18 C.F.R. · Conservation of Power and Water Resources
18 C.F.R. § 32.2

Required exhibits.

Title 18 C.F.R. ● ACTIVE Primary Source
Regulatory Text

18 C.F.R. § 32.2 — Required exhibits.

§ 32.2 Required exhibits. There shall be filed with the application and as a part thereof the following exhibits: Exhibit A. Statement of the estimated capital cost of all facilities required to establish the connection, and the estimated annual cost of operating such facilities. Exhibit B. A general or key map on a scale not greater than 20 miles to the inch showing, in separate colors, the territory served by each utility, and the location of the facilities used for the generation and transmission of electric energy, indicating on said map the points between which connection may be established most economically.

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR18-SEC-9525B6
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
18 C.F.R. § 32.2
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
840d546ad5e88b89...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 18 C.F.R. § 32.2 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 18 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 18 18 C.F.R. § 32.2