What criteria will Reclamation apply to determine whether it is appropriate to recommend that a feasibility study be conducted?

Title 43 C.F.R. ● ACTIVE Primary Source
Regulatory Text

43 C.F.R. § 404.44 — What criteria will Reclamation apply to determine whether it is appropriate to recommend that a feasibility study be conducted?

§ 404.44 What criteria will Reclamation apply to determine whether it is appropriate to recommend that a feasibility study be conducted? In reviewing an appraisal investigation, Reclamation will apply the following criteria to determine whether at least one of the alternatives identified is appropriate for further analysis through a feasibility study, or whether the investigation should be terminated without conducting a feasibility study, including: (a) Whether a reasonable range of alternatives (structural or non-structural) have been formulated and evaluated; (b) Whether the recommendation for further study of one or more alternatives is clearly supported by the analysis in the appraisal investigation; and (c) For each alternative considered in the investigation, whether the alternative: (1) Identifies viable water supplies and water rights sufficient to supply the proposed service area, including all practicable water sources such as lower quality waters, non-potable waters, and water-reuse-based water supplies; (2) Has a positive effect on public and health and safety; (3) Will meet water demand, including projected future needs; (4) Provides environmental benefits, including source water protection; (5) Applies a regional or watershed perspective and promotes benefits in the region in which the project is carried out; (6) Implements an integrated water resources management approach; (7) Enhances water management flexibility, including providing for local control of water supplies and, where applicable, encouraging participation in water banking and markets; (8) Promotes long-term protection of water supplies; (9) Includes preliminary cost estimates that are reasonable and supported; (10) Is cost-effective and generates national net economic benefits as required under the Principles and Guidelines (incorporated by reference at § 404.4); (11) For each alternative proposed for further evaluation in a feasibility study, whether the project sponsor has the capability to pay 100 percent of the costs associated with the operation, maintenance, and replacement of the facilities constructed or developed; and (12) Other factors that Reclamation deems appropriate.

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR43-SEC-AF295D
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
43 C.F.R. § 404.44
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
f4e7187604a46c3e...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 43 C.F.R. § 404.44 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 43 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 43 43 C.F.R. § 404.44