33 U.S.C. · Navigation and Navigable Waters
33 U.S.C. § 2282f

Review of resiliency assessments

Ch. 36 — WATER RESOURCES DEVELOPMENT
Title 33 U.S.C. ● ACTIVE Primary Source Ch. 36
Statutory Text

33 U.S.C. § 2282f — Review of resiliency assessments

U.S.C. Title 33 - NAVIGATION AND NAVIGABLE WATERS 33 U.S.C. United States Code, 2023 Edition Title 33 - NAVIGATION AND NAVIGABLE WATERS CHAPTER 36 - WATER RESOURCES DEVELOPMENT SUBCHAPTER V - GENERAL PROVISIONS Sec. 2282f - Review of resiliency assessments From the U.S. Government Publishing Office, www.gpo.gov

§2282f. Review of resiliency assessments

(a) Resiliency assessment (1) In general Not later than 180 days after December 27, 2020, and in conjunction with the development of procedures under section 1962–4 of title 42, the Secretary is directed to review, and where appropriate, revise the existing planning guidance documents and regulations of the Corps of Engineers on the assessment of the effects of sea level rise or inland flooding on future water resources development projects to ensure that such guidance documents and regulations are based on the best available, peer-reviewed science and data on the current and future effects of sea level rise or inland flooding on relevant communities. (2) Coordination In carrying out this subsection, the Secretary shall— (A) coordinate the review with the Engineer Research and Development Center, other Federal and State agencies, and other relevant entities; and (B) to the maximum extent practicable and where appropriate, utilize data provided to the Secretary by such agencies. (b) Assessment of benefits from addressing sea level rise and inland flooding resiliency in feasibility reports (1) In general Upon the request of a non-Federal interest, in carrying out a feasibility study for a project for flood risk mitigation, hurricane and storm damage risk reduction, or ecosystem restoration under section 2282 of this title, the Secretary shall consider whether the need for the project is predicated upon or exacerbated by conditions related to sea level rise or inland flooding. (2) Addressing sea level rise and inland flooding resiliency benefits To the maximum extent practicable, in carrying out a study pursuant to paragraph (1), the Secretary shall document the potential effects of sea level rise or inland flooding on the project, and the expected benefits of the project relating to sea level rise or inland flooding, during the 50-year period after the date of completion of the project.

(Pub. L. 116–260, div. AA, title I, §113, Dec. 27, 2020, 134 Stat. 2626.)

Editorial Notes

Codification Section was enacted as part of the Water Resources Development Act of 2020, and not as part of the Water Resources Development Act of 1986 which comprises this chapter.

Statutory Notes and Related Subsidiaries

"Secretary" Defined Secretary means the Secretary of the Army, see section 2 of div. AA of Pub. L. 116–260, set out as a note under section 2201 of this title.

Source: uscode.house.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-USC33-SEC-93CDC9
Entity Class
STATUTE / FEDERAL-CODE-SECTION
Domain Signature
boisestandard.org
Citation
33 U.S.C. § 2282f
Jurisdiction
Federal — United States
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
98e504d2df820d3f...
Semantic Edges
Pending — corpus passes queued
The statutory text of 33 U.S.C. § 2282f is reproduced from the official United States Code as published by the Office of the Law Revision Counsel of the U.S. House of Representatives (uscode.house.gov).
Navigate Corpus — Title 33
◈ Provenance
boisestandard.org United States Law U.S. Code Title 33 33 U.S.C. § 2282f