33 C.F.R. · Navigation and Navigable Waters
33 C.F.R. § 117.9

Delaying opening of a draw.

Title 33 C.F.R. ● ACTIVE Primary Source
Regulatory Text

33 C.F.R. § 117.9 — Delaying opening of a draw.

§ 117.9 Delaying opening of a draw. No person shall unreasonably delay the opening of a draw after the signals required by § 117.15 have been given. Note: Trains are usually controlled by the block method. That is, the track is divided into blocks or segments of a mile or more in length. When a train is in a block with a drawbridge, the draw may not be able to open until the train has passed out of the block and the yardmaster or other manager has “unlocked” the drawbridge controls. The maximum time permitted for delay is defined in Subpart B for each affected bridge. Land and water traffic should pass over or through the draw as soon as possible in order to prevent unnecessary delays in the opening and closure of the draw.

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR33-SEC-6ECFCA
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
33 C.F.R. § 117.9
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
b19e25d506594027...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 33 C.F.R. § 117.9 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 33 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 33 33 C.F.R. § 117.9