33 C.F.R. · Navigation and Navigable Waters
33 C.F.R. § 117.224

Thames River.

Title 33 C.F.R. ● ACTIVE Primary Source
Regulatory Text

33 C.F.R. § 117.224 — Thames River.

§ 117.224 Thames River. The draw of the Amtrak Bridge, mile 3.0, at New London, shall operate as follows: (a) The draw shall open on signal to 75 feet above mean high water for all vessel traffic unless a full bridge opening to 135.3 feet above mean high water is requested. (b) The 75 foot opening will be signified by a range light display with one solid green light and one flashing green light and the full 135.3 foot opening will be signified with two solid green range lights. (c) The draw shall open on signal for public vessels of the United States and commercial vessels; except that, when a train scheduled to cross the bridge without stopping has passed the Midway, Groton, or New London stations and is in motion toward the bridge, the lift span shall not be opened until the train has crossed the bridge. (d) The draw shall open on signal as soon as practicable for all other vessel traffic but no later than 20 minutes after the signal to open is given. [USCG–2013–0983, 80 FR 4, Jan. 2, 2015]

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR33-SEC-FDFC5E
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
33 C.F.R. § 117.224
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
caab4213c5f25374...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 33 C.F.R. § 117.224 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 33 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 33 33 C.F.R. § 117.224