Ordinance Text
07-14-17: MINERAL EXTRACTION SHORT TERM:
(1) Setbacks:
Front | Side | Rear | Corner | |
Short term | 30' | 10' | 20' | 30' |
A. Front and corner setbacks shall be measured from the greatest of either the property line, right-of-way line, or road easement line of any local or private street.
(2) Minerals: Gravel, sand, soil or other minerals may be excavated and removed from a maximum of a two (2) acre site, per parcel. The minerals must be removed from the subject property within six (6) months from the date excavation begins. Extracted minerals may not be stored on site beyond the six (6) month time period.
(3) Processing: Crushing, screening, or processing the material is allowed on or at the excavation site at the discretion of the Director.
(4) Accessory Uses: Temporary asphalt mixing and concrete batching may only be allowed as accessory uses to a pit, mine, or quarry at the discretion of the Director.
(5) Submittals: Prior to commencing any phase of extraction, the landowner or operator/extractor shall submit all appropriate fees and provide the following to DSD:
A. Name of the landowner;
B. Name of the operator/extractor;
C. Legal description of the property where gravel is to be extracted;
D. A site plan of the property showing the area where the gravel is to be extracted;
E. The extraction commencement date and completion date (no later than 6 months after commencement date); and
F. Reclamation plan as approved by Idaho Department of Lands.
(6) Time Limit: Short term mineral extraction is allowed during the process of subdivision construction following the provisions of this section. The six (6) month time limit shall apply to extraction during each phase as shown on the approved preliminary plat.
(7) Mineral Extraction In Floodway: Gravel and sand and their subsequent extraction on lands within the special flood hazard area that encroach into regulated floodways shall meet the requirements of subsection 7-10A-11(4) of this chapter. A Reclamation LOMR shall be completed within one year of the completion of mining. (Ord. 19-038, 8-30-2019)
Source: American Legal Publishing — codelibrary.amlegal.com — public domain
Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record
boisestandard.org · municipal corpus
Federation ID
bs-aml-can-425ee35a010132a6
Doc ID
0-0-0-3600
Domain Signature
boisestandard.org
Jurisdiction
Canyon County, Idaho — United States
City
Canyon County
County
Canyon County
Publisher
American Legal Publishing
Source Verified
✓ TRUE
Navigate — Canyon County Canyon County Code of Ordinances
Nearby Sections
07-14-07: BED AND BREAKFAST (WITH OR WITHOUT 07-14-09: CONTRACTOR SHOP:07-14-11: HOME BUSINESS:07-14-13: HOME OCCUPATIONS:07-14-15: MANUFACTURING OR PROCESSING OF HAZA07-14-17: MINERAL EXTRACTION SHORT TERM:07-14-19: MINERAL EXTRACTION LONG TERM:07-14-21: MINISTORAGE FACILITY:07-14-23: ROADSIDE STAND:07-14-25: SECONDARY RESIDENCE:07-14-27: SMALL WIND ENERGY SYSTEM:07-14-29: STAGING AREA:07-14-31: VEHICLE SALES LOT:07-14-33: WIND FARM:07-14-35: PRIVATE TOWER WITH ANTENNA:
Canyon County Municipal Code — public domain
← Canyon County Code Index