10-2-9-2: WAIVER OF REQUIREMENT TO CONNECT:
A. Conditions: The Public Works Department may waive the connection requirements of section 10-2-4-3 of this chapter if the public health does not require immediate connection and the department finds any of the following:
1. Within five (5) years prior to the date upon which connection fees are due, the individual wastewater disposal system serving the building for which a connection waiver is sought, was installed or rebuilt in accordance with a permit issued by the Central District Health Department. If the individual wastewater disposal system was installed three (3) years or less from the date sewer connection fees are due, a waiver may be granted for a period not to exceed five (5) years from the date of installation. If the individual wastewater disposal system was installed more than three (3) years from the date sewer connection fees are due, a waiver may be granted for a period of up to two (2) years from the date such waiver is sought;
2. The single-family dwelling for which a connection waiver is sought is located on a parcel of land five (5) acres or more in size;
3. The owner of a building is experiencing financial hardship. Financial hardship shall be deemed to exist when an owner's annual family gross income is at or below the income level indicated for a family of similar size on the current "Moderate Income Guidelines" chart employed by the City in the administration of the Community Development Block Grant Program, and shall be verified by the previous year Federal Tax return; or
4. The owner of the property has prepaid connection fees prior to sewer being available in accordance with subsection 10-2-6-3G of this chapter.
B. Application: Application for the waiver must be made by the building owner, prior to the date connection fees are due, in accordance with the waiver procedures set forth in section 10-2-9-4 of this chapter. (1952 Code § 8-11-09.02)
Source: American Legal Publishing — codelibrary.amlegal.com — public domain
Official Source ↗
Root-LD Entity Data
◈ Machine-Readable Provenance Record
boisestandard.org · municipal corpus
Federation ID
bs-aml-boi-f9afd84fde23aae2
Doc ID
0-0-0-12521
Domain Signature
boisestandard.org
Jurisdiction
Boise, Idaho — United States
City
Boise
County
Ada County
Publisher
American Legal Publishing
Source Verified
✓ TRUE
Navigate — Boise City Code of Boise City
Nearby Sections
10-2-8-6: DEFERRAL OF FERMENTED BEVERAGE PROD10-2-8-7: DEFERRAL OF TRUNK AND TREATMENT CON10-2-8-8: DEFERRAL OF EQUIVALENT ASSESSMENT F10-2-9: WAIVERS AND APPEALS:10-2-9-1: WAIVER OF INDIVIDUAL PHYSICAL CONNE10-2-9-2: WAIVER OF REQUIREMENT TO CONNECT:10-2-9-3: WET LINE WAIVER:10-2-9-4: WAIVER PROCEDURES; COMMERCIAL TREAT10-2-9-5: SEWAGE PUMP APPEAL FOR UNDUE HARDSH10-2-9-6: SERVICE CHARGES AND CAPITAL FEES AP10-2-9-7: APPEAL OF DECISION TO DISCONNECT SE10-2-9-8: APPEAL PROCEDURES:10-2-9-9: APPEAL FROM DECISION OF COMMISSION:10-2-10: PROHIBITIONS:10-2-10-1: INTERFERENCE WITH CITY SEWER SYSTE
Boise Municipal Code — public domain
← Boise Code Index