46 C.F.R. · Shipping
46 C.F.R. § 95.17.90

Installations contracted for prior to November 19, 1952.

Title 46 C.F.R. ● ACTIVE Primary Source
Regulatory Text

46 C.F.R. § 95.17.90 — Installations contracted for prior to November 19, 1952.

§ 95.17–90 Installations contracted for prior to November 19, 1952. (a) Installations contracted for prior to November 19, 1952, shall meet the following requirements: (1) Existing arrangements, materials, and facilities previously approved shall be considered satisfactory so long as they meet the minimum requirements of this paragraph and they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs and alterations may be made to the same standards as the original installation. (2) The details of the systems shall be in general agreement with §§ 95.17–5 through 95.17–20, with the exception of § 95.17–5(a)(2), insofar as is reasonable and practicable. A 6-inch blanket of foam in 5 minutes for tanks and 3 minutes for other spaces will be considered as meeting the requirements of § 95.17–5.

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR46-SEC-BC3BB4
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
46 C.F.R. § 95.17.90
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
dc62984b0a5bee06...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 46 C.F.R. § 95.17.90 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 46 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 46 46 C.F.R. § 95.17.90