48 C.F.R. · Federal Acquisition Regulations System
48 C.F.R. § 36.214

Special procedures for price negotiation in construction contracting.

Title 48 C.F.R. ● ACTIVE Primary Source
Regulatory Text

48 C.F.R. § 36.214 — Special procedures for price negotiation in construction contracting.

Federal Acquisition Regulations System 1 2023-10-01 2023-10-01 false Special procedures for price negotiation in construction contracting. 36.214 Section 36.214 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.214 Special procedures for price negotiation in construction contracting. (a) Agencies shall follow the policies and procedures in part 15 when negotiating prices for construction. (b) The contracting officer shall evaluate proposals and associated certified cost or pricing data and data other than certified cost or pricing data and shall compare them to the Government estimate. (1) When submission of certified cost or pricing data is not required (see 15.403–1 and 15.403–2), and any element of proposed cost differs significantly from the Government estimate, the contracting officer should request the offeror to submit cost information concerning that element (e.g., wage rates or fringe benefits, significant materials, equipment allowances, and subcontractor costs). (2) When a proposed price is significantly lower than the Government estimate, the contracting officer shall make sure both the offeror and the Government estimator completely understand the scope of the work. If negotiations reveal errors in the Government estimate, the estimate shall be corrected and the changes shall be documented in the contract file. (c) When appropriate, additional pricing tools may be used. For example, proposed prices may be compared to current prices for similar types of work, adjusted for differences in the work site and the specifications. Also, rough yardsticks may be developed and used, such as cost per cubic foot for structures, cost per linear foot for utilities, and cost per cubic yard for excavation or concrete. [48 FR 42356, Sept. 19, 1983, as amended at 53 FR 34228, Sept. 2, 1988; 60 FR 48218, Sept. 18, 1995. Redesignated at 62 FR 272, Jan. 2, 1997, as amended at 62 FR 51271, Sept. 30, 1997; 75 FR 53149, Aug. 30, 2010]

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR48-SEC-79734B
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
48 C.F.R. § 36.214
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
3338396424040301...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 48 C.F.R. § 36.214 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 48 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 48 48 C.F.R. § 36.214