "integration", "major", "makes", "means", "multiple", "network", "operate", "power", "reduce", "relationships", "require".... | EXACT TITLE in energy_utilities: "Distributed generation".
0.500
activityadministrativeagenciesassetsboardbusinesscertifiedcomplianceconsultingcontrolcontrolsdatadepartmentseducationalefficiencyestablishexaminationexecutivefederalfinancial
SHARED TOKENS (45): "activity", "administrative", "agencies", "assets", "board", "business", "certified", "compliance", "consulting", "control", "controls", "data", "departments", "educational", "efficiency", "establish", "examination", "executive", "federal", "financial".... | EXACT TITLE in procurement_public_spending: "Internal audit".
0.500
alongsideanalysisappliesbuildingbusinesscapitalcommercialcompletionconstructioncontrolcostdesignfirmsgoalincreasinglyinfrastructureknowledgemanagementmanagersmethod
SHARED TOKENS (29): "alongside", "analysis", "applies", "building", "business", "capital", "commercial", "completion", "construction", "control", "cost", "design", "firms", "goal", "increasingly", "infrastructure", "knowledge", "management", "managers", "method".... | EXACT TITLE in procurement_public_spending: "Construction management".
0.500
Groundwater ↗ Q161598 EXACT TITLE
agriculturalagricultureamountbecomebeneathbillioncapacitycentralchangecontainsdistributiondrinkingenvironmentalfieldformindustriallandlargestmajormovement
SHARED TOKENS (38): "agricultural", "agriculture", "amount", "become", "beneath", "billion", "capacity", "central", "change", "contains", "distribution", "drinking", "environmental", "field", "form", "industrial", "land", "largest", "major", "movement".... | EXACT TITLE in energy_utilities: "Groundwater".
0.500
Natural gas ↗ Q40858 EXACT TITLE
accordingadoptionalongsideassessmentassetschainchangecommercialdemandformedgenerallyinfrastructurelargestlayersmajorprocessesreportresultsmallsuitable
SHARED TOKENS (24): "according", "adoption", "alongside", "assessment", "assets", "chain", "change", "commercial", "demand", "formed", "generally", "infrastructure", "largest", "layers", "major", "processes", "report", "result", "small", "suitable".... | EXACT TITLE in energy_utilities: "Natural gas".
0.500
Pipeline ↗ Q25471856 EXACT TITLE
channelsconstructiondesigndrinkingenvironmentalevenmarketmaterialsmilesmillionmoveneedsnetworkpipepipelineplannedplanningprojectssolidsystem
SHARED TOKENS (25): "channels", "construction", "design", "drinking", "environmental", "even", "market", "materials", "miles", "million", "move", "needs", "network", "pipe", "pipeline", "planned", "planning", "projects", "solid", "system".... | EXACT TITLE in procurement_public_spending: "Pipeline". | EXACT TITLE in energy_utilities: "Pipeline".
0.500
Architect ↗ Q42973 EXACT TITLE
architecturebuildingsconnectionconstructiondecisionsdesigndevelopmenteducationexperienceformalinstitutionsjurisdictionlicensemeansplansprincipalprofessionalprovidepublicpurpose
SHARED TOKENS (25): "architecture", "buildings", "connection", "construction", "decisions", "design", "development", "education", "experience", "formal", "institutions", "jurisdiction", "license", "means", "plans", "principal", "professional", "provide", "public", "purpose".... | EXACT TITLE in procurement_public_spending: "Architect". | EXACT TITLE in energy_utilities: "Architect".
0.500
actadministrationappliesapplydrinkingenvironmentalfederalfoodintendedlawprivatepublicqualityregulatedstandardssystemsystemswater
SHARED TOKENS (18): "act", "administration", "applies", "apply", "drinking", "environmental", "federal", "food", "intended", "law", "private", "public", "quality", "regulated", "standards", "system", "systems", "water". | EXACT TITLE in energy_utilities: "Safe Drinking Water Act".
0.500
actbecomedeliverydepartmentdevelopmentfederalfundinglargestlawmanagementmillionpotentialpowerproduceprogramprojectsprovisionsresourcerevenuesource
SHARED TOKENS (24): "act", "become", "delivery", "department", "development", "federal", "funding", "largest", "law", "management", "million", "potential", "power", "produce", "program", "projects", "provisions", "resource", "revenue", "source".... | EXACT TITLE in energy_utilities: "Bureau of Reclamation".
0.500
becomecapacitychangecompetitivecostcurrentefficientenvironmentalevenfinancialincreaselandlargelocalmajormakingmoveneednetpoint
SHARED TOKENS (37): "become", "capacity", "change", "competitive", "cost", "current", "efficient", "environmental", "even", "financial", "increase", "land", "large", "local", "major", "making", "move", "need", "net", "point".... | EXACT TITLE in energy_utilities: "Renewable energy".
0.500
Journeyman ↗ Q582096 EXACT TITLE
becomebuildingbusinesseducationevaluationexaminationexperiencefieldgenerallyindividuallicensemeaningofficialpublicqualificationqualifiedresponsibleworkworkersworking
SHARED TOKENS (21): "become", "building", "business", "education", "evaluation", "examination", "experience", "field", "generally", "individual", "license", "meaning", "official", "public", "qualification", "qualified", "responsible", "work", "workers", "working".... | EXACT TITLE in energy_utilities: "Journeyman".
0.500
Dam ↗ Q12323 EXACT TITLE
additionalapplicationaroundavailabilitybuildingconstructiondesigndownstreamengineeringfunctionsgoverningincreaseindustriallandlargemaintenancemanagementmigrationneedspass
SHARED TOKENS (35): "additional", "application", "around", "availability", "building", "construction", "design", "downstream", "engineering", "functions", "governing", "increase", "industrial", "land", "large", "maintenance", "management", "migration", "needs", "pass".... | EXACT TITLE in procurement_public_spending: "Dam". | EXACT TITLE in energy_utilities: "Dam".
0.500
Stormwater ↗ Q1421263 EXACT TITLE
becomecreatedemanddirectlylandlargemajorpopulationpotentialreduceresourcetimingtreatmenturbanwater
SHARED TOKENS (15): "become", "create", "demand", "directly", "land", "large", "major", "population", "potential", "reduce", "resource", "timing", "treatment", "urban", "water". | EXACT TITLE in energy_utilities: "Stormwater".
0.500
actualannualcapacitycommercialcostcustomerdemandevenindividualindustrialmanagementoperatingpointpowerrepresentssinglesupplysustainedutilitiesutility
SHARED TOKENS (20): "actual", "annual", "capacity", "commercial", "cost", "customer", "demand", "even", "individual", "industrial", "management", "operating", "point", "power", "represents", "single", "supply", "sustained", "utilities", "utility". | EXACT TITLE in energy_utilities: "Peak demand".
0.500
Heat pump ↗ Q131313 EXACT TITLE
adoptionanotherbuildingchangecostdependsdistrictefficiencylimitedmeansmillionmoveneedneedsoperatespowerratherreducerolesource
SHARED TOKENS (26): "adoption", "another", "building", "change", "cost", "depends", "district", "efficiency", "limited", "means", "million", "move", "need", "needs", "operates", "power", "rather", "reduce", "role", "source".... | EXACT TITLE in energy_utilities: "Heat pump".
0.500
Tort ↗ Q158970 EXACT TITLE
actcivilcodecodescontractlawlegalmultipleobligationsprovisionsratherresultresultingrulesseparatesystems
SHARED TOKENS (16): "act", "civil", "code", "codes", "contract", "law", "legal", "multiple", "obligations", "provisions", "rather", "result", "resulting", "rules", "separate", "systems". | EXACT TITLE in procurement_public_spending: "Tort".
0.500
additionalappropriateapprovalcentralcorporationdutieseconomiceducationentityfeesfinancialfundshealthcareindividualinfrastructureinstitutionsitselflawneedpolicy
SHARED TOKENS (24): "additional", "appropriate", "approval", "central", "corporation", "duties", "economic", "education", "entity", "fees", "financial", "funds", "healthcare", "individual", "infrastructure", "institutions", "itself", "law", "need", "policy".... | EXACT TITLE in procurement_public_spending: "Government budget".
0.500
Substation ↗ Q174814 EXACT TITLE
approximatelycentralchangecommercialconnectedcontrolcustomerdifferentdistributionfunctionsgenerallyindustrialinfrastructurelargelevelsoperatedpowersmallersupplysystem
SHARED TOKENS (21): "approximately", "central", "change", "commercial", "connected", "control", "customer", "different", "distribution", "functions", "generally", "industrial", "infrastructure", "large", "levels", "operated", "power", "smaller", "supply", "system".... | EXACT TITLE in energy_utilities: "Substation".
0.500
Accounting ↗ Q4116214 EXACT TITLE
analysisboardbusinessbusinessescosteconomicentitiesfinancialfirmsfunctionsgenerallyhistoryinformationinternallevelsmajormanagementoperationsorganizationsplans
SHARED TOKENS (30): "analysis", "board", "business", "businesses", "cost", "economic", "entities", "financial", "firms", "functions", "generally", "history", "information", "internal", "levels", "major", "management", "operations", "organizations", "plans".... | EXACT TITLE in procurement_public_spending: "Accounting".
0.500
administrationassetsauthoritycertificationcivilcommercialcontroldepartmentfederalformedpersonnelregulatesstandardstraffictransportationvehicles
SHARED TOKENS (16): "administration", "assets", "authority", "certification", "civil", "commercial", "control", "department", "federal", "formed", "personnel", "regulates", "standards", "traffic", "transportation", "vehicles". | EXACT TITLE in procurement_public_spending: "Federal Aviation Administration".
0.500
agricultureamericanboisecivilcountiesdesignatedengineeringengineersidahonationaloperatedprovidepurposeupstreamwaterwestern
SHARED TOKENS (16): "agriculture", "american", "boise", "civil", "counties", "designated", "engineering", "engineers", "idaho", "national", "operated", "provide", "purpose", "upstream", "water", "western". | EXACT TITLE in energy_utilities: "Arrowrock Dam".
0.500
Airport ↗ Q1248784 EXACT TITLE
activebuildingschangecommercialcomplexcontrolemergencyenvironmentalexperiencefacilitiesfacilityinfrastructurelandlargeleastlocalmaintainmajormakingoperations
SHARED TOKENS (30): "active", "buildings", "change", "commercial", "complex", "control", "emergency", "environmental", "experience", "facilities", "facility", "infrastructure", "land", "large", "least", "local", "maintain", "major", "making", "operations".... | EXACT TITLE in procurement_public_spending: "Airport".
0.500
agenciesamericanbusinessesconductscoordinationcurrentdatadepartmenteconomicfederalfieldgovernmentslaborlevelslocalmaintainmajormanagementneedoffice
SHARED TOKENS (29): "agencies", "american", "businesses", "conducts", "coordination", "current", "data", "department", "economic", "federal", "field", "governments", "labor", "levels", "local", "maintain", "major", "management", "need", "office".... | EXACT TITLE in energy_utilities: "Bureau of Labor Statistics".
0.500
Logistics ↗ Q177777 EXACT TITLE
accordingamountanotherchaincivilcostsdedicatedefficientequipmentfacilityfieldfoodinformationmanagementmaterialsmodelmovementneedsoperationalphysical
SHARED TOKENS (32): "according", "amount", "another", "chain", "civil", "costs", "dedicated", "efficient", "equipment", "facility", "field", "food", "information", "management", "materials", "model", "movement", "needs", "operational", "physical".... | EXACT TITLE in procurement_public_spending: "Logistics".
0.500
Procurement ↗ Q829492 EXACT TITLE
accountacquisitionactivityadoptedbusinesscompetitiveconcerningdecisionsdeliveryexposureintendedorganizationalpossiblepracticespriceprocessprocessesprocurementprovidepublic
SHARED TOKENS (26): "account", "acquisition", "activity", "adopted", "business", "competitive", "concerning", "decisions", "delivery", "exposure", "intended", "organizational", "possible", "practices", "price", "process", "processes", "procurement", "provide", "public".... | EXACT TITLE in procurement_public_spending: "Procurement". | EXACT TITLE in energy_utilities: "Procurement".
0.500
buildingscivilconstructioncostsdesigneducationeducationalengineeringengineersfacilitiesinfrastructuremanagementoperationspersonnelplanningproceduresprofessionalprojectprojectsquality
SHARED TOKENS (26): "buildings", "civil", "construction", "costs", "design", "education", "educational", "engineering", "engineers", "facilities", "infrastructure", "management", "operations", "personnel", "planning", "procedures", "professional", "project", "projects", "quality".... | EXACT TITLE in procurement_public_spending: "Construction engineering".
0.500
allowsappropriatebecomesdrinkingefficiencyenvironmentenvironmentalindustrialmaintenancematerialsprocessprocessesqualityrecoveryreducesresourcesupplysystemstreatmentuses
SHARED TOKENS (21): "allows", "appropriate", "becomes", "drinking", "efficiency", "environment", "environmental", "industrial", "maintenance", "materials", "process", "processes", "quality", "recovery", "reduces", "resource", "supply", "systems", "treatment", "uses".... | EXACT TITLE in procurement_public_spending: "Water treatment". | EXACT TITLE in energy_utilities: "Water treatment".
0.500
accelerateanalysisarchitectureassociatedbecomecapabilitycompletecreateengineeringenvironmentfieldformalfundinggrowthhistoryintelligenceknowledgeleastmediamultiple
SHARED TOKENS (33): "accelerate", "analysis", "architecture", "associated", "become", "capability", "complete", "create", "engineering", "environment", "field", "formal", "funding", "growth", "history", "intelligence", "knowledge", "least", "media", "multiple".... | EXACT TITLE in procurement_public_spending: "Artificial intelligence".
0.500
Microgrid ↗ Q5762595 EXACT TITLE
allowsbuildingconnectedcontroldistributeddistributioneconomicefficiencyefficientemergencyentityevengenerallyisolatedlevelslocalmajormultipleneedsoperate
SHARED TOKENS (36): "allows", "building", "connected", "control", "distributed", "distribution", "economic", "efficiency", "efficient", "emergency", "entity", "even", "generally", "isolated", "levels", "local", "major", "multiple", "needs", "operate".... | EXACT TITLE in energy_utilities: "Microgrid".
0.500
allowingassociationcompetingcompetitivecontractingcoordinationcost-effectivecostsdesignateddevelopmenteconomicefficiencyefficientfinancialfundedfundinginfrastructureintegratedintendedlevels
SHARED TOKENS (49): "allowing", "association", "competing", "competitive", "contracting", "coordination", "cost-effective", "costs", "designated", "development", "economic", "efficiency", "efficient", "financial", "funded", "funding", "infrastructure", "integrated", "intended", "levels".... | EXACT TITLE in procurement_public_spending: "Public transport".
0.500
associationcertificationcontractorseducationalengineersgroupmanufacturersmonitoringnationaloperatesprogramspromotespublicpublishesresearchresponsibleseparatewater
SHARED TOKENS (18): "association", "certification", "contractors", "educational", "engineers", "group", "manufacturers", "monitoring", "national", "operates", "programs", "promotes", "public", "publishes", "research", "responsible", "separate", "water". | EXACT TITLE in energy_utilities: "National Ground Water Association".
0.500
Snake River ↗ Q272074 EXACT TITLE
agenciesamericancanyoncentralchannelcommercialconstructioncontroldownstreamgovernmentshistoryidaholargelargestlimitedmajormilesnationalpolicyprivate
SHARED TOKENS (31): "agencies", "american", "canyon", "central", "channel", "commercial", "construction", "control", "downstream", "governments", "history", "idaho", "large", "largest", "limited", "major", "miles", "national", "policy", "private".... | EXACT TITLE in energy_utilities: "Snake River".
0.500
associatedbeyonddatadescriptionsdevelopmententitiesgraphincreasinglyknowledgemodelnetworksoperateprojectsrelationshipsresearchscopesystemstypeuses
SHARED TOKENS (19): "associated", "beyond", "data", "descriptions", "development", "entities", "graph", "increasingly", "knowledge", "model", "networks", "operate", "projects", "relationships", "research", "scope", "systems", "type", "uses". | EXACT TITLE in procurement_public_spending: "Knowledge graph". | EXACT TITLE in energy_utilities: "Knowledge graph".
0.500
anotherbusinesscontractcontractorcostsexistingitselfneedobligationsprocurementprojectpublicreceivereduceriskrulessmallsupport
SHARED TOKENS (18): "another", "business", "contract", "contractor", "costs", "existing", "itself", "need", "obligations", "procurement", "project", "public", "receive", "reduce", "risk", "rules", "small", "support". | EXACT TITLE in procurement_public_spending: "Subcontractor".
0.500
Contract ↗ Q93288 EXACT TITLE
adoptionagreementagreementsapplybusinesscategorycivilcodecommercialcontractcontractingcontractsdifferentdistinctdistinctiondutiesfieldframeworkgenerallygoverned
SHARED TOKENS (38): "adoption", "agreement", "agreements", "apply", "business", "category", "civil", "code", "commercial", "contract", "contracting", "contracts", "different", "distinct", "distinction", "duties", "field", "framework", "generally", "governed".... | EXACT TITLE in procurement_public_spending: "Contract". | EXACT TITLE in energy_utilities: "Contract".
0.500
Surveying ↗ Q816425 EXACT TITLE
analysiscivilconstructiondesignateddevelopmentengineeringenvironmentequipmentestablishhistorylandlawlegallevelsmappingownershipplanningprofessionalpropertyresearch
SHARED TOKENS (25): "analysis", "civil", "construction", "designated", "development", "engineering", "environment", "equipment", "establish", "history", "land", "law", "legal", "levels", "mapping", "ownership", "planning", "professional", "property", "research".... | EXACT TITLE in procurement_public_spending: "Surveying".
0.500
businessconstructioncontractordesigndifferentdirectlyhomeindividualinstallationlicensesmaintenanceoperateownersprofessionalrequirementsspecializedsystemswork
SHARED TOKENS (18): "business", "construction", "contractor", "design", "different", "directly", "home", "individual", "installation", "licenses", "maintenance", "operate", "owners", "professional", "requirements", "specialized", "systems", "work". | EXACT TITLE in energy_utilities: "Electrical contractor".
0.500
adaboisecentercommercialdepartmentfacilityfieldfunctionsidahoincreasejointmilesmillionnationaloperatedoperatesreceiverequiringrightssupport
SHARED TOKENS (22): "ada", "boise", "center", "commercial", "department", "facility", "field", "functions", "idaho", "increase", "joint", "miles", "million", "national", "operated", "operates", "receive", "requiring", "rights", "support".... | EXACT TITLE in procurement_public_spending: "Boise Airport".
0.500
activeamericancentercorporationenvironmentalfacilitieslargestmanagementmaterialsoperatedoperatesoperationsprojectsproviderrecoveryresidentsresponsibilityrevenuesolidtransfer
SHARED TOKENS (23): "active", "american", "center", "corporation", "environmental", "facilities", "largest", "management", "materials", "operated", "operates", "operations", "projects", "provider", "recovery", "residents", "responsibility", "revenue", "solid", "transfer".... | EXACT TITLE in energy_utilities: "Republic Services".
0.500
Compost ↗ Q212254 EXACT TITLE
agriculturebeneficialcommercialconstructioneconomicenvironmentalfoodlandmanagementmaterialsphysicalprocessreducereducesrequiresresultingurbanwastewater
SHARED TOKENS (19): "agriculture", "beneficial", "commercial", "construction", "economic", "environmental", "food", "land", "management", "materials", "physical", "process", "reduce", "reduces", "requires", "resulting", "urban", "waste", "water". | EXACT TITLE in energy_utilities: "Compost".
0.500
Landfill ↗ Q152810 EXACT TITLE
activechangeconsolidationenvironmentalfinalformlandmanagementmaterialsmunicipalsimplysitessolidtemporarytransfertreatmentunlessuseswaste
SHARED TOKENS (19): "active", "change", "consolidation", "environmental", "final", "form", "land", "management", "materials", "municipal", "simply", "sites", "solid", "temporary", "transfer", "treatment", "unless", "uses", "waste". | EXACT TITLE in energy_utilities: "Landfill".
0.500
accordinganalysisarchitecturebuildingclassificationcodescomplianceconstructiondesignenvironmentalfieldlandmanagementplanplanningpolicyqualitytechnical
SHARED TOKENS (18): "according", "analysis", "architecture", "building", "classification", "codes", "compliance", "construction", "design", "environmental", "field", "land", "management", "plan", "planning", "policy", "quality", "technical". | EXACT TITLE in procurement_public_spending: "Landscape architect".
0.500
Bridge ↗ Q12280 EXACT TITLE
allowingbeneficialcomplexconnectingconnectionconstructioncreatedesignengineeringengineersenvironmentidentityindustrialintendedlocalmajormethodmilesnetworkpass
SHARED TOKENS (32): "allowing", "beneficial", "complex", "connecting", "connection", "construction", "create", "design", "engineering", "engineers", "environment", "identity", "industrial", "intended", "local", "major", "method", "miles", "network", "pass".... | EXACT TITLE in procurement_public_spending: "Bridge".
0.500
actadministeredchangescontrolcoordinationdirectlydrinkingengineersenvironmentalfederalformfundinggoverninggovernmentsimprovementlawmaintainmajorphysicalprovisions
SHARED TOKENS (28): "act", "administered", "changes", "control", "coordination", "directly", "drinking", "engineers", "environmental", "federal", "form", "funding", "governing", "governments", "improvement", "law", "maintain", "major", "physical", "provisions".... | EXACT TITLE in energy_utilities: "Clean Water Act".
0.500
businesscertificationcompensationcreatescustomereconomicentryformgrowthindividuallawleastlicenselicensedlicensingmarketoccupationalpermittingpracticesprofessional
SHARED TOKENS (32): "business", "certification", "compensation", "creates", "customer", "economic", "entry", "form", "growth", "individual", "law", "least", "license", "licensed", "licensing", "market", "occupational", "permitting", "practices", "professional".... | EXACT TITLE in procurement_public_spending: "Occupational licensing". | EXACT TITLE in energy_utilities: "Occupational licensing".
0.500
associatedcomplexdemandeconomicemergencyformalgenerallyhomeindexlocalmarketsnationalownershipresponsesupply
SHARED TOKENS (15): "associated", "complex", "demand", "economic", "emergency", "formal", "generally", "home", "index", "local", "markets", "national", "ownership", "response", "supply". | EXACT TITLE in procurement_public_spending: "Affordable housing".
0.500
businessdatadelivereddepartmentdistinctdocumentsfinancialformallegalordersprocessrequirementsresponsibilityreviewseekingsupplysystemvendors
SHARED TOKENS (18): "business", "data", "delivered", "department", "distinct", "documents", "financial", "formal", "legal", "orders", "process", "requirements", "responsibility", "review", "seeking", "supply", "system", "vendors". | EXACT TITLE in procurement_public_spending: "Accounts payable".
0.500
accordingactadministrationannualapplyassetsauthorizationbusinessbusinessescertificationcorporationhomeinspectionlargelicensemedicalnetoperateoperationsorganizations
SHARED TOKENS (30): "according", "act", "administration", "annual", "apply", "assets", "authorization", "business", "businesses", "certification", "corporation", "home", "inspection", "large", "license", "medical", "net", "operate", "operations", "organizations".... | EXACT TITLE in procurement_public_spending: "Small business".
0.500
abilityagreementamountapproximatelyauthoritybusinessesconstructioncontractscost-effectivedirecteconomiceconomygovernmentsgroupgrowthlocalorganizationspracticesprivateprocess
SHARED TOKENS (35): "ability", "agreement", "amount", "approximately", "authority", "businesses", "construction", "contracts", "cost-effective", "direct", "economic", "economy", "governments", "group", "growth", "local", "organizations", "practices", "private", "process".... | EXACT TITLE in procurement_public_spending: "Government procurement".
0.500
Veolia ↗ Q1632461 EXACT TITLE
adoptedbillionboardbusinessenvironmentenvironmentalgroupmajormanagementoperationspublicrevenuesingleutilitywastewater
SHARED TOKENS (16): "adopted", "billion", "board", "business", "environment", "environmental", "group", "major", "management", "operations", "public", "revenue", "single", "utility", "waste", "water". | EXACT TITLE in energy_utilities: "Veolia".
0.500
Pipefitter ↗ Q5407416 EXACT TITLE
casescentercertifiedcommercialcompletionconcentratesconstructioncontrolleddifferenteducationindustrialinstitutionallicensedmaintainsnationalpasspipeprocessregulatedrequire
SHARED TOKENS (28): "cases", "center", "certified", "commercial", "completion", "concentrates", "construction", "controlled", "different", "education", "industrial", "institutional", "licensed", "maintains", "national", "pass", "pipe", "process", "regulated", "require".... | EXACT TITLE in energy_utilities: "Pipefitter".
0.500
Canal ↗ Q12284 EXACT TITLE
buildingcaseschannelchannelscontrolcreatecurrentdrainagegenerallyincreaselevelsmanagementrequiringresourcessourcesupplyvalleyvehicleswater
SHARED TOKENS (19): "building", "cases", "channel", "channels", "control", "create", "current", "drainage", "generally", "increase", "levels", "management", "requiring", "resources", "source", "supply", "valley", "vehicles", "water". | EXACT TITLE in energy_utilities: "Canal".
0.500
Recycling ↗ Q132580 EXACT TITLE
abilityanothercentercomplexcontrolconventionaldelivereddependsdifferenteconomicenvironmentalfoodformmanagementmaterialsofficeprocessproducingpromotesrecovery
SHARED TOKENS (29): "ability", "another", "center", "complex", "control", "conventional", "delivered", "depends", "different", "economic", "environmental", "food", "form", "management", "materials", "office", "process", "producing", "promotes", "recovery".... | EXACT TITLE in energy_utilities: "Recycling".
0.500
americanapproximatelybillionboardformedgroupmajormediamovenationaloperatingoperationsprivatelyregionrevenueservingsouthwest
SHARED TOKENS (17): "american", "approximately", "billion", "board", "formed", "group", "major", "media", "move", "national", "operating", "operations", "privately", "region", "revenue", "serving", "southwest". | EXACT TITLE in procurement_public_spending: "Cox Enterprises".
0.500
capacityclassificationdatadistributedenvironmentalfundingintegrationisolatedlocalnationaloperatingpermittingpowerproceduresprocessesproduceprojectprojectsregionalrequire
SHARED TOKENS (28): "capacity", "classification", "data", "distributed", "environmental", "funding", "integration", "isolated", "local", "national", "operating", "permitting", "power", "procedures", "processes", "produce", "project", "projects", "regional", "require".... | EXACT TITLE in energy_utilities: "Small hydro".
0.500
businesscomplexcontractorscontractscustomerfinalforminformationneedspotentialpriceprocessprocurementqualityrequestsvendors
SHARED TOKENS (16): "business", "complex", "contractors", "contracts", "customer", "final", "form", "information", "needs", "potential", "price", "process", "procurement", "quality", "requests", "vendors". | EXACT TITLE in procurement_public_spending: "Request for proposal".
0.500
agenciesbeyondcasescontractcost-effectivedevelopingeconomicformformalgenerallylocaloperateoperatedoperatesoperatorsorganizationsprivateprovidepublicserving
SHARED TOKENS (28): "agencies", "beyond", "cases", "contract", "cost-effective", "developing", "economic", "form", "formal", "generally", "local", "operate", "operated", "operates", "operators", "organizations", "private", "provide", "public", "serving".... | EXACT TITLE in procurement_public_spending: "Paratransit".
0.480
activitybillioncomplianceevenformindustrialmakingmunicipaloperationsprocessprocessessolidwastewater
SHARED TOKENS (14): "activity", "billion", "compliance", "even", "form", "industrial", "making", "municipal", "operations", "process", "processes", "solid", "waste", "water". | EXACT TITLE in energy_utilities: "Industrial waste".
0.460
Highway ↗ Q269949 EXACT TITLE
accordingamericancodedesignatedlandlegalmaintainsmajorprivatepublicrightsroadssystem
SHARED TOKENS (13): "according", "american", "code", "designated", "land", "legal", "maintains", "major", "private", "public", "rights", "roads", "system". | EXACT TITLE in procurement_public_spending: "Highway".
0.460
bidbusinesscompeteformincreasinglyobtainordinarypotentialprivateprocessprocessesprocurementtype
SHARED TOKENS (13): "bid", "business", "compete", "form", "increasingly", "obtain", "ordinary", "potential", "private", "process", "processes", "procurement", "type". | EXACT TITLE in procurement_public_spending: "Reverse auction".
0.440
Carahsoft ↗ Q5037630 EXACT TITLE
americanconsultingeducationalfederalgovernmentsinformationinstitutionslocalprivatelyprovidersoftwaretechnology
SHARED TOKENS (12): "american", "consulting", "educational", "federal", "governments", "information", "institutions", "local", "privately", "provider", "software", "technology". | EXACT TITLE in procurement_public_spending: "Carahsoft".
0.440
Aquifer ↗ Q208791 EXACT TITLE
beyondenvironmenthomeindustriallandlayermajormaterialsregionsolidsourcewater
SHARED TOKENS (12): "beyond", "environment", "home", "industrial", "land", "layer", "major", "materials", "region", "solid", "source", "water". | EXACT TITLE in energy_utilities: "Aquifer".
0.440
assessmentcompliancecontactdrinkinggenerallyphysicalqualitysafetystandardssupplytreatmentwater
SHARED TOKENS (12): "assessment", "compliance", "contact", "drinking", "generally", "physical", "quality", "safety", "standards", "supply", "treatment", "water". | EXACT TITLE in energy_utilities: "Water quality".
0.440
activityadvantageannualapplicationapproximatelyaroundcapacitycontainsdirectefficiencyevensource
SHARED TOKENS (12): "activity", "advantage", "annual", "application", "approximately", "around", "capacity", "contains", "direct", "efficiency", "even", "source". | EXACT TITLE in energy_utilities: "Geothermal heating".
0.440
adaboisecanyonidahooperatesproviderpublicregionalschoolservingtreasurevalley
SHARED TOKENS (12): "ada", "boise", "canyon", "idaho", "operates", "provider", "public", "regional", "school", "serving", "treasure", "valley". | EXACT TITLE in procurement_public_spending: "Valley Regional Transit".
0.440
administrationdepartmentdivisionfederalmajorofficeprogramprogramspublicroadsroletransportation
SHARED TOKENS (12): "administration", "department", "division", "federal", "major", "office", "program", "programs", "public", "roads", "role", "transportation". | EXACT TITLE in procurement_public_spending: "Federal Highway Administration".
0.420
associateddatainformationinternalordersplanningprocessesprocurementresourcestrategicsystems
SHARED TOKENS (11): "associated", "data", "information", "internal", "orders", "planning", "processes", "procurement", "resource", "strategic", "systems". | EXACT TITLE in procurement_public_spending: "E-procurement".
0.420
Wastewater ↗ Q336191 EXACT TITLE
agriculturalanothercommercialdrinkingindustrialmunicipalprocessessewerwastewastewaterwater
SHARED TOKENS (11): "agricultural", "another", "commercial", "drinking", "industrial", "municipal", "processes", "sewer", "waste", "wastewater", "water". | EXACT TITLE in procurement_public_spending: "Wastewater". | EXACT TITLE in energy_utilities: "Wastewater".
0.420
businesscertificationcertifiedentityleastpercentprogramprovideresearchtechnologytransportation
SHARED TOKENS (11): "business", "certification", "certified", "entity", "least", "percent", "program", "provide", "research", "technology", "transportation". | EXACT TITLE in procurement_public_spending: "Disadvantaged business enterprise".
0.400
commercialcontractcontrolformitselfordersplacedplanningresourcesystem
SHARED TOKENS (10): "commercial", "contract", "control", "form", "itself", "orders", "placed", "planning", "resource", "system". | EXACT TITLE in procurement_public_spending: "Purchase order".
0.400
commercialdistributionindustrialinfrastructurenetworkrequirementssupplysystemtreatmentwater
SHARED TOKENS (10): "commercial", "distribution", "industrial", "infrastructure", "network", "requirements", "supply", "system", "treatment", "water". | EXACT TITLE in energy_utilities: "Water distribution system".
0.400
Lineworker ↗ Q691225 EXACT TITLE
buildingscommercialdistributionemergencyfacilitiesgenerallyindustrialmaintainmaintainswork
SHARED TOKENS (10): "buildings", "commercial", "distribution", "emergency", "facilities", "generally", "industrial", "maintain", "maintains", "work". | EXACT TITLE in energy_utilities: "Lineworker".
0.380
constructioncontrolcontrolsgenerallymanagementneedreducetemporarywater
SHARED TOKENS (9): "construction", "control", "controls", "generally", "management", "need", "reduce", "temporary", "water". | EXACT TITLE in energy_utilities: "Sediment control".
0.380
differentgenerallylawlegalphysicalsourcesystemstreatwater
SHARED TOKENS (9): "different", "generally", "law", "legal", "physical", "source", "systems", "treat", "water". | EXACT TITLE in procurement_public_spending: "Water right". | EXACT TITLE in energy_utilities: "Water right".
0.360
Invoice ↗ Q190581 EXACT TITLE
capitalcommercialcostslargepointpricestatedtransaction
SHARED TOKENS (8): "capital", "commercial", "costs", "large", "point", "price", "stated", "transaction". | EXACT TITLE in procurement_public_spending: "Invoice".
0.360
boisedepartmentenvironmentalfederalidahoqualityregionalresponsible
SHARED TOKENS (8): "boise", "department", "environmental", "federal", "idaho", "quality", "regional", "responsible". | EXACT TITLE in energy_utilities: "Idaho Department of Environmental Quality".
0.360
agenciesdocumenteddocumentsgenerallyinformationjurisdictionpublicrecords
SHARED TOKENS (8): "agencies", "documented", "documents", "generally", "information", "jurisdiction", "public", "records". | EXACT TITLE in procurement_public_spending: "Public records".
0.360
departmentfederalindependentlicensingpipelineprojectsregulatesserving
SHARED TOKENS (8): "department", "federal", "independent", "licensing", "pipeline", "projects", "regulates", "serving". | EXACT TITLE in energy_utilities: "Federal Energy Regulatory Commission".
0.360
Boise River ↗ Q891080 EXACT TITLE
agriculturalapproximatelyboiseidahomilessquareurbanwestern
SHARED TOKENS (8): "agricultural", "approximately", "boise", "idaho", "miles", "square", "urban", "western". | EXACT TITLE in energy_utilities: "Boise River".
0.320
Reservoir ↗ Q131681 EXACT TITLE
buildingcontrollingexistingformpowerwater
SHARED TOKENS (6): "building", "controlling", "existing", "form", "power", "water". | EXACT TITLE in energy_utilities: "Reservoir".
0.320
drinkingorganizationspublicsystemutilitieswater
SHARED TOKENS (6): "drinking", "organizations", "public", "system", "utilities", "water". | EXACT TITLE in energy_utilities: "Public water system".
0.320
canyonidahonationalsmallwestwestern
SHARED TOKENS (6): "canyon", "idaho", "national", "small", "west", "western". | EXACT TITLE in energy_utilities: "Hells Canyon".
0.300
activeamericananothercertifiedcollegecontinuingdemandeducationevenexaminationexperiencefinancialfirmsgenerallygrowthlaborlegallylicenselicensingmaintain
SHARED TOKENS (29): "active", "american", "another", "certified", "college", "continuing", "demand", "education", "even", "examination", "experience", "financial", "firms", "generally", "growth", "labor", "legally", "license", "licensing", "maintain"....
0.300
amongbuildingbusinessescapitalchainchannelscompetitivecontrolcostscreatingdelivereddemanddepartmentdesigndistributionexistingfunctionsinformationinfrastructureintegrated
SHARED TOKENS (47): "among", "building", "businesses", "capital", "chain", "channels", "competitive", "control", "costs", "creating", "delivered", "demand", "department", "design", "distribution", "existing", "functions", "information", "infrastructure", "integrated"....
0.300
anotherapplicationconstructioncreatedevelopersdevelopmentenvironmentalfieldgenerallylandmaterialsmediamunicipalphysicalprogramprogramsprojectsrequirementsresultssimply
SHARED TOKENS (24): "another", "application", "construction", "create", "developers", "development", "environmental", "field", "generally", "land", "materials", "media", "municipal", "physical", "program", "programs", "projects", "requirements", "results", "simply"....
0.300
analysisbusinesscomplexcompliancecontractcontrolscostsdatadevelopmentefficiencymanagementmonitoringplanningprocessprocurementpurpose
SHARED TOKENS (16): "analysis", "business", "complex", "compliance", "contract", "controls", "costs", "data", "development", "efficiency", "management", "monitoring", "planning", "process", "procurement", "purpose".
0.300
Project finance ↗ KW CROSS HIGH
agreementsallocationamongassetsassociatedcapitalcomplexconstructioncontractscontroldeliverydevelopingdevelopmentdistributedeconomicentityenvironmentalfailurefinancefinancial
SHARED TOKENS (47): "agreements", "allocation", "among", "assets", "associated", "capital", "complex", "construction", "contracts", "control", "delivery", "developing", "development", "distributed", "economic", "entity", "environmental", "failure", "finance", "financial"....
0.300
administrationbusinessdatadecisionseconomiceducationeducationalemploymentintelligencelawlegalmediaprocesspublicrequiringsoftwaresystemstechnical
SHARED TOKENS (18): "administration", "business", "data", "decisions", "economic", "education", "educational", "employment", "intelligence", "law", "legal", "media", "process", "public", "requiring", "software", "systems", "technical".
0.300
Open data ↗ Q309901 KW CROSS HIGH
dataeducationeducationalexplicitformgenerallygovgrowthinstitutionsitselfknowledgelicenselicensedmovementpropertypurposeresourcesrightssoftwaresource
SHARED TOKENS (20): "data", "education", "educational", "explicit", "form", "generally", "gov", "growth", "institutions", "itself", "knowledge", "license", "licensed", "movement", "property", "purpose", "resources", "rights", "software", "source".
0.300
agenciesapplicationbusinesscapabilitycasesclassificationcontractdistributionfinancialinstitutionslabormanagementmechanismoutsideprocessesprogramsreportingrisksoftwaresystem
SHARED TOKENS (22): "agencies", "application", "business", "capability", "cases", "classification", "contract", "distribution", "financial", "institutions", "labor", "management", "mechanism", "outside", "processes", "programs", "reporting", "risk", "software", "system"....
0.300
additionalagriculturalamountcapacitycostcostsdepartmentdistrictindustrialmeaningneedspowerprocessesproduceratereduceresourcessourcesupplywater
SHARED TOKENS (20): "additional", "agricultural", "amount", "capacity", "cost", "costs", "department", "district", "industrial", "meaning", "needs", "power", "processes", "produce", "rate", "reduce", "resources", "source", "supply", "water".
0.300
Black start ↗ Q655257 KW CROSS HIGH
abilityagreementamountanothercomplexemergencyfacilityindustriallargenetworkpowerprocessrequiressuitabletechnologyunits
SHARED TOKENS (16): "ability", "agreement", "amount", "another", "complex", "emergency", "facility", "industrial", "large", "network", "power", "process", "requires", "suitable", "technology", "units".
0.300
Temporary work ↗ Q667944 KW CROSS HIGH
anotherconsultantscontractcontractsdevelopmentdifferenteconomyemploymentengineeringfindingincreasinglyindividuallaborlimitedmarketneedneedsorganizationsprovidereceive
SHARED TOKENS (30): "another", "consultants", "contract", "contracts", "development", "different", "economy", "employment", "engineering", "finding", "increasingly", "individual", "labor", "limited", "market", "need", "needs", "organizations", "provide", "receive"....
0.300
allowscontrolcontrollingcostsdemanddevelopmentdirectefficiententitiesevenmakesmanagementneednetworkpowerprivateprocesspublicratherreduce
SHARED TOKENS (23): "allows", "control", "controlling", "costs", "demand", "development", "direct", "efficient", "entities", "even", "makes", "management", "need", "network", "power", "private", "process", "public", "rather", "reduce"....
0.300
Wind power ↗ Q43302 KW CROSS HIGH
agreementanalystscapacitychangeconnectedenvironmentgenerallynearlyneedspotentialpowersmallersourcesuitablesupplywork
SHARED TOKENS (16): "agreement", "analysts", "capacity", "change", "connected", "environment", "generally", "nearly", "needs", "potential", "power", "smaller", "source", "suitable", "supply", "work".
0.300
capacitychaincostdefinesdemanddistrictefficiencyformgoalgrowthintegratedlawmeansplanningpowerprocesspublicpurchasesrequiresresource
SHARED TOKENS (24): "capacity", "chain", "cost", "defines", "demand", "district", "efficiency", "form", "goal", "growth", "integrated", "law", "means", "planning", "power", "process", "public", "purchases", "requires", "resource"....
0.300
Net metering ↗ Q2685471 KW CROSS HIGH
allowingallowsannualconnectioncurrentevenfeemechanismnetpolicypowerprivateprocedurerequirerequiressinglesmallsolelytypeuses
SHARED TOKENS (20): "allowing", "allows", "annual", "connection", "current", "even", "fee", "mechanism", "net", "policy", "power", "private", "procedure", "require", "requires", "single", "small", "solely", "type", "uses".
0.300
accordingcontractcontractorsemploymentformindependentlaborlimitedmultiplenearlyrelationshipsubstantialtemporarytypeworkworkersworkforce
SHARED TOKENS (17): "according", "contract", "contractors", "employment", "form", "independent", "labor", "limited", "multiple", "nearly", "relationship", "substantial", "temporary", "type", "work", "workers", "workforce".
0.300
actamericanamongassociationauthorityconstructioncontractsdepartmentfederalfundedlandlawmaintenancemajormeridiannationalnearlyprogramprojectprojects
SHARED TOKENS (26): "act", "american", "among", "association", "authority", "construction", "contracts", "department", "federal", "funded", "land", "law", "maintenance", "major", "meridian", "national", "nearly", "program", "project", "projects"....
0.300
abilitydifferentemergencyfederalgenerallygovernmentslocalmanagementneedsorganizationsoutcomepossibleprofessionalrecoveryreducerequiresresponserisk
SHARED TOKENS (18): "ability", "different", "emergency", "federal", "generally", "governments", "local", "management", "needs", "organizations", "outcome", "possible", "professional", "recovery", "reduce", "requires", "response", "risk".
0.300
administrationagreementsamonganalysisbusinesschangescommercialcomplexcomplianceconstructionconsultantscontractcontractsexposurefinancialimplementationlegalmanagementmultiplenearly
SHARED TOKENS (43): "administration", "agreements", "among", "analysis", "business", "changes", "commercial", "complex", "compliance", "construction", "consultants", "contract", "contracts", "exposure", "financial", "implementation", "legal", "management", "multiple", "nearly"....
0.300
adaboisecanyoncountiesdesignatedhomeidaholargestmeridiannampanearlypercentpopulationtreasurevalley
SHARED TOKENS (15): "ada", "boise", "canyon", "counties", "designated", "home", "idaho", "largest", "meridian", "nampa", "nearly", "percent", "population", "treasure", "valley".
0.300
agriculturalagricultureallowsbusinessescostcostsdirectdistributiondrinkingenvironmentalindustrialmanagementmeaningmunicipalneedsplannedpossibleprocessreachrecovery
SHARED TOKENS (32): "agricultural", "agriculture", "allows", "businesses", "cost", "costs", "direct", "distribution", "drinking", "environmental", "industrial", "management", "meaning", "municipal", "needs", "planned", "possible", "process", "reach", "recovery"....
0.300
actbusinesscompliancecontrolcontrolsefficiencyentitiesfinancialinternalmanagementmeansoperationalorganizationalphysicalpracticesproceduresprocesspropertypublicreduce
SHARED TOKENS (26): "act", "business", "compliance", "control", "controls", "efficiency", "entities", "financial", "internal", "management", "means", "operational", "organizational", "physical", "practices", "procedures", "process", "property", "public", "reduce"....
0.300
Smart grid ↗ Q689855 KW CROSS HIGH
capacitycodeconnectcontrolcreatecurrentdeliverydemanddescribeddistributeddistributionefficiencyefficientevenfinancedgenerichomeimprovementinformationinfrastructure
SHARED TOKENS (44): "capacity", "code", "connect", "control", "create", "current", "delivery", "demand", "described", "distributed", "distribution", "efficiency", "efficient", "even", "financed", "generic", "home", "improvement", "information", "infrastructure"....
0.300
activeagenciesallowsassociatedbusinessescapacitycasescompetitivedeterminedistributioneconomicemploymententryexistingfirmsindustriallandlawmarketpower
SHARED TOKENS (28): "active", "agencies", "allows", "associated", "businesses", "capacity", "cases", "competitive", "determine", "distribution", "economic", "employment", "entry", "existing", "firms", "industrial", "land", "law", "market", "power"....
0.300
additionalapplicationaroundavailabilitycategorycostdeliverydevelopmentdistinguisheconomyefficiencyenvironmentfeefeesforminfrastructurelicensemodeloperatingownership
SHARED TOKENS (30): "additional", "application", "around", "availability", "category", "cost", "delivery", "development", "distinguish", "economy", "efficiency", "environment", "fee", "fees", "form", "infrastructure", "license", "model", "operating", "ownership"....
0.300
anotherbecomechaincomplexconsolidationcorporationdescribeddifferentdirectlyeconomyfinalintegratedintegrationlargemakingmanagementmarketmarketplacemethodneed
SHARED TOKENS (25): "another", "become", "chain", "complex", "consolidation", "corporation", "described", "different", "directly", "economy", "final", "integrated", "integration", "large", "making", "management", "market", "marketplace", "method", "need"....
0.300
activityadministrationadministrativeagenciesanotherchangescivilcontroldecisionsdivisioneconomiceducationenvironmentenvironmentalexecutivegenerallygoverningincreaseitselflaw
SHARED TOKENS (31): "activity", "administration", "administrative", "agencies", "another", "changes", "civil", "control", "decisions", "division", "economic", "education", "environment", "environmental", "executive", "generally", "governing", "increase", "itself", "law"....
0.300
acquireacquisitionbusinesscapitalchangescreatecurrentdirectlydistributiondutieseconomyeducationemergencyemploymententryestablishesfeesfinalfirmsgovernments
SHARED TOKENS (39): "acquire", "acquisition", "business", "capital", "changes", "create", "current", "directly", "distribution", "duties", "economy", "education", "emergency", "employment", "entry", "establishes", "fees", "final", "firms", "governments"....
0.300
abilityadditionalanalysisanotherbecomechangeconsultantsconsultingdescriptiondevelopmenteconomicefficientexpertiseexposurefirmsfunctionsimplementationimprovementinternallegal
SHARED TOKENS (38): "ability", "additional", "analysis", "another", "become", "change", "consultants", "consulting", "description", "development", "economic", "efficient", "expertise", "exposure", "firms", "functions", "implementation", "improvement", "internal", "legal"....
0.300
Utility pole ↗ Q1144084 KW CROSS HIGH
applicationdifferentdistributionequipmentgenerallyincreasinglylargepowerpublicreducesafetysupportsystemsystemsthemutilitiesutilityvehicleswestern
SHARED TOKENS (19): "application", "different", "distribution", "equipment", "generally", "increasingly", "large", "power", "public", "reduce", "safety", "support", "system", "systems", "them", "utilities", "utility", "vehicles", "western".
0.300
analysisaroundbuildingbuildingscapacitycommercialdistributedenvironmentequipmentformindustriallargemanagementmillionmonitoringnetpowerreachsmallstructure
SHARED TOKENS (23): "analysis", "around", "building", "buildings", "capacity", "commercial", "distributed", "environment", "equipment", "form", "industrial", "large", "management", "million", "monitoring", "net", "power", "reach", "small", "structure"....
0.300
advantagecapitalcostcostscreatingentryfailurefirmsforminfrastructurelargelargestmarketmultipleoperatepotentialpublicrelevantsinglesupply
SHARED TOKENS (24): "advantage", "capital", "cost", "costs", "creating", "entry", "failure", "firms", "form", "infrastructure", "large", "largest", "market", "multiple", "operate", "potential", "public", "relevant", "single", "supply"....
0.300
approximatelyaroundcapacitycostcreatecreatescreatingdevelopmentdownstreamformlocalmarketmeansnetworkspossibleprocessprocessesreportrequirementsrequires
SHARED TOKENS (25): "approximately", "around", "capacity", "cost", "create", "creates", "creating", "development", "downstream", "form", "local", "market", "means", "networks", "possible", "process", "processes", "report", "requirements", "requires"....
0.300
Combined sewer ↗ Q361472 KW CROSS HIGH
buildingbuildingscapacityconstructioncontactscostsdesigndrainagedrinkingenvironmentalexperiencefacilitiesindividualindustrialinfrastructurelargemeansoperatepointrate
SHARED TOKENS (37): "building", "buildings", "capacity", "construction", "contacts", "costs", "design", "drainage", "drinking", "environmental", "experience", "facilities", "individual", "industrial", "infrastructure", "large", "means", "operate", "point", "rate"....
0.300
Photovoltaics ↗ Q192127 KW CROSS HIGH
additionalavailabilitybidcapacitychangecostcostscurrentdemanddevelopingdirectdistributionefficiencyfinancialfundedgrowthhistoryinstallationlandlarge
SHARED TOKENS (43): "additional", "availability", "bid", "capacity", "change", "cost", "costs", "current", "demand", "developing", "direct", "distribution", "efficiency", "financial", "funded", "growth", "history", "installation", "land", "large"....
0.300
Eutrophication ↗ Q156698 KW CROSS HIGH
agriculturecontrolsculturaldevelopmentenvironmentenvironmentalgrowthindustrialpointprocessprogramreduceresultresultingsourcesubstantialwastewaterwater
SHARED TOKENS (18): "agriculture", "controls", "cultural", "development", "environment", "environmental", "growth", "industrial", "point", "process", "program", "reduce", "result", "resulting", "source", "substantial", "wastewater", "water".
0.300
buildingcertifiedconstructioncontractingcontractorcontractorscostsfinancialknowledgelawprofessionalprojectprojectsqualifiedresponsibletitlework
SHARED TOKENS (17): "building", "certified", "construction", "contracting", "contractor", "contractors", "costs", "financial", "knowledge", "law", "professional", "project", "projects", "qualified", "responsible", "title", "work".
0.300
collegeeconomiceducationeducationalformalindividualinstitutionknowledgelevelsnamespreparesprovideschoolschoolsspecializedtechnicaltechnologytrainingtype
SHARED TOKENS (19): "college", "economic", "education", "educational", "formal", "individual", "institution", "knowledge", "levels", "names", "prepares", "provide", "school", "schools", "specialized", "technical", "technology", "training", "type".
0.300
Septic tank ↗ Q386300 KW CROSS HIGH
connectedefficiencyenvironmentfacilityfieldmethodprocessesratereduceruralsystemsystemsthereforetreatmenttypeunitswastewastewater
SHARED TOKENS (18): "connected", "efficiency", "environment", "facility", "field", "method", "processes", "rate", "reduce", "rural", "system", "systems", "therefore", "treatment", "type", "units", "waste", "wastewater".
0.300
allowsapproximatelyassociationconductsconstructioncontractorscostdatajointlabornationalnetworksprogramspublicrepresentstelecommunicationstrainingutilitiesworkworkers
SHARED TOKENS (20): "allows", "approximately", "association", "conducts", "construction", "contractors", "cost", "data", "joint", "labor", "national", "networks", "programs", "public", "represents", "telecommunications", "training", "utilities", "work", "workers".
0.300
abilityamericanamongbusinessescapacitychangescompetedevelopersdevelopmenteconomiceducationevaluatedformformalhistoryhomeincreaseleastlevelsneed
SHARED TOKENS (39): "ability", "american", "among", "businesses", "capacity", "changes", "compete", "developers", "development", "economic", "education", "evaluated", "form", "formal", "history", "home", "increase", "least", "levels", "need"....
0.300
Data quality ↗ Q1757694 KW CROSS HIGH
becomesbusinessescasesdataevenformgenerallygovernanceinformationintendedinternalmakingoperationsplanningpurposequalityrepresentsstandardsuses
SHARED TOKENS (19): "becomes", "businesses", "cases", "data", "even", "form", "generally", "governance", "information", "intended", "internal", "making", "operations", "planning", "purpose", "quality", "represents", "standards", "uses".
0.300
additionalbuildingcurrentdepartmentdevelopmentdirectlydirectsexecutivefederallaboratoriesnationaloriginatingphysicalpolicypowerprogramprojectresearchsystem
SHARED TOKENS (19): "additional", "building", "current", "department", "development", "directly", "directs", "executive", "federal", "laboratories", "national", "originating", "physical", "policy", "power", "program", "project", "research", "system".
0.300
anotherassociatedcategoriescostcostsdifferenteconomicexperiencefinancialformedidentitymanagementproviderresourcesresultstrategicvalue
SHARED TOKENS (17): "another", "associated", "categories", "cost", "costs", "different", "economic", "experience", "financial", "formed", "identity", "management", "provider", "resources", "result", "strategic", "value".
0.300
allowingallowschangescommercialcontrolledcurrentdifferentdirecteconomyformindependentlynetworknetworkspowerrapidrequiresourcesystemsystemstechnology
SHARED TOKENS (22): "allowing", "allows", "changes", "commercial", "controlled", "current", "different", "direct", "economy", "form", "independently", "network", "networks", "power", "rapid", "require", "source", "system", "systems", "technology"....
0.300
allowsbecomebillioncomplexconnectedconnectingcurrentdeliverydistributionefficientlargemarketsmeaningmillionnearlyneednetworkoperatepopulationpower
SHARED TOKENS (25): "allows", "become", "billion", "complex", "connected", "connecting", "current", "delivery", "distribution", "efficient", "large", "markets", "meaning", "million", "nearly", "need", "network", "operate", "population", "power"....
0.300
allocationanalysisattributesdatadecisionsdesigngenerallyindividualitselflegalmeansprocessesrelevantresponsibilityresulting
SHARED TOKENS (15): "allocation", "analysis", "attributes", "data", "decisions", "design", "generally", "individual", "itself", "legal", "means", "processes", "relevant", "responsibility", "resulting".
0.300
anothercapacitycostdemanddevelopmentdifferentefficiencyenvironmentalformgenerallylargematerialspowerraterathersafetytechnologytypeusesvehicles
SHARED TOKENS (22): "another", "capacity", "cost", "demand", "development", "different", "efficiency", "environmental", "form", "generally", "large", "materials", "power", "rate", "rather", "safety", "technology", "type", "uses", "vehicles"....
0.300
accordingaccountamericanbusinessbusinessescentralcertificationcertifiedcontrolleddevelopmentfederalfirmsleastmillionnearlyoperatedreviewwest
SHARED TOKENS (18): "according", "account", "american", "business", "businesses", "central", "certification", "certified", "controlled", "development", "federal", "firms", "least", "million", "nearly", "operated", "review", "west".
0.300
activityamongapproximatelyassociationboisecanyoncapacitycentercontainscountiescreatesdirectlyedgeexecutivefederalidaholargestlocalmilesnampa
SHARED TOKENS (31): "activity", "among", "approximately", "association", "boise", "canyon", "capacity", "center", "contains", "counties", "creates", "directly", "edge", "executive", "federal", "idaho", "largest", "local", "miles", "nampa"....
0.300
analysisassessmentbroaderbuildingchangechangescontrolengineeringexposureincreaseindividualinfrastructurelevelsmanagementpotentialpracticesprocessesreduceriskseparate
SHARED TOKENS (26): "analysis", "assessment", "broader", "building", "change", "changes", "control", "engineering", "exposure", "increase", "individual", "infrastructure", "levels", "management", "potential", "practices", "processes", "reduce", "risk", "separate"....
0.300
amongassociationavailabilitybecomedevelopmentdistributionefficiencyincreaselimitednationalpowerrapidresourcesresultsupplies
SHARED TOKENS (15): "among", "association", "availability", "become", "development", "distribution", "efficiency", "increase", "limited", "national", "power", "rapid", "resources", "result", "supplies".
0.300
adadistrictentityidahoindependent
SHARED TOKENS (5): "ada", "district", "entity", "idaho", "independent". | EXACT TITLE in procurement_public_spending: "Ada County Highway District".
0.300
amountcasescompensationcontractcostcostsdedicatedevenformedgroupindividuallegalpolicyratherriskrulesystemunless
SHARED TOKENS (18): "amount", "cases", "compensation", "contract", "cost", "costs", "dedicated", "even", "formed", "group", "individual", "legal", "policy", "rather", "risk", "rule", "system", "unless".
0.300
businessescapacitychangechangescostcustomerdemanddirectdirectlyeconomicexplicitimplicationlargemanagementnetnetworksoperateplannedpowerprice
SHARED TOKENS (33): "businesses", "capacity", "change", "changes", "cost", "customer", "demand", "direct", "directly", "economic", "explicit", "implication", "large", "management", "net", "networks", "operate", "planned", "power", "price"....
0.300
Cost estimate ↗ Q795053 KW CROSS HIGH
americanassociationcostcostsdatadefinesdocumentedengineeringindividualofficepointpotentialprocessprogramprojectscopesinglevalue
SHARED TOKENS (18): "american", "association", "cost", "costs", "data", "defines", "documented", "engineering", "individual", "office", "point", "potential", "process", "program", "project", "scope", "single", "value".
0.300
aroundassessmentconductsdepartmenteducationengineersenvironmentalexecutivefederalfinancialgovernmentsindependentinformationlaboratorieslegallevelslocalmonitoringnationalpermitting
SHARED TOKENS (29): "around", "assessment", "conducts", "department", "education", "engineers", "environmental", "executive", "federal", "financial", "governments", "independent", "information", "laboratories", "legal", "levels", "local", "monitoring", "national", "permitting"....
0.300
billionbusinesscapacitycategorycommercialcoredatadepartmentsdevelopingdevelopmentefficiencyexistingfinancefunctionsincreasinglyinformationintegratedlargemanagementmanages
SHARED TOKENS (44): "billion", "business", "capacity", "category", "commercial", "core", "data", "departments", "developing", "development", "efficiency", "existing", "finance", "functions", "increasingly", "information", "integrated", "large", "management", "manages"....
0.300
Energy conservation ↗ KW CROSS HIGH
anothercomplexcosteconomicefficiencyefficientengineeringenvironmentalformgrowthidentifylargemaintenancemonitoringoperationspracticesprofilereducesmallersource
SHARED TOKENS (24): "another", "complex", "cost", "economic", "efficiency", "efficient", "engineering", "environmental", "form", "growth", "identify", "large", "maintenance", "monitoring", "operations", "practices", "profile", "reduce", "smaller", "source"....
0.300
acquiredirecteconomicentityfederalfinancialformfundinggrantslawlocalorganizationsoutsideprivateprogramsprojectspropertypublicpurposerevenue
SHARED TOKENS (21): "acquire", "direct", "economic", "entity", "federal", "financial", "form", "funding", "grants", "law", "local", "organizations", "outside", "private", "programs", "projects", "property", "public", "purpose", "revenue"....
0.300
agenciesallowsamonganotherappropriateavailabilitybidbusinessbusinessescasescategoriescomparecompetitivecontractcontractorsdeliverydeterminedifferentdocumentsentity
SHARED TOKENS (50): "agencies", "allows", "among", "another", "appropriate", "availability", "bid", "business", "businesses", "cases", "categories", "compare", "competitive", "contract", "contractors", "delivery", "determine", "different", "documents", "entity"....
0.300
CARES Act ↗ Q88815228 KW CROSS HIGH
actadditionaladministrationapplybillionbusinessbusinessesclasscompensationdevelopmentdirecteconomicfundinggenerallygovernmentshistoryindividuallargestlawlocal
SHARED TOKENS (32): "act", "additional", "administration", "apply", "billion", "business", "businesses", "class", "compensation", "development", "direct", "economic", "funding", "generally", "governments", "history", "individual", "largest", "law", "local"....
0.300
becomebusinesscentralcommercialcreatingdevelopmentfinancialfundshistoryindependentindividualinstitutionsmultipleorganizationsownersprojectprojectsrisksmallsource
SHARED TOKENS (20): "become", "business", "central", "commercial", "creating", "development", "financial", "funds", "history", "independent", "individual", "institutions", "multiple", "organizations", "owners", "project", "projects", "risk", "small", "source".
0.300
boisecontainsdistrictsfacilitieshomeidaholandmaintainmilesmultiplenationalpercentresourcessustainedunitswaterwest
SHARED TOKENS (17): "boise", "contains", "districts", "facilities", "home", "idaho", "land", "maintain", "miles", "multiple", "national", "percent", "resources", "sustained", "units", "water", "west".
0.300
chainchannelscontractcostdevelopingdevelopmentdistinctenvironmentfirmsimprovementincreaseindividualinfrastructurelabormanagementmarketneedsoperationsordersplaced
SHARED TOKENS (29): "chain", "channels", "contract", "cost", "developing", "development", "distinct", "environment", "firms", "improvement", "increase", "individual", "infrastructure", "labor", "management", "market", "needs", "operations", "orders", "placed"....
0.300
accountapproximatelyfacilitiesfacilityinfrastructuremunicipalpropertypublicsystemstreattreatmenttypeunitswastewaterwestern
SHARED TOKENS (15): "account", "approximately", "facilities", "facility", "infrastructure", "municipal", "property", "public", "systems", "treat", "treatment", "type", "units", "wastewater", "western".
0.300
becomesdatadependencedisruptionfieldfinancefunctionsinformationinfrastructurenetworknetworksphysicalpowerprocessesprovidesoftwarestandardssystemstechnologytherefore
SHARED TOKENS (20): "becomes", "data", "dependence", "disruption", "field", "finance", "functions", "information", "infrastructure", "network", "networks", "physical", "power", "processes", "provide", "software", "standards", "systems", "technology", "therefore".
0.300
amongcapacitydistributedemploymentincreasinglyindividuallargestlocalmilesobtainpercentplanspowerprojectrequiringresearchsmallsouthwestsystemsystems
SHARED TOKENS (22): "among", "capacity", "distributed", "employment", "increasingly", "individual", "largest", "local", "miles", "obtain", "percent", "plans", "power", "project", "requiring", "research", "small", "southwest", "system", "systems"....
0.300
changedeliverydemanddirectlydistributiongrowthmeansmethodpowerprocessproposedreportedsupplyutilitieswater
SHARED TOKENS (15): "change", "delivery", "demand", "directly", "distribution", "growth", "means", "method", "power", "process", "proposed", "reported", "supply", "utilities", "water".
0.300
accordingactalongsideamericananotherbillionbusinessbusinessesclassificationdirectdistributioneconomiceducationfinalfinancialfundsgovernmentsindividualinfrastructurelabor
SHARED TOKENS (32): "according", "act", "alongside", "american", "another", "billion", "business", "businesses", "classification", "direct", "distribution", "economic", "education", "final", "financial", "funds", "governments", "individual", "infrastructure", "labor"....
0.300
amongamountcapacitycomplexconstructioncreatingdemanddirectenvironmentalfailurelandlargelargestmakingnearlypopulationpowerprincipallyprovideregion
SHARED TOKENS (28): "among", "amount", "capacity", "complex", "construction", "creating", "demand", "direct", "environmental", "failure", "land", "large", "largest", "making", "nearly", "population", "power", "principally", "provide", "region"....
0.300
adaboiseconstructioncontroldirectlydownstreamengineersfederalidahomilesmultipleoperatingoperationalpowerprivatepurposeupstreamutilitywestern
SHARED TOKENS (19): "ada", "boise", "construction", "control", "directly", "downstream", "engineers", "federal", "idaho", "miles", "multiple", "operating", "operational", "power", "private", "purpose", "upstream", "utility", "western".
0.300
connectscurrentdeliverydirectdirectlydistinctdistributionefficiencyevenformincreaselocalmajormarketmovementnetworkpowerseparatetypewestern
SHARED TOKENS (20): "connects", "current", "delivery", "direct", "directly", "distinct", "distribution", "efficiency", "even", "form", "increase", "local", "major", "market", "movement", "network", "power", "separate", "type", "western".
0.300
Traffic light ↗ Q8004 KW CROSS HIGH
capacitychangecompetingcontrolinformationlocalnationalneedreducesignalssquaresystemsystemstechnologytrafficvertically
SHARED TOKENS (16): "capacity", "change", "competing", "control", "information", "local", "national", "need", "reduce", "signals", "square", "system", "systems", "technology", "traffic", "vertically".
0.300
accordingadministrationboisecanyoncapacitycomplexcontainscontractordrainagefinalidahoinformationlargestoperatedpowerprivatelyprojectunitsupstreamwestern
SHARED TOKENS (20): "according", "administration", "boise", "canyon", "capacity", "complex", "contains", "contractor", "drainage", "final", "idaho", "information", "largest", "operated", "power", "privately", "project", "units", "upstream", "western".
0.300
Off-the-grid ↗ Q267162 KW CROSS HIGH
allowsbuildingbuildingscannotconnectedcostenvironmentalfoodgenerallyindependentisolateditselfpublicreachreducesewersmallsupplysystemsutilities
SHARED TOKENS (23): "allows", "building", "buildings", "cannot", "connected", "cost", "environmental", "food", "generally", "independent", "isolated", "itself", "public", "reach", "reduce", "sewer", "small", "supply", "systems", "utilities"....
0.300
agenciesavailabilitybuildingbusinesscategoriesdeliverydevelopingdocumentsfilesfinalformgenerallyinformationlegalpdfpotentialprivatelyprocessprovidepublicly
SHARED TOKENS (26): "agencies", "availability", "building", "business", "categories", "delivery", "developing", "documents", "files", "final", "form", "generally", "information", "legal", "pdf", "potential", "privately", "process", "provide", "publicly"....
0.300
actactivitybeyondbidbusinesscasescompetingcontractcontractorscontractscostsdecisionsdifferenteconomicevaluationformalguidanceincreaseincreasinglylegally
SHARED TOKENS (41): "act", "activity", "beyond", "bid", "business", "cases", "competing", "contract", "contractors", "contracts", "costs", "decisions", "different", "economic", "evaluation", "formal", "guidance", "increase", "increasingly", "legally"....
0.300
Water metering ↗ Q268503 KW CROSS HIGH
americanassociationbuildingcommercialdeterminemethodoutsideprocesspublicrequirementsstandardssupplysystemtechnologytypeunitswaterworks
SHARED TOKENS (18): "american", "association", "building", "commercial", "determine", "method", "outside", "process", "public", "requirements", "standards", "supply", "system", "technology", "type", "units", "water", "works".
0.300
accordingassociatedbuildingcapabilitycodecodescontrolcurrentdesigndistributionenvironmentalexposureinstallationlargelevelslocalmodelnationaloperatingproperty
SHARED TOKENS (29): "according", "associated", "building", "capability", "code", "codes", "control", "current", "design", "distribution", "environmental", "exposure", "installation", "large", "levels", "local", "model", "national", "operating", "property"....
0.300
accordingactivityanalysisbecomescasesdesignengineerengineeringengineersenvironmentlegallicenselicensedlocalmaintenanceplansprocessprofessionalprojectprojects
SHARED TOKENS (31): "according", "activity", "analysis", "becomes", "cases", "design", "engineer", "engineering", "engineers", "environment", "legal", "license", "licensed", "local", "maintenance", "plans", "process", "professional", "project", "projects"....
0.300
collegedifferenteducationeducationalformgenerallyinstitutioninstitutionsmaintainpolicyprogramsschoolstudentstransfertypeuniversityworkforce
SHARED TOKENS (17): "college", "different", "education", "educational", "form", "generally", "institution", "institutions", "maintain", "policy", "programs", "school", "students", "transfer", "type", "university", "workforce".
0.300
Sewage treatment ↗ KW CROSS HIGH
accountapplicationapproximatelyaroundavailabilitybusinessesconnectedconstructioncontainscostsdemanddesigndevelopingdifferentdrainageengineersenvironmentevenfieldindustrial
SHARED TOKENS (50): "account", "application", "approximately", "around", "availability", "businesses", "connected", "construction", "contains", "costs", "demand", "design", "developing", "different", "drainage", "engineers", "environment", "even", "field", "industrial"....
0.300
boardbusinesscentraldedicatedentitiesfinancialframeworkfundedlegalmanagementorganizationsprocesspromotespublicpubliclyreportingresourcesspecializedstandards
SHARED TOKENS (19): "board", "business", "central", "dedicated", "entities", "financial", "framework", "funded", "legal", "management", "organizations", "process", "promotes", "public", "publicly", "reporting", "resources", "specialized", "standards".
0.300
Building code ↗ Q2333573 KW CROSS HIGH
adoptedapplyappropriateauthoritybecomesbuildingbuildingscodecodescomplianceconstructioncontroldepartmentsdesigndevelopersdistrictengineersenvironmentalfacilitygenerally
SHARED TOKENS (42): "adopted", "apply", "appropriate", "authority", "becomes", "building", "buildings", "code", "codes", "compliance", "construction", "control", "departments", "design", "developers", "district", "engineers", "environmental", "facility", "generally"....
0.300
buildingbuildingscontrolcostsdesignefficiencyengineersenvironmentalmaintenanceoperatingperformanceprojectsprovidequalitysystemstechnologyvehicleswater
SHARED TOKENS (18): "building", "buildings", "control", "costs", "design", "efficiency", "engineers", "environmental", "maintenance", "operating", "performance", "projects", "provide", "quality", "systems", "technology", "vehicles", "water".
0.300
actualcaseschangechangescontrolcontrolledcontrolsdownstreamequipmentintendedmaintainmaintainsmechanismparallelprovidereducesregulatedresponseseparateupstream
SHARED TOKENS (21): "actual", "cases", "change", "changes", "control", "controlled", "controls", "downstream", "equipment", "intended", "maintain", "maintains", "mechanism", "parallel", "provide", "reduces", "regulated", "response", "separate", "upstream"....
0.300
actadministeredadministrationagenciesamericancurrentdebtdepartmentdepartmentsdutiesexecutivefederalfinancefinancialinstitutionsinternallicenseslimitedmajormanages
SHARED TOKENS (29): "act", "administered", "administration", "agencies", "american", "current", "debt", "department", "departments", "duties", "executive", "federal", "finance", "financial", "institutions", "internal", "licenses", "limited", "major", "manages"....
0.300
anotherbecomesbeyondcapacitychangeconnectedcostdemandeconomicexperienceformlargelargestmakingmanagementneedpowerpriceprovideresponse
SHARED TOKENS (22): "another", "becomes", "beyond", "capacity", "change", "connected", "cost", "demand", "economic", "experience", "form", "large", "largest", "making", "management", "need", "power", "price", "provide", "response"....
0.300
Solar power ↗ Q1483757 KW CROSS HIGH
capacitychangecommercialcontinuingcostcurrentdirectlyintegrationlargelargestmethodpolicypowersinglesmallsolelysourcesystemsystems
SHARED TOKENS (19): "capacity", "change", "commercial", "continuing", "cost", "current", "directly", "integration", "large", "largest", "method", "policy", "power", "single", "small", "solely", "source", "system", "systems".
0.300
actagricultureamericanapproximatelyboardboisecapacitycentercompletionconstructiondesignhomeidaholaborlawmaterialsmilesnationaloperatedpower
SHARED TOKENS (30): "act", "agriculture", "american", "approximately", "board", "boise", "capacity", "center", "completion", "construction", "design", "home", "idaho", "labor", "law", "materials", "miles", "national", "operated", "power"....
0.300
authorizationcenterdepartmentdevelopmentefficiencyfundedhomeintegrationjointlaboratorynationaloperatedresearchsystemstechnologytransportation
SHARED TOKENS (16): "authorization", "center", "department", "development", "efficiency", "funded", "home", "integration", "joint", "laboratory", "national", "operated", "research", "systems", "technology", "transportation".
0.300
Law enforcement ↗ KW CROSS HIGH
actactivityassociatedauthoritycodesgoverningindependentlyinstitutionslawlegaloperateorganizationspowerpropertypublicrecordrulessystemthroughout
SHARED TOKENS (19): "act", "activity", "associated", "authority", "codes", "governing", "independently", "institutions", "law", "legal", "operate", "organizations", "power", "property", "public", "record", "rules", "system", "throughout".
0.300
agenciesapplyassessmentbeneficialbusinessesdesignevaluationfacilitiesgenerallymovemovementneedsplanningprivateprocesspublicsystemtransportation
SHARED TOKENS (18): "agencies", "apply", "assessment", "beneficial", "businesses", "design", "evaluation", "facilities", "generally", "move", "movement", "needs", "planning", "private", "process", "public", "system", "transportation".
0.300
actualaddressescleaningcodecompletedatadifferententitiesentryexistinginformationmeansprocessqualityratherrecordssystem
SHARED TOKENS (17): "actual", "addresses", "cleaning", "code", "complete", "data", "different", "entities", "entry", "existing", "information", "means", "process", "quality", "rather", "records", "system".
0.300
accordingauthoritybecomesbusinesscapitalcooperativecostcost-effectivecustomerdeliverydistributedformformedgovernedgrowthindividualinfrastructurelargelocalmarkets
SHARED TOKENS (38): "according", "authority", "becomes", "business", "capital", "cooperative", "cost", "cost-effective", "customer", "delivery", "distributed", "form", "formed", "governed", "growth", "individual", "infrastructure", "large", "local", "markets"....
0.300
Public finance ↗ Q274490 KW CROSS HIGH
allocationamericanamongcentraldirectdistributioneconomiceconomyefficientfailurefieldfinanceframeworkgovernmentsmarketpolicypublicresearchresourcesrevenue
SHARED TOKENS (22): "allocation", "american", "among", "central", "direct", "distribution", "economic", "economy", "efficient", "failure", "field", "finance", "framework", "governments", "market", "policy", "public", "research", "resources", "revenue"....
0.300
approximatelybidchangescompleteconstructioncontactcontractcontractingcontractorcontractscostsdeliverydesignentityindependentlyjointlegalmethodownerpoint
SHARED TOKENS (35): "approximately", "bid", "changes", "complete", "construction", "contact", "contract", "contracting", "contractor", "contracts", "costs", "delivery", "design", "entity", "independently", "joint", "legal", "method", "owner", "point"....
0.300
amountcommercialconnectconnectedcustomerdeliverydirectlydistributesdistributionequipmentfinalfunctionsindividualindustrialmultiplepowerruralsystemurbanutility
SHARED TOKENS (20): "amount", "commercial", "connect", "connected", "customer", "delivery", "directly", "distributes", "distribution", "equipment", "final", "functions", "individual", "industrial", "multiple", "power", "rural", "system", "urban", "utility".
0.300
compliancecontractcontractscostefficiencyfinanciallawlegalmanagementobligationsoperationalorganizationalprocessesreducerenewalrequirementsrisksoftwarethroughoutunderstanding
SHARED TOKENS (20): "compliance", "contract", "contracts", "cost", "efficiency", "financial", "law", "legal", "management", "obligations", "operational", "organizational", "processes", "reduce", "renewal", "requirements", "risk", "software", "throughout", "understanding".
0.300
activearoundcapacityconnectioncontrolcostcostscustomerdemandevenfacilityformgenerallygroupindividuallargelargestoperatingplacedpower
SHARED TOKENS (31): "active", "around", "capacity", "connection", "control", "cost", "costs", "customer", "demand", "even", "facility", "form", "generally", "group", "individual", "large", "largest", "operating", "placed", "power"....
🫐 BERRY40 edges
0.280
authoritycooperativecorporationdesignateddistrictdistrictsentitylargelocalobtainpowerprojectspublicwater
SHARED TOKENS (14): "authority", "cooperative", "corporation", "designated", "district", "districts", "entity", "large", "local", "obtain", "power", "projects", "public", "water".
0.280
OpenGov ↗ Q17084399 EXACT TITLE
acquireownerprivatetechnology
SHARED TOKENS (4): "acquire", "owner", "private", "technology". | EXACT TITLE in procurement_public_spending: "OpenGov".
0.280
departmentdevelopmentfederalfundsgoalgovernmentsgrantsinfrastructurelocalprogramprogramsstatedsubjecturban
SHARED TOKENS (14): "department", "development", "federal", "funds", "goal", "governments", "grants", "infrastructure", "local", "program", "programs", "stated", "subject", "urban".
0.280
Solar inverter ↗ Q129316 KW CROSS HIGH
allowingcommercialcurrentdirectequipmentfunctionslocalnetworkordinarypointpowersystemtypeutility
SHARED TOKENS (14): "allowing", "commercial", "current", "direct", "equipment", "functions", "local", "network", "ordinary", "point", "power", "system", "type", "utility".
0.280
Indemnity ↗ Q708399 KW CROSS HIGH
anothercompensationcontractcontractsdifferentformitselflawlimitedmedicalownerprincipalrelationshiprelevant
SHARED TOKENS (14): "another", "compensation", "contract", "contracts", "different", "form", "itself", "law", "limited", "medical", "owner", "principal", "relationship", "relevant".
0.280
amounteconomyefficiencyefficientnetperformancepotentialpowerprocesspurposesourcetransportationtypework
SHARED TOKENS (14): "amount", "economy", "efficiency", "efficient", "net", "performance", "potential", "power", "process", "purpose", "source", "transportation", "type", "work".
0.260
boisecapacitydistrictidahonampanationalprogramprojectprovidetreasurevalleywaterwestern
SHARED TOKENS (13): "boise", "capacity", "district", "idaho", "nampa", "national", "program", "project", "provide", "treasure", "valley", "water", "western".
0.240
agriculturalamericanbeneficialindustriallegalmerelyownershippurposerightssourcesystemwater
SHARED TOKENS (12): "agricultural", "american", "beneficial", "industrial", "legal", "merely", "ownership", "purpose", "rights", "source", "system", "water".
0.240
abilityadministrativeauthoritydescribedexecutivepowerprocedureprocessreviewscopeseparationsubject
SHARED TOKENS (12): "ability", "administrative", "authority", "described", "executive", "power", "procedure", "process", "review", "scope", "separation", "subject".
0.240
chaindepartmentfinancialintegrationlargestmanagementplanningprocessprocurementsoftwaresupplysystems
SHARED TOKENS (12): "chain", "department", "financial", "integration", "largest", "management", "planning", "process", "procurement", "software", "supply", "systems".
0.240
associatedconstructiondevelopmentdocumentsgoalgoverningincreasinglyinformationinstitutionsmaintainspublicpublicly
SHARED TOKENS (12): "associated", "construction", "development", "documents", "goal", "governing", "increasingly", "information", "institutions", "maintains", "public", "publicly".
0.220
bidconstructioncontractsdeliverydesignentitiesmethodownerprojectseparatesubstantial
SHARED TOKENS (11): "bid", "construction", "contracts", "delivery", "design", "entities", "method", "owner", "project", "separate", "substantial".
0.220
capitalcostcostsdistributionincreaseoperatingpowerqualityreducerisksupply
SHARED TOKENS (11): "capital", "cost", "costs", "distribution", "increase", "operating", "power", "quality", "reduce", "risk", "supply".
0.220
facilitymanagementmaterialsmunicipalpointprocessprogramsolidtransfertreatmentwaste
SHARED TOKENS (11): "facility", "management", "materials", "municipal", "point", "process", "program", "solid", "transfer", "treatment", "waste".
0.220
Linked data ↗ Q515701 KW CROSS HIGH
associatedbecomedatadescribeddesigninformationmakesmethodprojectratherthem
SHARED TOKENS (11): "associated", "become", "data", "described", "design", "information", "makes", "method", "project", "rather", "them".
0.220
assetsauthoritycapabilitydatagovernancemanagementorganizationalprocessesqualityrolevalue
SHARED TOKENS (11): "assets", "authority", "capability", "data", "governance", "management", "organizational", "processes", "quality", "role", "value".
0.210
Grant ↗ Q219140 EXACT TITLE
grants
SHARED TOKENS (1): "grants". | EXACT TITLE in procurement_public_spending: "Grant". | EXACT TITLE in energy_utilities: "Grant".
0.200
EXACT TITLE in energy_utilities: "Suez (disambiguation)".
0.200
datadifferententitiesentityfilesfindingnationalrecordrecordsshape
SHARED TOKENS (10): "data", "different", "entities", "entity", "files", "finding", "national", "record", "records", "shape".
0.200
approximatelyboisedatadistrictdistrictsevenidahopopulationresidentssingle
SHARED TOKENS (10): "approximately", "boise", "data", "district", "districts", "even", "idaho", "population", "residents", "single".
0.200
Prison ↗ Q40357 KW CROSS HIGH
administrationauthoritycenterfacilityfunctionsgoverninglargelawprocesssystem
SHARED TOKENS (10): "administration", "authority", "center", "facility", "functions", "governing", "large", "law", "process", "system".
0.200
administersdepartmentdepartmentsdevelopmentdirectlyexecutivefederalhomeprogramurban
SHARED TOKENS (10): "administers", "department", "departments", "development", "directly", "executive", "federal", "home", "program", "urban".
0.200
competedistributionmajornationalprocesspublictrafficutilitywastewaterwater
SHARED TOKENS (10): "compete", "distribution", "major", "national", "process", "public", "traffic", "utility", "wastewater", "water".
0.180
Power station ↗ Q159719 KW CROSS HIGH
connectedcreatescurrentfacilityfieldgenerallyindustrialpowersource
SHARED TOKENS (9): "connected", "creates", "current", "facility", "field", "generally", "industrial", "power", "source".
0.180
agricultureconstructioncontrolcontrollingcontrolsdevelopmentlandpropertywater
SHARED TOKENS (9): "agriculture", "construction", "control", "controlling", "controls", "development", "land", "property", "water".
0.180
consultantsdeliveryinformationprivateprocessesrelationshipsoftwaretechnologyworking
SHARED TOKENS (9): "consultants", "delivery", "information", "private", "processes", "relationship", "software", "technology", "working".
0.160
adaboisecanyoncountiesidahoregiontreasurevalley
SHARED TOKENS (8): "ada", "boise", "canyon", "counties", "idaho", "region", "treasure", "valley".
0.160
Surety ↗ KW CROSS HIGH
amountcontractdebtfailurefinanceprincipalresponsibilityresulting
SHARED TOKENS (8): "amount", "contract", "debt", "failure", "finance", "principal", "responsibility", "resulting".
0.160
appropriatedeterminefinancialinformationprovidestandardsstatedtype
SHARED TOKENS (8): "appropriate", "determine", "financial", "information", "provide", "standards", "stated", "type".
0.160
administrationdemandformnetworkphysicalpoolresourcesshared
SHARED TOKENS (8): "administration", "demand", "form", "network", "physical", "pool", "resources", "shared".
0.160
approvalcontrolledfundsgenerallylawproposedsupplysystem
SHARED TOKENS (8): "approval", "controlled", "funds", "generally", "law", "proposed", "supply", "system".
0.160
capacitycategoriesdistributionpowerstructuresupportutilitywater
SHARED TOKENS (8): "capacity", "categories", "distribution", "power", "structure", "support", "utility", "water".
0.140
abilityfederalinformationlevelslocalpublicrecords
SHARED TOKENS (7): "ability", "federal", "information", "levels", "local", "public", "records".
0.140
environmentlocalmaterialsmillionnationalregulatedwaste
SHARED TOKENS (7): "environment", "local", "materials", "million", "national", "regulated", "waste".
0.140
Garden City, Idaho ↗ KW CROSS HIGH
adaboiseidahomunicipalnearlypopulationseparate
SHARED TOKENS (7): "ada", "boise", "idaho", "municipal", "nearly", "population", "separate".
0.140
completioncontractcontractorintendedperformanceprojectwork
SHARED TOKENS (7): "completion", "contract", "contractor", "intended", "performance", "project", "work".
0.140
Effluent ↗ Q1057706 KW CROSS HIGH
differentdirectlyfacilityindustrialsourcewastewastewater
SHARED TOKENS (7): "different", "directly", "facility", "industrial", "source", "waste", "wastewater".
0.120
agriculturalidaholandlargestmajormiles
SHARED TOKENS (6): "agricultural", "idaho", "land", "largest", "major", "miles".
0.120
certificationeducationalprofessionalpublicqualificationsimply
SHARED TOKENS (6): "certification", "educational", "professional", "public", "qualification", "simply".
0.100
formalprocesspublicutilitiesutility
SHARED TOKENS (5): "formal", "process", "public", "utilities", "utility".
◈ Frequently Asked Questions
Procurement Public Spending × Energy Utilities — Treasure Valley
HAIKU · HIGH GATE
How does Treasure Valley municipal procurement affect Idaho Power's infrastructure contracts?
Idaho Power competes for public works contracts through Boise and Nampa procurement processes when municipalities upgrade water supply and sanitary sewer systems tied to electrical distribution. Ada County's capital budget allocations directly determine which utility infrastructure projects move forward and which vendors—including private energy contractors—receive contracts for civil engineering and system upgrades.
What role do Boise State University and College of Western Idaho play in procurement decisions for regional energy utilities?
Both institutions influence energy utility procurement through apprenticeship programs that train workers for public utility positions, affecting labor costs in regional bids. Municipal procurement departments in the Treasure Valley often coordinate with these colleges when planning workforce development for infrastructure projects involving Idaho Power and sanitary sewer system expansions.
How do mergers and acquisitions in energy utilities impact Treasure Valley public spending budgets?
When private equity or larger utilities acquire regional energy systems serving Nampa or Ada County, the consolidated entity renegotiates municipal procurement contracts for infrastructure maintenance and water supply integration. Boise and surrounding Treasure Valley municipalities must reallocate capital budgets to accommodate new vendor pricing and service delivery models from consolidated utility operators.
Why do Treasure Valley wastewater treatment projects require coordination with Idaho Power during public procurement?
Sanitary sewer and wastewater treatment expansion in Ada County municipalities requires electrical supply upgrades that Idaho Power must provision, making utility approval a condition of procurement bids. Civil engineering firms bidding on these public works contracts must account for Idaho Power's infrastructure timeline and costs when submitting proposals to Boise or Nampa procurement offices.
◈ Provenance Chain · refinery-treasurevalley-v1.0.0
Procurement Public Spending × Energy Utilities 23 QID bridges 256 edges 6,536 ext links 2026-07-17 22:52:32 UTC e322cb99c9fcddb3
Procurement Public Spending corridor ↗ Energy Utilities corridor ↗ Energy Utilities × Procurement Public Spending ↗ boisestandard.org/standard ↗
Parent Corridors
Procurement Public Spending × All Other Verticals