33 C.F.R. · Navigation and Navigable Waters
33 C.F.R. § 149.615

What construction drawings and specifications are required?

Title 33 C.F.R. ● ACTIVE Primary Source
Regulatory Text

33 C.F.R. § 149.615 — What construction drawings and specifications are required?

§ 149.615 What construction drawings and specifications are required? (a) To show compliance with the Act and this subchapter, the licensee must submit to the Commandant (CG-5P) or accepted Certifying Entity (CE) at least three copies of: (1) Each construction drawing and specification; and (2) Each revision to a drawing and specification. (b) Each drawing, specification, and revision under paragraph (a) of this section must bear the seal, or a facsimile imprint of the seal, of the registered professional engineer responsible for the accuracy and adequacy of the material. (c) Each drawing must identify the baseline design standard used as the basis for design. [USCG-1998-3884, 71 FR 57651, Sept. 29, 2006, as amended by USCG-2013-0397, 78 FR 39180, July 1, 2013]

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR33-SEC-CE5B9C
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
33 C.F.R. § 149.615
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
dae50991288d0cb2...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 33 C.F.R. § 149.615 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 33 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 33 33 C.F.R. § 149.615