30 C.F.R. · Mineral Resources
30 C.F.R. § 77.216.1

Water, sediment or slurry impoundments and impounding structures; identification.

Title 30 C.F.R. ● ACTIVE Primary Source
Regulatory Text

30 C.F.R. § 77.216.1 — Water, sediment or slurry impoundments and impounding structures; identification.

§ 77.216–1 Water, sediment or slurry impoundments and impounding structures; identification. A permanent identification marker, at least six feet high and showing the identification number of the impounding structure as assigned by the District Manager, the name associated with the impounding structure and name of the person owning, operating, or controlling the structure, shall be located on or immediately adjacent to each water, sediment or slurry impounding structure within the time specified in paragraph (a) or (b) of this section as applicable. (a) For existing water, sediment or slurry impounding structures, markers shall be placed before May 1, 1976. (b) For new or proposed water, sediment, or slurry impounding structures, markers shall be placed within 30 days from the start of construction. (Secs. 101, 508, Pub. L. 91–173, 83 Stat. 745, 803 (30 U.S.C. 811, 957)) [40 FR 41777, Sept. 9, 1975]

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR30-SEC-B7201C
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
30 C.F.R. § 77.216.1
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
03ca9eaff5dda31e...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 30 C.F.R. § 77.216.1 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 30 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 30 30 C.F.R. § 77.216.1