Middleton, Idaho · Municipal Code
City Code of Middleton · Canyon County

5-4-14-3: CROSS CONNECTION INSPECTION:

Municipal Law ● Active Middleton, Idaho Canyon County
Ordinance Text

5-4-14-3: CROSS CONNECTION INSPECTION:

5-4-14-3: CROSS CONNECTION INSPECTION:
   A.   Safety Predetermined: No water shall be delivered to any structure hereafter built within the City or within areas served by City water until the same shall have been inspected by the City for possible cross connection and approved as being free of same.
   B.   Extra Protection Justified: Any construction for industrial or other purposes which is classified as a hazardous facility pursuant to subsection 5-4-14-2A7 of this chapter, where it is reasonable to anticipate intermittent cross connections, or as determined by the City, shall be protected by the installation of one or more backflow prevention devices at the point of service from the public water supply or any other location designated by the City.
   C.   Periodic Inspection: Inspections shall be made periodically of all buildings, structures or improvements of any nature now receiving water through the City's system, for the purpose of ascertaining whether cross connections exist. Such inspections shall be made by the City. (Ord. 554, 3-18-2015; amd. Ord. 609, 7-3-2018)
Source: American Legal Publishing — codelibrary.amlegal.com — public domain Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record boisestandard.org · municipal corpus
Federation ID
bs-aml-mid-7b2a55e652d778ba
Doc ID
0-0-0-2329
Domain Signature
boisestandard.org
Jurisdiction
Middleton, Idaho — United States
City
Middleton
County
Canyon County
Publisher
American Legal Publishing
Source Verified
✓ TRUE
Navigate — Middleton City Code of Middleton
◈ Provenance
boisestandard.org United States Idaho Middleton Middleton Municipal Code 5-4-14-3: CROSS CONNECTION INSPECTION: