30 C.F.R. · Mineral Resources
30 C.F.R. § 7.66

Output energy test.

Title 30 C.F.R. ● ACTIVE Primary Source
Regulatory Text

30 C.F.R. § 7.66 — Output energy test.

§ 7.66 Output energy test. (a) Test procedures. The blasting unit shall be tested by firing into each of the following resistive loads, within a tolerance of ±1%: (1) The maximum blasting circuit resistance. (2) Any resistive load between 3 ohms and the maximum blasting circuit resistance. (3) One ohm. (b) Acceptable performance. (1) The voltage shall be zero at the firing line terminals 10 milliseconds after operation of the firing switch. (2) The electric current from the blasting unit shall be: (i) Less than 50 milliamperes except during firing of the blasting unit. (ii) Available only through the firing line terminals. (iii) At least an average of 2 amperes during the first 5 milliseconds following operation of the firing switch. (iv) Not exceed an average of 100 amperes during the first 10 milliseconds following operation of the firing switch.

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR30-SEC-27FFF7
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
30 C.F.R. § 7.66
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
0d309ae02fb816cc...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 30 C.F.R. § 7.66 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 30 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 30 30 C.F.R. § 7.66