30 C.F.R. · Mineral Resources
30 C.F.R. § 57.6407

Circuit testing.

Title 30 C.F.R. ● ACTIVE Primary Source
Regulatory Text

30 C.F.R. § 57.6407 — Circuit testing.

§ 57.6407 Circuit testing. A blasting galvanometer or other instrument designed for testing blasting circuits shall be used to test the following: (a) In surface operations— (1) Continuity of each electric detonator in the blasthole prior to stemming and connection to the blasting line; (2) Resistance of individual series or the resistance of multiple balanced series to be connected in parallel prior to their connection to the blasting line; (3) Continuity of blasting lines prior to the connection of electric or electronic detonator series; and (4) Total blasting circuit resistance prior to connection to the power source. (b) In underground operations— (1) Continuity of each electric detonator series; and (2) Continuity of blasting lines prior to the connection of electric or electronic detonators. [61 FR 36801, July 12, 1996, as amended at 85 FR 2027, Jan. 14, 2020] Nonelectric Blasting—Surface and Underground

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR30-SEC-00CB1A
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
30 C.F.R. § 57.6407
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
2bc584b2f3b39e4d...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 30 C.F.R. § 57.6407 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 30 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 30 30 C.F.R. § 57.6407