30 C.F.R. · Mineral Resources
30 C.F.R. § 56.6407

Circuit testing.

Title 30 C.F.R. ● ACTIVE Primary Source
Regulatory Text

30 C.F.R. § 56.6407 — Circuit testing.

§ 56.6407 Circuit testing. A blasting galvanometer or other instrument designed for testing blasting circuits shall be used to test each of the following: (a) Continuity of each electric or electronic detonator in the blasthole prior to stemming and connection to the blasting line. (b) Resistance of individual series or the resistance of multiple balanced series to be connected in parallel prior to their connection to the blasting line. (c) Continuity of blasting lines prior to the connection of electric or electronic detonator series. (d) Total blasting circuit resistance prior to connection to the power source. [61 FR 36795, July 12, 1996, as amended at 85 FR 2027, Jan. 14, 2020] Nonelectric Blasting

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR30-SEC-456B54
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
30 C.F.R. § 56.6407
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
1bc9544f9b8fac20...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 30 C.F.R. § 56.6407 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 30 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 30 30 C.F.R. § 56.6407