14 C.F.R. · Aeronautics and Space
14 C.F.R. § 29.307

Proof of structure.

Title 14 C.F.R. ● ACTIVE Primary Source
Regulatory Text

14 C.F.R. § 29.307 — Proof of structure.

§ 29.307 Proof of structure. (a) Compliance with the strength and deformation requirements of this subpart must be shown for each critical loading condition accounting for the environment to which the structure will be exposed in operation. Structural analysis (static or fatigue) may be used only if the structure conforms to those structures for which experience has shown this method to be reliable. In other cases, substantiating load tests must be made. (b) Proof of compliance with the strength requirements of this subpart must include— (1) Dynamic and endurance tests of rotors, rotor drives, and rotor controls; (2) Limit load tests of the control system, including control surfaces; (3) Operation tests of the control system; (4) Flight stress measurement tests; (5) Landing gear drop tests; and (6) Any additional tests required for new or unusual design features. (Secs. 604, 605, 72 Stat. 778, 49 U.S.C. 1424, 1425) [Doc. No. 5084, 29 FR 16150, Dec. 3, 1964, as amended by Amdt. 29-4, 33 FR 14106, Sept. 18, 1968; Amdt. 27-26, 55 FR 8001, Mar. 6, 1990]

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR14-SEC-934CD5
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
14 C.F.R. § 29.307
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
53fe83903842c651...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 14 C.F.R. § 29.307 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 14 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 14 14 C.F.R. § 29.307