10 C.F.R. · Energy
10 C.F.R. § 503.22

Site limitations.

Title 10 C.F.R. ● ACTIVE Primary Source
Regulatory Text

10 C.F.R. § 503.22 — Site limitations.

§ 503.22 Site limitations. (a) Eligibility. Section 211(a)(2) of the Act provides for a temporary exemption due to a site limitation. To qualify for such an exemption, a petitioner must certify that: (1) One or more specific physical limitations relevant to the location or operation of the proposed facility exist which, despite diligent good faith efforts, cannot be overcome before the end of the proposed exemption period; (2) The petitioner will be able to comply with the applicable prohibitions of the Act at the end of the proposed exemption period; and (3) No alternate power supply exists, as required under § 503.8 of these regulations. Note: Examples of the types of site limitations to which a petitioner may certify in order to qualify for this exemption include: (i) Inaccessability of alternate fuels as a result of a specific physical limitation; (ii) Unavailability of transportation facilities for alternate fuels; (iii) Unavailability of adequate land or facilities for handling, using, or storing an alternate fuel; (iv) Unavailability of adequate land or facilities for controlling and disposing of wastes, including pollution control equipment or devices necessary to assure compliance with applicable environmental requirements; (v) Unavailability of adequate and reliable supply of water, including water for use in compliance with applicable environmental requirements; or (vi) Other site limitations exist which will not permit the location or operation of the proposed unit using an alternate fuel. (b) Evidence required in support of a petition. The petition must include the following evidence in order to make the demonstration required by this section: (1) Duly executed certifications required under paragraph (a) of this section; (2) Exhibits containing the basis for the certifications required under paragraph (a) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption); and (3) The anticipated duration of the site limitation which constitutes the basis for the exemption. (c) Duration. This temporary exemption, taking into account any extensions and renewals, may not exceed five years. [46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52894, Dec. 22, 1989]

Source: ecfr.gov · govinfo.gov — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record Root-LD v1.0 · boisestandard.org
Federation ID
BS-CFR10-SEC-5AA1EB
Entity Class
REGULATION / FEDERAL-CFR-SECTION
Domain Signature
boisestandard.org
Citation
10 C.F.R. § 503.22
Corpus
CFR — Code of Federal Regulations
Status
✓ ACTIVE
Source
PRIMARY-SOURCE
Source Verified
✓ TRUE
Content Hash
e1ef491272c2db33...
Semantic Edges
Pending — corpus passes queued
The regulatory text of 10 C.F.R. § 503.22 is reproduced from the official Code of Federal Regulations as published by the Office of the Federal Register and the National Archives and Records Administration.
Navigate Corpus — Title 10 C.F.R.
◈ Provenance
boisestandard.org United States Law CFR Title 10 10 C.F.R. § 503.22