49 C.F.R. · Transportation
49 C.F.R. § 213.365

Visual track inspections.

Title 49 C.F.R. ● ACTIVE Primary Source
Regulatory Text

49 C.F.R. § 213.365 — Visual track inspections.

§ 213.365 Visual track inspections. (a) All track shall be visually inspected in accordance with the schedule prescribed in paragraph (c) of this section by a person designated under § 213.305. (b) Each inspection shall be made on foot or by traversing the track in a vehicle at a speed that allows the person making the inspection to visually inspect the track structure for compliance with this part. However, mechanical, electrical, and other track inspection devices may be used to supplement visual inspection. If a vehicle is used for visual inspection, the speed of the vehicle may not be more than 5 m.p.h. when traversing track crossings and turnouts; otherwise, the inspection vehicle speed shall be at the sole discretion of the inspector, based on track conditions and inspection requirements. When traversing the track in a vehicle, the inspection will be subject to the following conditions— (1) One inspector in a vehicle may inspect up to two tracks at one time provided that the inspector's visibility remains unobstructed by any cause and that the second track is not centered more than 30 feet from the track upon which the inspector traverses; (2) Two inspectors in one vehicle may inspect up to four tracks at a time provided that the inspectors' visibility remains unobstructed by any cause and that each track being inspected is centered within 39 feet from the track upon which the inspectors traverse; (3) Each main track must be traversed by a vehicle or inspected on foot at least once every two weeks, and each siding must be traversed by a vehicle or inspected on foot at least once every month; and (4) Track inspection records shall indicate which track(s) are traversed by the vehicle or inspected on foot as outlined in paragraph (b)(3) of this section. (c) Each visual track inspection shall be made in accordance with the following schedule— Table 1 to § 213.365( c ) Class of track Required frequency 6, 7, and 8 Twice weekly  1 with at least a 2 calendar day's interval between inspections. 9 Three times per week. 1  An inspection week is defined as a seven (7) day period beginning on Sunday and ending on Saturday. (d) If the § 213.305 qualified person making the inspection finds a deviation from the requirements of this part, the person shall immediately initiate remedial action. Any subsequent movements to facilitate repairs on track that is out of service must be authorized by a § 213.305 qualified person. (e) Each switch, turnout, track crossing, and lift rail assemblies on moveable bridges shall be inspected on foot at least weekly. The inspection shall be accomplished in accordance with the Guidebook required under § 213.353. (f) In track Classes 8 and 9, if no train traffic operates for a period of eight hours, a train shall be operated at a speed not to exceed 100 miles per hour over the track before the resumption of operations at the maximum authorized speed. [63 FR 34029, June 22, 1998; 63 FR 45959, Aug. 28, 1998, as amended at 85 FR 63391, Oct. 7, 2020]

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR49-SEC-0AC83E
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
49 C.F.R. § 213.365
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
65da88a9d0b805e5...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 49 C.F.R. § 213.365 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 49 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 49 49 C.F.R. § 213.365