43 C.F.R. · Public Lands: Interior
43 C.F.R. § 3176.9

Production requirements.

Title 43 C.F.R. ● ACTIVE Primary Source
Regulatory Text

43 C.F.R. § 3176.9 — Production requirements.

§ 3176.9 Production requirements. (a) General. (1) All existing production facilities which do not currently meet the requirements and minimum standards set forth in this section shall be brought into conformance within 1 year after January 22, 1991. All existing equipment that is in a safe working condition as of January 22, 1991, is specifically exempt from the metallurgical requirements prescribed in paragraph (c)(7) of this section. Table 1 to § 3176.9 (a)(1) Violation Corrective action Normal abatement period Minor Bring facility into compliance 60 days. (2) Production facilities constructed after January 22, 1991, shall be designed, constructed, and operated to meet the requirements and minimum standards set forth in this section. Any variations from the standards or established time frames shall be approved by the authorized officer in accordance with the provisions of § 3176.10. Except for storage tanks, a determination of the radius of exposure for all production facilities shall be made in the manner prescribed in § 3176.4. Table 2 to § 3176.9 (a)(2) Violation Corrective action Normal abatement period Minor Bring facility into compliance 60 days. (3) At any production facility or storage tank(s) where the sustained ambient H 2 S concentration is in excess of 10 ppm at 50 feet from the production facility or storage tank(s) as measured at ground level under calm (1 mph) conditions, the operator shall collect or reduce vapors from the system and they shall be sold, beneficially used, reinjected, or flared provided terrain and conditions permit. Table 3 to § 3176.9 (a)(3) Violation Corrective action Normal abatement period Major, if the authorized officer determines that a health or safety problem to the public is imminent, otherwise minor Bring facility into compliance 3 days for major, 30 days for minor. (b) Storage tanks. Storage tanks containing produced fluids and utilized as part of a production operation and operated at or near atmospheric pressure, where the vapor accumulation has an H 2 S concentration in excess of 500 ppm in the tank, shall be subject to the following: (1) No determination of a radius of exposure need be made for storage tanks. (2) All stairs/ladders leading to the top of storage tanks shall be chained and/or marked to restrict entry. For any storage, tank(s) which require fencing (see paragraph (b)(6) of this section), a danger sign posted at the gate(s) shall suffice in lieu of this requirement. Table 4 to § 3176.9 (b)(2) Violation Corrective action Normal abatement period Minor Chain or mark stair(s)/ladder(s) or post sign, as necessary 5 to 20 days. (3) A danger sign shall be posted on or within 50 feet of the storage tank(s) to alert the public of the potential H 2 S danger. For any storage tank(s) which require fencing (see paragraph (b)(6) of this section), a danger sign posted at the locked gate(s) shall suffice in lieu of this requirement. Table 5 to § 3176.9 (b)(3) Violation Corrective action Normal abatement period Minor Post or move sign(s), as necessary 5 to 20 days. (4) The sign(s) shall be painted in high-visibility red, black, and white. The sign(s) shall read: “DANGER—POISON GAS—HYDROGEN SULFIDE” or equivalent language if approved by the authorized officer. Where appropriate, bilingual or multilingual warning signs shall be used. Table 6 to § 3176.9 (b)(4) Violation Corrective action Normal abatement period Minor Post, move, replace, or alter sign(s), as necessary 20 to 40 days. (5) At least 1 permanent wind direction indicator shall be installed so that wind direction can be easily determined at or approaching the storage tank(s). Table 7 to § 3176.9 (b)(5) Violation Corrective action Normal abatement period Minor Install, repair, or replace wind direction indicator, as necessary 20 to 40 days. (6) A minimum 5-foot chain-link, 5-strand barbed wire, or comparable type fence and gate(s) that restrict(s) public access shall be required when storage tanks are located within 1/4 mile of or contained inside a city or incorporated limits of a town or within 1/4 mile of an occupied residence, school, church, park, playground, school bus stop, place of business, or where the public could reasonably be expected to frequent. Table 8 to § 3176.9 (b)(6) Violation Corrective action Normal abatement period Minor Install, repair, or replace fence and/or gate(s), as necessary 20 to 40 days. (7) Gate(s), as required by paragraph (b)(6) of this section, shall be locked when unattended by the operator. Table 9 to § 3176.9 (b)(7) Violation Corrective action Normal abatement period Minor Lock gate 24 hours. (c) Production facilities. Production facilities containing 100 ppm or more of H 2 S in the gas stream shall be subject to the following: (1) Danger signs as specified in paragraph (b)(4) of this section shall be posted on or within 50 feet of each production facility to alert the public of the potential H 2 S danger. In the event the storage tanks and production facilities are located at the same site, 1 such danger sign shall suffice. Further, for any facilities which require fencing (paragraph (b)(6) of this section), 1 such danger sign at the gate(s) shall suffice in lieu of this requirement. Table 10 to § 3176.9 (c)(1) Violation Corrective action Normal abatement period Minor Post, move, or alter sign(s), as necessary 5 to 20 days. (2) Danger signs, as specified in paragraph (b)(4) of this section, shall be required for well flowlines and lease gathering lines that carry H 2 S gas. Placement shall be where said lines cross public or lease roads. The signs shall be legible and shall contain sufficient additional information to permit a determination of the owner of the line. Table 11 to § 3176.9 (c)(2) Violation Corrective action Normal abatement period Minor Post, move, or alter sign(s), as necessary 5 to 20 days. (3) Fencing and gate(s), as specified in paragraph (b)(6) of this section, shall be required when production facilities are located within 1/4 mile of or contained inside a city or incorporated limits of a town or within 1/4 mile of an occupied residence, school, church, park, playground, school bus stop, place of business, or any other area where the public could reasonably be expected to frequent. Flowlines are exempted from this additional fencing requirement. Table 12 to § 3176.9 (c)(3) Violation Corrective action Normal abatement period Minor Install, repair, or replace fence, and/or gate(s), as necessary 20 to 40 days. (4) Gate(s), as required by paragraph (c)(3) of this section, shall be locked when unattended by the operator. Table 13 to § 3176.9 (c)(4) Violation Corrective action Normal abatement period Minor Lock gate 24 hours. (5) Wind direction indicator(s) as specified in paragraph (b)(5) of this section shall be required. In the event the storage tanks and production facilities are located at the same site, 1 such indicator shall suffice. Flowlines are exempt from this requirement. Table 14 to § 3176.9 (c)(5) Violation Corrective action Normal abatement period Minor Install, repair, or replace wind direction indicator(s), as necessary 20 to 40 days. (6) All wells, unless produced by artificial lift, shall possess a secondary means of immediate well control through the use of appropriate christmas tree and/or downhole completion equipment. Such equipment shall allow downhole accessibility (reentry) under pressure for permanent well control operations. If the applicability criteria stated in § 3176.7(a) are met, a minimum of 2 master valves shall be installed. Table 15 to § 3176.9 (c)(6) Violation Corrective action Normal abatement period Minor Install, repair, or replace equipment, as necessary 20 to 40 days. (7) All equipment shall be chosen with consideration for both the H 2 S working environment and anticipated stresses. NACE MR 0175–2021 (incorporated by reference, see § 3176.11) shall be used for metallic equipment selection and, if applicable, adequate protection by chemical inhibition or other such method that controls or limits the corrosive effects of H 2 S shall be used. (The use of NACE MR 0175–90 through NACE MR 0175–2021 is deemed to comply with the requirements of this paragraph (c)(7).) Table 16 to § 3176.9 (c)(7) Violation Corrective action Normal abatement period Minor Install, repair, or replace equipment, as necessary 20 to 40 days. (8) Where the 100 ppm radius of exposure for H 2 S includes any occupied residence, place of business, school, or other inhabited structure or any area where the public may reasonably be expected to frequent, the operator shall install automatic safety valves or shutdowns at the wellhead, or other appropriate shut-in controls for wells equipped with artificial lift. Table 17 to § 3176.9 (c)(8) Violation Corrective action Normal abatement period Minor Install, repair, or replace equipment, as necessary 20 to 40 days. (9) The automatic safety valves or shutdowns, as required by paragraph (c)(8) of this section, shall be set to activate upon a release of a potentially hazardous volume of H 2 S. Table 18 to § 3176.9 (c)(9) Violation Corrective action Normal abatement period Major Repair, replace or adjust equipment, as necessary Prompt correction required. (10) If the sustained ambient concentration of H 2 S or SO 2 from a production facility which is venting or flaring reaches a concentration of H 2 S (10 ppm) or SO 2 (2 ppm), respectively, at any of the following locations, the operator shall modify the production facility as approved by the authorized officer. The locations include any occupied residence, school, church, park, playground, school bus stop, place of business, or other areas where the public could reasonably be expected to frequent. Table 19 to § 3176.9 (c)(10) Violation Corrective action Normal abatement period Major Repair facility to bring into compliance. Prompt correction required (d) Public protection. When conditions as defined in § 3176.7(a) exist, a Public Protection Plan for producing operations shall be submitted to the authorized officer in accordance with § 3176.7(b)(1) which includes the provisions of § 3176.7(b)(2). Table 20 to § 3176.9 (d) Violation Corrective action Normal abatement period Minor Submit Public Protection Plan 20 to 40 days.

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR43-SEC-4BDB53
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
43 C.F.R. § 3176.9
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
4112eb7eb9c6f9c9...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 43 C.F.R. § 3176.9 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 43 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 43 43 C.F.R. § 3176.9