48 C.F.R. · Federal Acquisition Regulations System
48 C.F.R. § 47.303.6

F.o.b. destination.

Title 48 C.F.R. ● ACTIVE Primary Source
Regulatory Text

48 C.F.R. § 47.303.6 — F.o.b. destination.

Federal Acquisition Regulations System 1 2023-10-01 2023-10-01 false F.o.b. destination. 47.303-6 Section 47.303-6 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.303–6 F.o.b. destination. (a) Explanation of delivery term. F.o.b. destination means— (1) Free of expense to the Government delivered, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and (2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or constructive placement as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including “piggyback”) is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for “heavy or bulky freight.” When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarder for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery when required, if transfer to truck is required to complete delivery to consignee. (b) Contractor responsibilities. The contractor shall— (1)(i) Pack and mark the shipment to comply with contract specifications; or (ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements; (2) Prepare and distribute commercial bills of lading; (3) Deliver the shipment in good order and condition to the point of delivery specified in the contract; (4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract; (5) Furnish a delivery schedule and designate the mode of delivering carrier; and (6) Pay and bear all charges to the specified point of delivery. (c) Contract clause. The contracting officer shall insert in solicitations and contracts the clause at 52.247–34, F.o.b. Destination, when the delivery term is f.o.b. destination. [48 FR 42424 Sept. 19, 1983, as amended at 55 FR 52796, Dec. 21, 1990]

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR48-SEC-F93A06
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
48 C.F.R. § 47.303.6
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
a586fcea61e28949...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 48 C.F.R. § 47.303.6 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 48 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 48 48 C.F.R. § 47.303.6