nd Elmore counties, upstream of the Lucky Peak Dam and reservoir. The spillway elevation for Arrowrock is 3,219 feet (981 m) above sea level and its primary purpose is to provide irrigation water for agriculture.
The dam was designated as a National Historic Civil Engineering Landmark by the American Society of Civil Engineers in 2016, and is operated by the U.S. Bureau of Reclamation.
Preparations
In 1910, the Reclamation Service began to consider another storage facility farther east on the Boise River. After several surveys, engineers decided upon the Arrowrock site which had previously been the site of a private irrigation venture under the direction of Arthur De Wint Foote yet failed for lack of funding. The Arrowrock site is at the confluence of the main channel and the south fork. That was to be the most ambitious project to date for Reclamation. At 348 feet (106 m), Arrowrock would be the largest concrete arch dam in the world. Prior to construction, considerable preparatory work would need to be completed. As the structure was some twenty miles (32 km) upstream from the Boise River Diversion Dam, routing supplies to the worksite would be a massive undertaking unto itself. The Reclamation Service elected to construct a new rail line on the old wagon road leading north to Idaho City. The railroad would begin at the Barberton mill near the Diversion Dam and extend to through a winding canyon up to Arrowrock. Even before the dam had been approved, Reclamation began work on the rail line.
Some significant problems existed with construction of the railroad. The Barberton Lumber Company owned the road's right-of-way. That meant that the Reclamation Service needed to come to an agreement over ownership of the rail line. In an unprecedented move, the government agreed to lease the track from Barberton but run the actual locomotive. Part of this agreement stipulated that the line would remain a common carrier. That made the Arrowrock & Boise Railroad the first publicly owned line in the nation. The Service hid this fact from President William Howard Taft when it applied for the Arrowrock Dam's approval. Fortunately for Reclamation, Taft failed to recognize the loophole and in June 1910, the entire project went forward. However, when the Oregon Shortline refused to honor the pact between Barberton and Reclamation, the Arrowrock & Boise terminal was reduced to a field just outside the Barber lumberyard. On August 22, 1910, the entire deal was finalized and work began on the line to the Arrowrock site.
Salt Lake City's Manly Brothers won the contract for grading the Arrowrock & Boise road in May 1911. The government called for force account to lay the track from Barber to the work site. Although the construction was delayed several times by the shortage of railroad ties, workers finished the track in early November. By most accounts, the trip through the canyon was a very long and harrowing event. For the first several months, riders were asked to disembark at the unfinished Gooseneck Bridge while the cars were winched across one at a time.
However, once they arrived, most passengers were surprised by what they found. Not only was the view breathtaking but the "work" camp offered amenities that were unavailable to some residents of the Treasure Valley. Not only was the site fully powered, but also it provided a central heating plant, running water and an efficient sewage system. Along with the Reclamation offices, the Arrowrock camp carried a hospital, mess hall, post office, and hotel. Workers and visitors were offered lodging in the site's hotel, bunkhouses, or cottages. In addition to the outdoor recreational activities, the camp also operated a YMCA, school, and dancehall. At the peak of construction, some 1,400 people had called Arrowrock home, including some 200 families.
To provide power for the site, Reclamation retrofitted The Boise River Diversion Dam with a small powerhouse. Finished in 1912, the plant's three generators produced 1,500 kilowatts of electricity for Arrowrock's camp, sawmills, and giant cement mixers. The German made Allis-Chalmers 725 horsepower (541 kW) turbines, the first in the world to be built with a vertical shaft design. Along with the power lines, government workers hung a two-way phone cable to connect Arrowrock with the outside world. In 1976, the power plant was added to the National Register of Historic Places. After being refurbished by the Bonneville Power Administration in 2002, it is now on ready reserve status and occasionally provides surplus power during times of peak demand. Special care was made to maintain the historic qualities of the powerhouse.
Arrowrock is 3,219 feet (981 m) above sea level and its primary purpose is to provide irrigation water for agriculture.
The dam was designated as a National Historic Civil Engineering Landmark by the American Society of Civil Engineers in 2016, and is operated by the U.S. Bureau of Reclamation.
Preparations
In 1910, the Reclamation Service began to consider another storage facility farther east on the Boise River. After several surveys, engineers decided upon the Arrowrock site which had previously been the site of a private irrigation venture under the direction of Arthur De Wint Foote yet failed for lack of funding. The Arrowrock site is at the confluence of the main channel and the south fork. That was to be the most ambitious project to date for Reclamation. At 348 feet (106 m), Arrowrock would be the largest concrete arch dam in the world. Prior to construction, considerable preparatory work would need to be completed. As the structure was some twenty miles (32 km) upstream from the Boise River Diversion Dam, routing supplies to the worksite would be a massive undertaking unto itself. The Reclamation Service elected to construct a new rail line on the old wagon road leading north to Idaho City. The railroad would begin at the Barberton mill near the Diversion Dam and extend to through a winding canyon up to Arrowrock. Even before the dam had been approved, Reclamation began work on the rail line.
Some significant problems existed with construction of the railroad. The Barberton Lumber Company owned the road's right-of-way. That meant that the Reclamation Service needed to come to an agreement over ownership of the rail line. In an unprecedented move, the government agreed to lease the track from Barberton but run the actual locomotive. Part of this agreement stipulated that the line would remain a common carrier. That made the Arrowrock & Boise Railroad the first publicly owned line in the nation. The Service hid this fact from President William Howard Taft when it applied for the Arrowrock Dam's approval. Fortunately for Reclamation, Taft failed to recognize the loophole and in June 1910, the entire project went forward. However, when the Oregon Shortline refused to honor the pact between Barberton and Reclamation, the Arrowrock & Boise terminal was reduced to a field just outside the Barber lumberyard. On August 22, 1910, the entire deal was finalized and work began on the line to the Arrowrock site.
Salt Lake City's Manly Brothers won the contract for grading the Arrowrock & Boise road in May 1911. The government called for force account to lay the track from Barber to the work site. Although the construction was delayed several times by the shortage of railroad ties, workers finished the track in early November. By most accounts, the trip through the canyon was a very long and harrowing event. For the first several months, riders were asked to disembark at the unfinished Gooseneck Bridge while the cars were winched across one at a time.
However, once they arrived, most passengers were surprised by what they found. Not only was the view breathtaking but the "work" camp offered amenities that were unavailable to some residents of the Treasure Valley. Not only was the site fully powered, but also it provided a central heating plant, running water and an efficient sewage system. Along with the Reclamation offices, the Arrowrock camp carried a hospital, mess hall, post office, and hotel. Workers and visitors were offered lodging in the site's hotel, bunkhouses, or cottages. In addition to the outdoor recreational activities, the camp also operated a YMCA, school, and dancehall. At the peak of construction, some 1,400 people had called Arrowrock home, including some 200 families.
To provide power for the site, Reclamation retrofitted The Boise River Diversion Dam with a small powerhouse. Finished in 1912, the plant's three generators produced 1,500 kilowatts of electricity for Arrowrock's camp, sawmills, and giant cement mixers. The German made Allis-Chalmers 725 horsepower (541 kW) turbines, the first in the world to be built with a vertical shaft design. Along with the power lines, government workers hung a two-way phone cable to connect Arrowrock with the outside world. In 1976, the power plant was added to the National Register of Historic Places. After being refurbished by the Bonneville Power Administration in 2002, it is now on ready reserve status and occasionally provides surplus power during times of peak demand. Special care was made to maintain the historic qualities of the powerhouse.
U.S. Bureau of Reclamation Archived 2012-09-26 at the Wayback Machine - Arrowrock Dam
U.S. Bureau of Reclamation - major storage reservoirs in the Boise & Payette River basins - current levels & flows
Historic American Engineering Record (HAER) documentation, filed under Boise River, Twin Springs, Boise County, ID:
HAER No. ID-27, "Arrowrock Dam", 101 photos, 123 data pages, 11 photo caption pages
HAER No.