Ordinance Text
1. Type 1 Ministerial Decisions:
1. Type 1 Ministerial Decisions:
1. Type 1 Ministerial Decisions:
A. Sign Permit for On-Premise Sign:
(1) Applicability:
(a) Except as otherwise exempted by Section 11-04-012.4, Signs Not Requiring a Permit, it shall be unlawful to erect, construct, enlarge, move, or convert any sign without first obtaining a Sign Permit.
(b) A Sign Permit shall not be required for a change of copy on a sign, nor for the repainting, cleaning, or other normal maintenance or repair for which a permit has previously been issued provided that the sign or sign structure is not altered in any way.
(2) Procedure:
(3) Findings for Approval:
(a) The Planning Director shall approve the application, or approve it with conditions, if it complies with the criteria in Section 11-05-04.6.A(3)(a), Decision by Planning Director, City Official, or Hearing Examiner, including, but not limited to compliance with the standards in Section 11-04-012, Signs.
(b) No condition attached to the approval of any Sign Permit shall include any form of content regulation prohibited by state or federal law.
B. Temporary Use Permit:
(1) Applicability:
(2) A Temporary Use Permit is required for each use listed as a Temporary Use in Table 11-03.1: Table of Allowed Uses or any use with a planned duration of 180 days or less. Procedure:
(3) Findings for Approval: The Planning Director shall approve the application, or approve it with conditions, if it complies with the criteria in Section 11-05-04.6.A(3)(a), Decision by Planning Director, City Official, or Hearing Examiner, including but not limited to compliance with the standards in Section 11-03-03.7, Temporary Uses.
C. Zoning Compliance Review:
(1) Applicability: A Zoning Compliance Review is required to confirm compliance with the applicable standards of this Code and may include but are not limited to the following:
(a) Minor exterior commercial building or Multiple-Family Dwelling changes including but not limited to:
i. Addition or removal of a window that complies with Code standards;
ii. Change of exterior building material that complies with applicable design standards; and
iii. Change in awning type, such as fabric to metal or aluminum, that complies with applicable design standards;
(b) Accessory structures over 1,000 square feet in area or over 22 feet in height; and
(c) Commercial fences.
(2) Procedure:
(3) Findings for Approval: The Planning Director shall approve the application, or approve it with conditions, if it complies with the criteria in Section 11-05-04.6.A(3)(a), Decision by Planning Director, City Official, or Hearing Examiner.
Source: American Legal Publishing — codelibrary.amlegal.com — public domain
Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record
boisestandard.org · municipal corpus
Federation ID
bs-aml-boi-b892bf9f7e61f0cc
Doc ID
0-0-0-69321
Domain Signature
boisestandard.org
Jurisdiction
Boise, Idaho — United States
City
Boise
County
Ada County
Publisher
American Legal Publishing
Source Verified
✓ TRUE
Navigate — Boise City Code of Boise City
Nearby Sections
11-05-01: PURPOSE:11-05-02: SUMMARY TABLE OF REVIEW AND DECISIO11-05-03: REVIEW AND DECISION-MAKING BODIES:11-05-04: COMMON PROCEDURES:11-05-05: SPECIFIC PROCEDURES:1. Type 1 Ministerial Decisions:2. Type 2 Administrative Decisions:3. Type 3 Decisions by an Appointed Body:4. Type 4 Major Decisions by City Council:11-05-06: NONCONFORMITIES:11-05-07: VIOLATIONS, ENFORCEMENT, AND PENALTCHAPTER 11-06 DEFINITIONS11-06-01: MEANINGS OF WORDS GENERALLY:11-06-02: RULES OF MEASUREMENT:11-06-03: DEFINITIONS:
Boise Municipal Code — public domain
← Boise Code Index