48 C.F.R. · Federal Acquisition Regulations System
48 C.F.R. § 48.104.1

Determining sharing period.

Title 48 C.F.R. ● ACTIVE Primary Source
Regulatory Text

48 C.F.R. § 48.104.1 — Determining sharing period.

Federal Acquisition Regulations System 1 2023-10-01 2023-10-01 false Determining sharing period. 48.104-1 Section 48.104-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT VALUE ENGINEERING Policies and Procedures 48.104–1 Determining sharing period. (a) Contracting officers must determine discrete sharing periods for each VECP. If more than one VECP is incorporated into a contract, the sharing period for each VECP need not be identical. (b) The sharing period begins with acceptance of the first unit incorporating the VECP. Except as provided in paragraph (c) of this section, the end of the sharing period is a specific calendar date that is the later of— (1) 36 to 60 consecutive months (set at the discretion of the contracting officer for each VECP) after the first unit affected by the VECP is accepted; or (2) The last scheduled delivery date of an item affected by the VECP under the instant contract delivery schedule in effect at the time the VECP is accepted. (c) For engineering-development contracts and contracts containing low-rate-initial-production or early production units, the end of the sharing period is based not on a calendar date, but on acceptance of a specified quantity of future contract units. This quantity is the number of units affected by the VECP that are scheduled to be delivered over a period of between 36 and 60 consecutive months (set at the discretion of the contracting officer for each VECP) that spans the highest planned production, based on planning and programming or production documentation at the time the VECP is accepted. The specified quantity begins with the first future contract unit affected by the VECP and continues over consecutive deliveries until the sharing period ends at acceptance of the last of the specified quantity of units. (d) For contracts (other than those in paragraph (c) of this subsection) for items requiring a prolonged production schedule ( e.g., ship construction, major system acquisition), the end of the sharing period is determined according to paragraph (b) of this subsection. Agencies may prescribe sharing of future contract savings on all future contract units to be delivered under contracts awarded within the sharing period for essentially the same item, even if the scheduled delivery date is outside the sharing period. [64 FR 51847, Sept. 24, 1999]

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR48-SEC-36EE89
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
48 C.F.R. § 48.104.1
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
14f841e61b2327ba...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 48 C.F.R. § 48.104.1 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 48 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 48 48 C.F.R. § 48.104.1