42 U.S.C. · The Public Health and Welfare
42 U.S.C. § 18324

Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle

Ch. 159 — SPACE EXPLORATION, TECHNOLOGY, AND SCIENCE
Title 42 U.S.C. ● ACTIVE Primary Source Ch. 159
Statutory Text

42 U.S.C. § 18324 — Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle

U.S.C. Title 42 - THE PUBLIC HEALTH AND WELFARE 42 U.S.C. United States Code, 2023 Edition Title 42 - THE PUBLIC HEALTH AND WELFARE CHAPTER 159 - SPACE EXPLORATION, TECHNOLOGY, AND SCIENCE SUBCHAPTER II - EXPANSION OF HUMAN SPACE FLIGHT BEYOND THE INTERNATIONAL SPACE STATION AND LOW-EARTH ORBIT Sec. 18324 - Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle From the U.S. Government Publishing Office, www.gpo.gov

§18324. Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle

(a) In general In developing the Space Launch System pursuant to section 18322 of this title and the multi-purpose crew vehicle pursuant to section 18323 of this title, the Administrator shall, to the extent practicable utilize— (1) existing contracts, investments, workforce, industrial base, and capabilities from the Space Shuttle and Orion and Ares 1 projects, including— (A) space-suit development activities for application to, and coordinated development of, a multi-purpose crew vehicle suit and associated life-support requirements with potential development of standard NASA-certified suit and life support systems for use in alternative commercially-developed crew transportation systems; and (B) Space Shuttle-derived components and Ares 1 components that use existing United States propulsion systems, including liquid fuel engines, external tank or tank-related capability, and solid rocket motor engines; and

(2) associated testing facilities, either in being or under construction as of October 11, 2010. (b) Discharge of requirements In meeting the requirements of subsection (a), the Administrator— (1) shall, to the extent practicable, utilize ground-based manufacturing capability, ground testing activities, launch and operations infrastructure, and workforce expertise; (2) shall, to the extent practicable, minimize the modification and development of ground infrastructure and maximize the utilization of existing software, vehicle, and mission operations processes; (3) shall complete construction and activation of the A–3 test stand with a completion goal of September 30, 2013; (4) may procure, develop, and flight test applicable components; and (5) shall take appropriate actions to ensure timely and cost-effective development of the Space Launch System and the multi-purpose crew vehicle, including the use of a procurement approach that incorporates adequate and effective oversight, the facilitation of contractor efficiencies, and the stream-lining of contract and procurement requirements.

(Pub. L. 111–267, title III, §304, Oct. 11, 2010, 124 Stat. 2816.)

Source: uscode.house.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-USC42-SEC-D62751
Entity Class
STATUTE / FEDERAL-CODE-SECTION
Domain Signature
boisestandard.org
Citation
42 U.S.C. § 18324
Jurisdiction
Federal — United States
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
b52632fafed68d7a...
Semantic Edges
Pending — corpus passes queued
The statutory text of 42 U.S.C. § 18324 is reproduced from the official United States Code as published by the Office of the Law Revision Counsel of the U.S. House of Representatives (uscode.house.gov).
Navigate Corpus — Title 42
◈ Provenance
boisestandard.org United States Law U.S. Code Title 42 42 U.S.C. § 18324