30 C.F.R. · Mineral Resources
30 C.F.R. § 18.80

Approval of machines assembled with certified or explosion-proof components.

Title 30 C.F.R. ● ACTIVE Primary Source
Regulatory Text

30 C.F.R. § 18.80 — Approval of machines assembled with certified or explosion-proof components.

§ 18.80 Approval of machines assembled with certified or explosion-proof components. (a) A machine may be a new assembly, or a machine rebuilt to perform a service that is different from the original function, or a machine converted from nonpermissible to permissible status, or a machine converted from direct- to alternating-current power or vice versa. Properly identified components that have been investigated and accepted for application on approved machines will be accepted in lieu of certified components. (b) A single layout drawing (see Figure 1 in Appendix II) or photographs will be acceptable to identify a machine that was assembled with certified or explosion-proof components. The following information shall be furnished: (1) Overall dimensions. (2) Wiring diagram. (3) List of all components (see Figure 2 in Appendix II) identifying each according to its certification number or the approval number of the machine of which the component was a part. (4) Specifications for: (i) Overcurrent protection of motors. (ii) All wiring between components, including mechanical protection such as hose conduits and clamps. (iii) Portable cable, including the type, length, outside diameter, and number and size of conductors. (iv) Insulated strain clamp for machine end of portable cable. (v) Short-circuit protection to be provided at outby end of portable cable. (c) MSHA reserves the right to inspect and to retest any component(s) that had been in previous service, as it deems appropriate. (d) When MSHA has determined that all applicable requirements of this part have been met, the applicant will be authorized to attach an approval plate to each machine that is built in strict accordance with the drawings and specifications filed with MSHA and listed with MSHA's formal approval. A design of the approval plate will accompany the notification of approval. (Refer to §§ 18.10 and 18.11.) (e) Approvals are issued only by the U.S. Department of Labor, Mine Safety and Health Administration, Approval and Certification Center, 765 Technology Drive, Triadelphia, WV 26059. [33 FR 4660, Mar. 19, 1968, as amended at 43 FR 12314, Mar. 24, 1978; 52 FR 17514, May 8, 1987; 73 FR 52211, Sept. 9, 2008]

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR30-SEC-3E4635
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
30 C.F.R. § 18.80
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
dcec7b9084508d22...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 30 C.F.R. § 18.80 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 30 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 30 30 C.F.R. § 18.80