18 C.F.R. · Conservation of Power and Water Resources
18 C.F.R. § 12.37

Comprehensive assessment.

Title 18 C.F.R. ● ACTIVE Primary Source
Regulatory Text

18 C.F.R. § 12.37 — Comprehensive assessment.

§ 12.37 Comprehensive assessment. A comprehensive assessment must include: (a) Review of prior reports and analyses of record. The independent consultant team must review and consider all relevant reports on the safety of the development made by or written under the direction of Federal or state agencies, submitted under Commission regulations, or made by other consultants. The licensee must provide to the independent consultant team all information, reports, and analyses of record necessary to fulfill the requirements of this section. (1) In addition to the requirements of § 12.35(a), the independent consultant team must have a full understanding of the risk associated with the project works. (2) The independent consultant team shall perform a detailed review of the as-built drawings; monitoring data; and the methods, assumptions, calculations, results, and conclusions of the analyses of record pertaining to: (i) Geology and seismicity; (ii) Hydrology and hydraulics; (iii) Stability and structural integrity of project works; and (iv) Any other analyses relevant to the safety, stability, and operation of project works. (b) Physical field inspection. The independent consultant team must perform a physical field inspection that complies with § 12.35(b). (c) Review of surveillance and monitoring plan and data. The independent consultant team must perform a review of surveillance and monitoring plan and data that complies with § 12.35(c). (d) Review of dam and public safety programs. The independent consultant team must perform a review of dam and public safety programs that complies with § 12.35(d). (e) Supporting Technical Information Document. The comprehensive assessment shall include a review of the Supporting Technical Information Document. (f) Potential failure mode analysis. The comprehensive assessment shall include a potential failure mode analysis. (g) Risk analysis. The comprehensive assessment shall include a risk analysis. The Regional Engineer may, for good cause shown, grant a waiver of the requirement to complete a risk analysis. Any petition for waiver under this paragraph must be filed in accordance with § 385.207 of this chapter.

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR18-SEC-F50B3A
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
18 C.F.R. § 12.37
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
97b406ea1f86e496...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 18 C.F.R. § 12.37 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 18 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 18 18 C.F.R. § 12.37